FORD FLTM BA 116-01-2014 BOLT PULL OUT PROCEDURES.pdf
《FORD FLTM BA 116-01-2014 BOLT PULL OUT PROCEDURES.pdf》由会员分享,可在线阅读,更多相关《FORD FLTM BA 116-01-2014 BOLT PULL OUT PROCEDURES.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 FORD LABORATORY TEST METHOD BA 116-01 Date Action Revisions Rev. 0 2014 10 16 Released K. Mueller Controlled document at www.MATS Copyright 2014, Ford Global Technologies, LLC Page 1 of 5 BOLT PULL OUT PROCEDURES Application This test procedure is used to evaluate out-of-plane and in-plane bolt pul
2、l out force on test panels or flat sections of parts. Originally intended for aeroshields or underbody shields and wheel arch/well liners. Apparatus Required Universal Testing Machine (Tensile) Capable of: Movable crosshead with rate of separation: 50 mm/minute Load cell capacity: 5000 N Recording d
3、evice relating crosshead separation and load Sample Fixtures Method A 2 steel rings used as clamps with 130 +/- 5 mm nominal ID, (inner diameter) to achieve secure hold of sample (no slippage). Clamps or steel strips to hold rings in place. See Figure A. Bolt: M6-1.0 120 mm long (6 mm diameter, 1.0
4、thread, 120 mm length) with nut Washer: fender type, M6 x 18, 1.6 mm thick Gripper jaws or other device to hold the bolt Method B Clevis pin 6 mm diameter, or equivalent Spacers A fixture consisting of a U shape steel holder with a 25 mm nominal gap of between its vertical plates and 6 mm diameter h
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDFLTMBA116012014BOLTPULLOUTPROCEDURESPDF

链接地址:http://www.mydoc123.com/p-746880.html