FORD UC800-2007 PAINT PROCESSING OF CAR AND VAN BODIES《小汽车和货车车身的油漆工艺》.pdf
《FORD UC800-2007 PAINT PROCESSING OF CAR AND VAN BODIES《小汽车和货车车身的油漆工艺》.pdf》由会员分享,可在线阅读,更多相关《FORD UC800-2007 PAINT PROCESSING OF CAR AND VAN BODIES《小汽车和货车车身的油漆工艺》.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、 Printed Copies are Uncontrolled Page 1 of 23 Standard Number UC800 Issue Date: January 2007 European Manufacturing Standard Rev: 20070115 PAINT PROCESSING OF CAR AND VAN BODIES 1.0 PURPOSE: This procedure describes the general process and controls for the pre-treatment, electrocoating, priming, pai
2、nting and corrosion protection of passenger car and van bodies within Paint and Final Assembly Engineering. It must be used in conjunction with GSPAS (where applicable) and the individual Model Paint Process Sheets to provide full processing details. The designator SC indicates that this property is
3、 a significant characteristic which effects vehicle capability to satisfy corrosion warranty requirements and which requires special controls. 1.1 Procedure The procedures described are as follows:- Materials Section 2 Pre-Treatment and Phosphating Section 3 Electrocoating Section 4 Sealing and Body
4、 Protection Section 5 Primer Surfacer Application Section 6 Enamel Application Section 7 Paintshop Panel Repairs Section 8 Complete Body Paintshop Repairs Section 9 Wax Protection Section 10 Garage Paint Repairs Section 11 Baking Cycles Section 12 Film Thickness Requirements Section 13 Quality and M
5、anufacturing Targets Section 14 Abbreviations and References Appendix A Printed Copies are Uncontrolled Page 2 of 23 Standard Number UC800 Issue Date: January 2007 European Manufacturing Standard Rev: 20070115 2 MATERIALS: 2.1 All production, non-production and post-production materials, including n
6、ecessary additives must be approved in accordance with procedure FAP 03-132. 2.2 Only paint materials, which have been approved in accordance with Vehicle Operations Operating Procedure VOP PTG-205 and have undergone a suitable production line trial can be used in paint processing operations. 2.3 Al
7、l materials must have full C2 clearance status from the GMAP computer system and have been approved for use in their specific applications and locations by the responsible Plant Medical, Safety, Fire and Environmental Officers. 2.4 A control plan for ongoing production verification is required to as
8、sure consistent processing of materials. Appropriate statistical tools such as Statistical Process Control must be used in the analysis of process and product data. 2.5 All Paintshop production and non-production materials shall be free of crater inducing materials when tested in accordance with FLT
9、M BI 125-01. 3 PRE-TREATMENT AND PHOSPHATING 3.1 Preliminary Clean-up - BIW Area Bodies shall be free from foreign material. Exterior surfaces should be solvent wiped to remove residual sealants, grease, oil, chalk and stamping marks etc. 3.2 Treatment of Areas Discoloured by Heat - BIW Operations A
10、ny discolouration caused by welding or brazing on the outer or critical customer visible interior surfaces shall be removed by sanding machine. Final sanding must always be completed with a minimum of 400grit. The disking of protective coated steels, such as zinc coated, and galvannealed steel must
11、be avoided at all cost, as not to adversely affect the corrosion protection properties of this material. 3.3 Preliminary Cleaning and Fitting of Slave Tooling The complete body in white surface must be cleaned by an automated process to ensure the absence of oil or alkaline residues, fingerprints, c
12、orrosion, weld spatter, mold release agents, dirt and any foreign material. This will avoid cross contamination of the phosphate system and further downstream processes. The approved and released cleaning material, as detailed in the Model Paint Process Sheets (GSPAS) must be used. To allow satisfac
13、tory cleaning and Phosphating of enclosed areas all closures shall be retained in a partially open position by slave tools as depicted on the Model Paint Process Sheets. Printed Copies are Uncontrolled Page 3 of 23 Standard Number UC800 Issue Date: January 2007 European Manufacturing Standard Rev: 2
14、0070115 3.4 Phosphating Phosphating of bodies shall be carried out using an automatic spray, spray-dip or full dip system. All internal and external surfaces of Phosphated bodies must meet the requirements of specification WSS-M3P1-D (Performance, Phosphate Coating, Zinc). Phosphate coating weights
15、and specification references are described in Paragraph 13.1. 3.5 Phosphate Draining relevant Model Paint Process Sheets are to be followed. All over sanding, should be avoided, and sand through to metal must be avoided. Paper no coarser than 600 grit should be used for final sanding. Sanded through
16、 areas of finished bodies must meet Performance Specification WSS-M2P-180-A requirements. 5.0 SEALING AND BODY PROTECTION 5.1 Sealants, including caulking compound, plugs, adhesive tapes and NVH, shall be applied in line with relevant Model Paint Process Sheets and the Model Sealer Manual. Clean are
17、as should be masked with either mechanical or disposable masks. Any surface contamination must be removed by wiping with clean lint free cloths and/or an approved solvent 5.2 Under body coating material may be applied, either manually or automatically, to areas shown on individual Model Paint Proces
18、s Sheets. Clean areas should be masked with either mechanical or disposable masks. Any surface contamination must be removed by wiping with clean lint free cloths or spatulas. Printed Copies are Uncontrolled Page 5 of 23 Standard Number UC800 Issue Date: January 2007 European Manufacturing Standard
19、Rev: 20070115 5.3 Body skid mounting areas that are not coated with underbody material must be protected with an approved repair material prior to the underbody wax application. This may be achieved by brushing or spraying. Film thickness and specification requirements are detailed in the Model Pain
20、t Process Sheets and Model Sealer Manual reference Paragraph 13.3 5.4 Pre-gelling of the sealants and underbody coating is recommended to facilitate the removal of excess sealer and underbody coating overspray and also to prevent contamination of automatic ostrich feather machines. The baking cycle
21、is described in Paragraph 12.3 and 12.11. 6 PRIMER SURFACER APPLICATION 6.1 Cleaning of Electrocoat Primed Bodies Before entry into the Primer Spraybooth all exterior surfaces should be blown-off with dry oil-free deionised air (to standard ISO 8573 class 3) followed by, an automatic ostrich feather
22、 dusting machine with subsequent manual tack wipe using approved tack rags. 6.2 Application of Lower Body Stonechip Protective Stone chip protective primer should be applied automatically to the areas specified on relevant Model Paint Process Sheets and over coated wet on wet with a minimum of 20 pr
23、imer surfacer. Film thickness requirements are detailed in Paragraph 13.4. 6.3 Application of Primer Surfacer the first coat by electrostatic bells and the second coat electrostatically or pneumatically. For optimum usage and appearance 60 70 % of the film weight should be applied in the first coat
24、and 30 40 % in the second (however, this ratio should be optimised for individual colours). 1-minute flash-off between coats is recommended. 7.5.1 Before application of the solvent based Clearcoat, the water based Basecoat must be: flashed-off for 1 minute minimum Infra-red heated for 1 minute to 80
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDUC8002007PAINTPROCESSINGOFCARANDVANBODIES 小汽车 货车 车身 油漆 工艺 PDF

链接地址:http://www.mydoc123.com/p-748285.html