FORD FLTM BL 103-2-2001 CAVITATION EROSION - CORROSION CHARACTERISTICS OF ENGINE COOLANTS ON ALUMINUM COOLANT PUMPS (Replaces FLTM BL 003-02).pdf
《FORD FLTM BL 103-2-2001 CAVITATION EROSION - CORROSION CHARACTERISTICS OF ENGINE COOLANTS ON ALUMINUM COOLANT PUMPS (Replaces FLTM BL 003-02).pdf》由会员分享,可在线阅读,更多相关《FORD FLTM BL 103-2-2001 CAVITATION EROSION - CORROSION CHARACTERISTICS OF ENGINE COOLANTS ON ALUMINUM COOLANT PUMPS (Replaces FLTM BL 003-02).pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、FORD LABORATORY TEST METHOD BL 103-02 2001 0822 CAVITATION EROSION - CORROSION CHARACTERISTICS OF ENGINE COOLANTS ON ALUMINUM COOLANT PUMPS Revised Editorial - no technical change A. Cockman Application This is a bench test procedure used to determine the effect of engine coolants on cavitation eros
2、ion- corrosion of aluminum coolant pumps. Apparatus Required Aluminum Coolant Pump Cavitation-Erosion Test Stand (See Illustration and Parts List, Figure 1 .) Aluminum Coolant Pump Capable of 4800 +/- 100 rpm at 40 +/- 2 OC and generating an inlet vacuum of 40 +/- 5 kPa and an outlet pressure of 103
3、 +/- 3 kPa Motor 5 horsepower minimum. Inlet Restriction Plate 20 mm inside diameter sharp edge orifice in 6 mm thick steel plate x 45 mm outside diameter. (Refer to View A, Figure 1 .) Conditioning and Test Conditions All test values indicated herein are bsed on material conditioned in a controlled
4、 atmosphere of 23 +/- 2 OC and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified. Procedure 1. Clean stand thoroughly before ech test. Steam cleaning of the stand has been found to be satisfactory. Other cleaning proc
5、edures that do not leave residue in the system may be used. Reassemble the stand using new rubber hoses. I Date I Action I Revisions I Copynght02001, Ford Global Technologies, Inc FORD LABORATORY TEST METHOD BL 103-02 2. Install pump on test stand. Use new gaskets each time the pump is installed. Do
6、 not use a gasket sealer. 3. The coolant under test shall be 15 % by volume of the coolant concentrate and 85 % corrosive test water per ASTM D 2809, Section 5. Analyze mixture for inhibitor concentration and specific gravity. 4. Fill the test stand with the test coolant. 5. Start the test run and a
7、djust to the following conditions: (a) (b) (c) (d) Pump speed 4800 +/- 100 rpm. Coolant temperature 40 +/- 2 OC; (#I9 in Figure 1). System outlet pressure 103 +/- 3 kPa; (#32 in Figure 1). Pump inlet pressure 34 - 51 kPa vacuum; (#31 in Figure 1). 6. After the above conditions are obtained, increase
8、 the coolant temperature to 1 18 +/- 2 O C. 7. The pump is operated for a total of 1000 hours. The test is interrupted at 100, 300, and 600 hours. The stand is allowed to cool. The coolant then is drained and saved for reinstallation. The pump is removed and the interior is visually inspected and ra
9、ted from 1 to 10 (see Attachment A for rating system). A 60 mL coolant sample is taken and analyzed for inhibitor concentration and specific gravity. The test is restarted and run to the next inspection. 8. The report shall include the following information: The Test Method Number (FLTM BL 103-02) P
10、ump Type (Part Number) Coolant Identification Percent depletion of inhibitors and initial and final specific gravity Rating of pump condition at 100 h, 300 h, 600 h, and 1000 h Denote the number of hours to test termination (.e., until pump leaks or (Photograph pump at each inspection) 1 O00 h, whic
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDFLTMBL10322001CAVITATIONEROSIONCORROSIONCHARACTERISTICSOFENGINECOOLANTSONALUMINUMCOOLANTPUMPSREPLACESFLTMBL00302PDF

链接地址:http://www.mydoc123.com/p-747147.html