FORD FLTM BP 114-2-2001 FUEL PERMEATION BY RECIRCULATION.pdf
《FORD FLTM BP 114-2-2001 FUEL PERMEATION BY RECIRCULATION.pdf》由会员分享,可在线阅读,更多相关《FORD FLTM BP 114-2-2001 FUEL PERMEATION BY RECIRCULATION.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、FORD LABORATORY TEST METHOD BP 114-02 2001 O924 FUEL PERMEATION BY RECIRCULATION Revised Editorial - no technical change A. Cockman Application This test method determines the permeation of liquids, exhibiting high vapor pressures, through tubing walls, while controlling temperature and pressure ind
2、ependently of each other. This is achieved in a recirculating system in which liquids permeated through the tubing walls are collected by a controlled flow of nitrogen (dry) and absorbed on activated carbon. Materials and Apparatus Required Permeation Test Station (Design EMS) 11 Graduated Cylinder
3、(2 - 4) 41 Flask for fuel mixing and use as a reservoir Balance (0.01 g readability) Silicon tubing (1 - 3 meters) Adjustable wrench (2) Vacuum pump Compression fittings for 3/8 and 5/16 inch O.D. tubes Fumehood Gloves Glasses Fuel mixtures (as specified) Nitrogen (cylinder or supply line) Activated
4、 carbon beads 6 - 14 mesh I Date I Action I Revisions I Copyright02001, Ford Global Technologies, Inc FORD LABORATORY TEST METHOD BP 114-02 Conditioning and Test Conditions All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 OC and 50 +/- 5 % rel
5、ative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified. Procedure A. To connect the tubing to be tested into the glass test chamber refer to Figure 1 1. Remove the cover from the glass test chamber 2. If necessary, cut tubing to identic
6、al lengths. 3. Insert the tubing through the openings of the cover. 4. Using compression fittings, connect the tubing to the quick connects 5. 6. Using compression fittings, connect the tubing to the U joint. Insert the connected tubing into the test chamber. 7. Clamp down the cover making sure that
7、 a complete and uniform seal is obtained B. Label the collection bottles (containing the carbon beads) for identification purposes. C. Weigh and record the exact weight and time weighed for each collection bottle (Chart 1). Do not remove the bottle heads for weighing. D. Turn on water bath heater an
8、d adjust to required temperature. E. Fill the steel holding vessel with the fuel mixture. 1. Ensure all valves are closed (Figure 2). 2. 3. Connect the fuel reservoir with silicon tubing to valve #I. Open valves #I, #2, and #3. 4. Turn on the vacuum pump. The fuel mixture will be drawn into the stee
9、l holding vessel. Page 2 of 8 Copyright0 2001, Ford Global Technologies, Inc FORD LABORATORY TEST METHOD BP 114-02 5. When the vessel is full, close valves #I and #3. 6. Turn off the vacuum pump. 7. Remove fuel flask and silicon tubing. F. Pressurizing the Fuel Lines 1 Open valve #4. 2. Turn on the
10、nitrogen flow and carefully pressurize the system to the required pressure (.e., 2 bar, 4 bar), making sure of the absence of leaks. (Do not pressurize over 1 O bar.) 3. Close valve #4 and shut off nitrogen flow. 4. Open valve #2 and start the gasoline pump. 5. Fill the Collection System with the Ni
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDFLTMBP11422001FUELPERMEATIONBYRECIRCULATIONPDF

链接地址:http://www.mydoc123.com/p-747434.html