FORD FLTM BA 113-1-2001 SPOT WELDING ACCEPTANCE TEST FOR ZINC ZINC IRON AND ZINC ALLOY COATED LOW CARBON STEEL SHEET (Replaces FLTM BA 013-01).pdf
《FORD FLTM BA 113-1-2001 SPOT WELDING ACCEPTANCE TEST FOR ZINC ZINC IRON AND ZINC ALLOY COATED LOW CARBON STEEL SHEET (Replaces FLTM BA 013-01).pdf》由会员分享,可在线阅读,更多相关《FORD FLTM BA 113-1-2001 SPOT WELDING ACCEPTANCE TEST FOR ZINC ZINC IRON AND ZINC ALLOY COATED LOW CARBON STEEL SHEET (Replaces FLTM BA 013-01).pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 FORD LABORATORY TEST METHOD BA 113-01 Date Action Revisions 2001 03 02 Revised Editorial no technical change A. Cockman 1991 02 22 Printed copies are uncontrolled Page 1 of 5 Copyright 2001, Ford Global Technologies, Inc. SPOT WELDING ACCEPTANCE TEST FOR ZINC, ZINC/IRON AND ZINC/ALLOY COATED LOW CA
2、RBON STEEL SHEET Application This procedure defines the welding acceptance test for zinc, zinc/iron and zinc/alloy coated low carbon steel sheet. All such steels must pass a minimum of 2000 welds. Some may require a higher number of welds to failure. Consult the appropriate Engineering Material Spec
3、ification for exceptions. Apparatus Required Spot Welder This test shall be conducted on an air-operated single point press-type spot welder featuring a low inertia welding system and, in general, complying with the Resistance Welders Manufacturing Association specifications for the size of machine
4、required. It shall be equipped with a Ford-approved resistance welding control featuring 90 firing and delayed conduction heat control. It shall have electrode force capacities to meet the requirement of the range of material to be tested at 550 kPa line pressure. The transformer shall be selected t
5、o meet the secondary current requirements at heat control settings between 75 % and 100 %. The welder must be equipped with electrode holders conforming to Ford Manufacturing Standard WH 1032C or WH 1033C and shall have furnished to it sufficient water flow capacity so that 7.6 litres per minute wil
6、l flow through each electrode holder as isolated circuits from the water-cooled transformer, secondary conductors, control panel, etc. Coating Thickness Shall be determined by strip weight method or suitable testing instrument. Dial Caliper - Brown WC1-1A26B; WC1-1AA26C, WC1-1AA27D (select for steel
7、 thickness). . Cap Adapter WB1-S35, WB1-1S36, or WB1-1S37 (code for desired length). . Electrode Holder Assembly - Manufacturing Standard WH 1032C or WH 1033 C. Duffers Secondary Current Meter . Model 8120 or equivalent. Procedure Preparation of Material The material for spot weld qualification shal
8、l be representative of production practices in the ordered minimum thickness. Submission shall be in full-width sheets of at least 915 mm in width. The galvanized material under test shall be supplied in full coil width. 100 mm shall be trimmed from each edge and scrapped. The material shall be shea
9、red in 100 x 300 mm pieces across the full trimmed width. From selected representative pieces, a number of 30 x 100 mm coupons which are free from burrs will be prepared from the material under test. Care shall be exercised so as not to remove any oils used for corrosion or shipping protection. Coat
10、ed Galvanized Coating thickness on each side of 100 x 300 mm panels shall be measured and the heavier coated side shall always be against the electrodes. 2,000 Spot Weld Acceptance Test Electrode Alignment and Conditioning The electrode caps shall be installed in the machine in precise vertical alig
11、nment and with faces parallel when subjected to the electrode force requirement for the material under test. Tip faces may be dressed to parallel by rotating a sheet of emery paper (folded over a single weld coupon) between the tips, at low tip dressing force. Alignment is to be checked by welding o
12、n a single coupon of uncoated steel (at low current and 2 - 5 cycles weld time) to assure uniformity of the heat pattern. Caps are to be conditioned by making a series of 25 welds, at welding currents just below expulsion on 100 x 300 mm panels of the actual test material. Use the proper schedule li
13、sted in Table I for making these conditioning welds. FORD LABORATORY TEST METHOD BA 113-01 Page 3 of 5 Copyright 2001, Ford Global Technologies, Inc. Setting and Establishing Button Size Using 30 x 100 mm test coupons and the weld schedule shown in Table I, two welds will be placed on their center l
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDFLTMBA11312001SPOTWELDINGACCEPTANCETESTFORZINCZINCIRONANDZINCALLOYCOATEDLOWCARBONSTEELSHEETREPLACESFLTMBA01301PDF

链接地址:http://www.mydoc123.com/p-746877.html