FORD WSB-M4G278-B2-2014 SEALER GASKET FOAM-IN-PLACE NITROGEN EXPANDING NON-TACKY TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD WSB-M4G278-B).pdf
《FORD WSB-M4G278-B2-2014 SEALER GASKET FOAM-IN-PLACE NITROGEN EXPANDING NON-TACKY TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD WSB-M4G278-B).pdf》由会员分享,可在线阅读,更多相关《FORD WSB-M4G278-B2-2014 SEALER GASKET FOAM-IN-PLACE NITROGEN EXPANDING NON-TACKY TO BE USED WITH FORD WSS-M99P1111-A (Shown on FORD WSB-M4G278-B).pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATIONMaterial Name Specification NumberDate Action Changes1995 12 05 Revised Revised para 3.5.14, 5.3, 5.4, 5.51995 11 22 Activated W. Curtiss G. MolnarWP 3948-a Page 1 of 10 SEALER/GASKET, FOAM-IN-PLACE NITROGEN EXPANDING, TACKY WSB-M4G278-BSEALER/GASKET, FOAM-IN-PLACE
2、 NITROGEN EXPANDING, NON-TACKY WSB-M4G278-B21. SCOPEWSB-M4G278-B:The material defined by this specification is a sealant that is mixed withan inert gas such as nitrogen or carbon-dioxide to form a tacky, expandedelastomeric foam gasket.WSB-M4G278-B2:The material defined by this specification is a se
3、alant that is mixed withan inert gas such as nitrogen or carbon-dioxide to form a non-tacky,expanded elastomeric foam gasket.2. APPLICATIONThis material is intended for use in areas where a water, dust, and airbarrier is required. These applications include, but are not limited to:interior trim, and
4、 HVAC (Heat Ventilation Air Conditioning). This materialcan be robotically applied.This material is not intended for use in engine compartment applications.Applications should be avoided where the material may come in contact withengine oil, gasoline, diesel fuel, automatic transmission fluid, solve
5、ntcleaners or degreasers, as degradation of the material will occur.This specification does not define all the intended uses of this material.Each application/substrate/coating/foam level combination must be evaluatedaccording to the applicable performance specification and/or designrequirements.3.
6、REQUIREMENTS3.1 QUALITY SYSTEM REQUIREMENTSMaterial suppliers and part producers must conform to Quality SystemRequirements, QS-9000. Material specification requirements are to beused for initial qualification of materials. A Control Plan forongoing production verification is required. This plan mus
7、t bereviewed and approved by the relevant Ford Materials activity and/orFord Supplier Technical Assistance (STA) prior to production partssubmission. Appropriate statistical tools must be used to analyzeprocess/product data and assure consistent processing of thematerial.2014 10 17 N Status B2 - no
8、replacement named L. Sinclair, NAB2- NOT TO BE USED FOR NEW DESIGNENGINEERING MATERIAL SPECIFICATIONWSB-M4G278-B/B2WP 3948-b Page 2 of 10 Part producers using this material in their products, must use Fordapproved materials and must conform to a process control plan whichhas been approved by STA and
9、/or the relevant Materials Activity.3.2 INFRARED SPECTROPHOTOMETRY AND/OR THERMAL ANALYSISFord Motor Company, at its option, may conduct infrared and/ortherma l analysis of material/parts supplied to this specification.The IR spectra and thermograms established for i nitial approval shallconst itute
10、 the reference standard and shall be kept on file at thedesignated material laboratory. All samples sha ll produce IR spectraand thermograms that correspond to the reference standard when testedunder the same conditions.3.3 CONDITIONING AND TEST CONDITIONSAll test values indicated herein are based o
11、n ma terial conditioned ina control led atmosphere of 23 +/- 2 C and 50 +/- 5 % relativehumidity for not less than 24 h prior to testing and tested under thesame conditions unless otherwise specified.3.4 UNFOAMED BULK MATERIAL3.4.1 Solids, min 97 %(ASTM D 2834, except heat at177 C for 4 h in a mecha
12、nicaloven)3.4.2 Ash +/- 5 %(ISO 3541, Method A, 760 +/- 30 C,based on solids weight)3.4.3 Specific Gravity(ASTM D 297)The specific gravity to lerance for any one supplier shall be+/- 0.3 based on the recorded specific gravity of theoriginal approved production sample, reference para 5.2.3.4.4 Soften
13、ing Point +/- 15 C(ASTM E 28)The softening point tolerance for any one supplier shall be+/- 15 deg based on the softening point of the originalapproved production sample, reference para 5.3.3.4.5 Needle Penetrometer +/- 2 mm(ASTM D 1321, 200 g/5 sec/23 C). The needle penetration tolerance for any on
14、e suppliershall be +/- 2 based on the recorded needle penetrationof the original approved production sample, referencepara 5.4.ENGINEERING MATERIAL SPECIFICATIONWSB-M4G278-B/B2WP 3948-b Page 3 of 10 3.4.6 Viscosity (Brookfield)(ASTM D 3236)Thermosel spindle #SC4-27. At 191 C, 5 rpm +/- 40 %. At 204
15、C, 5 rpm +/- 40 %The vi scosity tolerance for any one supplier shall be +/-40 % based on the recorded viscosity of the orig inal approvedprod uction sample. In all cases, the viscosity shall bewithi n the process limits as identified on the materialcontrol plan, reference para 5.5.3.5 FOAMED GASKET
16、MATERIALNote: Unless otherwise specified, testing is done at a foamreduction density of 55 %.Procedure: An unfoamed sample of the material is dispensed to aspeci fic volume. A foamed sample is dispensed to the same volume,the wei ghts of both samples are recorded. Calculations are asfollows:1 - weig
17、ht of foamed sample/weight of unfoamed sample x 100 =Percent Foam Reduction3.5.1 Tensile Strength, min 130 kPa(ASTM D 412, Die A)3.5.2 Elongation, min 350 %(ASTM D 412, Die A)3.5.3 Tear Resistance, min 0.5 kN/m(ASTM D 624, Die C)3.5.4 Compression Set, max 20 % after 24 h(ASTM D 1056, Method B)3.5.5
18、Water Absorption 5 % max by weight(SAE J18)3.5.6 Cold Flexibility No evidence ofcrackingTest Met hod: Expose a specimen 200 mm in length to atempe rature of - 40 C for 5 h. Bend 180 degrees arounda 13 mm temperature controlled mandrel.ENGINEERING MATERIAL SPECIFICATIONWSB-M4G278-B/B2WP 3948-b Page 4
19、 of 10 3.5.7 Compression Deflection(ASTM D 1056)Original (as received) 10 - 40 kPaAfter 24 h in the following fluids:Engine Coolant at 90 C(50/50 WSE-M97B44-B (coolant and tap water)(Climate Control Applications Only)% change from original, max +/- 35 %Test Method: The test specimen should have a 6.
20、 5 cm2 surfacearea and approximately 13 mm thickness. The thi ckness can beobtained by plying 3 layers of the foamed sealer. Compressspecimen 25 % of original thickness at a rate of 25.4 mm/min.3.5.8 Plasticizer Exudation No exudationevidentTest Method: Prepare two test samples as follows:Apply 15 +
21、/- 0.5 g of the material to the center of a 75 x 75x 6.4 mm glass plate. Place the sealer in contact with theelectrocoated surface of a 75 x 75 x 0.89 mm panel preparedac cording to para 5.5. Compress the assembly until these aler covers approximately 50 % of the 75 x 75 mm area ofthe glass.Clamp th
22、e assemblies to prevent shifting of the glass (# 4,75 mm wide bulldog clam ps have been found suitable). Exposeone a ssembly for 30 minutes at 121 +/- 3 C. Expose theremai ning assembly for 72 hours at 70 +/- 1 C. Duringexposure, the panels shall be in a horizontal position withthe glass at the top.
23、 After exposure, examine the areasurrou nding the sealer for evidence of any exudedplasticizer.3.5.9 Tackiness WSB-M4G278-B 200 N/m widthWSB-M4G278-B2 200 N/m widthSample Preparation:Prepar e test samples by casting of molding 1.1 to 1.4 mmthick test plaques. The test surface should be formedagainst
24、 a smooth silico ne coated release paper. Cut 5 25 mmx 150 mm test strips from the plaques. Laminate a strip ofmaskin g tape, or equivalent, to the back of each sample toreinforce the material and minimize elongation e ffects on thetest results.ENGINEERING MATERIAL SPECIFICATIONWSB-M4G278-B/B2WP 394
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSBM4G278B22014SEALERGASKETFOAMINPLACENITROGENEXPANDINGNONTACKYTOBEUSEDWITHFORDWSSM99P1111ASHOWNONFORDWSBM4G278BPDF

链接地址:http://www.mydoc123.com/p-749193.html