FORD ESB-M4G300-C-1993 SEALER INJECTION MOLDED OR EXTRUDED POLYOLEFIN HEAT EXPANDING FAST CURE《快速固化型热膨胀型注塑或挤塑聚烯径密封剂》.pdf
《FORD ESB-M4G300-C-1993 SEALER INJECTION MOLDED OR EXTRUDED POLYOLEFIN HEAT EXPANDING FAST CURE《快速固化型热膨胀型注塑或挤塑聚烯径密封剂》.pdf》由会员分享,可在线阅读,更多相关《FORD ESB-M4G300-C-1993 SEALER INJECTION MOLDED OR EXTRUDED POLYOLEFIN HEAT EXPANDING FAST CURE《快速固化型热膨胀型注塑或挤塑聚烯径密封剂》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATIONMaterial Name Specification NumberDate Release No. Release/Revision1993 07 01 NB00E10293471003 Released D.DiGregorio E.RezendesWP 3948-a Page 1 of 11 SEALER, INJECTION MOLDED OR EXTRUDED ESB-M4G300-CPOLYOLEFIN, HEAT EXPANDING, FAST CURE1. SCOPEThe mate rial defined
2、 by this specification is an injection molded orextruded uncured ethylene vinyl acetate base sealer which exhibits rapidexpansion upon exposure to heat. It can be used only in plants withelectrocoat paint systems.2. APPLICATIONThis s pecification was originally released for material used to seal fue
3、lfiller housings to body side panels and wheelhouse to outer panels. Themateri al is normally stapled, heat staked, or snapped in position, and isused on oily galvanized and CRLC steel surfaces. Recomme nded cure schedulesare 1 0 minutes at 171 C metal temperature minimum, and 30 minutes at 205C met
4、al temperature maximum.Compliance with this material specification does not guarantee theexpandab le sealer will function for all potential applications on avehicle. The specific design condition should be evaluat ed by a plant trialor laboratory simulation prior to release of the material.3. REQUIR
5、EMENTS3.1 STATISTICAL PROCESSSupplie rs must conform to the requirements of Ford Quality systemStand ard Q-101. A mutually acceptable Control Plan as describedtherein is required for material/source approval. Appropriatestatist ical tools must be used to analyze process/product data sothat variation
6、 in the final product is continuously reduced.3.2 INFRARED SPECTROPHOTOMETRY AND/OR THERMAL ANALYSISAll samples shall produce IR spectra and thermogram that correspondto the reference standard when tested under the same conditions. The infrared spectra or thermograms established for initial approval
7、shall constitute the re ference standard and shall be kept on file atthe designated material laboratory.ENGINEERING MATERIAL SPECIFICATIONESB-M4G300-CWP 3948-b Page 2 of 11 3.3 CONDITIONING AND TEST CONDITIONSAll Test values indicated herein are based on materials conditionedin a co ntrolled atmosph
8、ere of 23 +/- 2 C and 50 +/- 5 % relativehumidity for 24 h prior to testing and tested under the sameconditions unless otherwise specified.3.4 DIMENSIONS As specified on engineeringdrawing and/or in trim use 1.0 - 1.1 mmCRLC steel-oiled. Cure three samples at 143 C and 205 C. Allow samples to cool t
9、o 23 +/- 2 C for 1 h minimum. Calcula te the percent expansion as the relationship between themaxim um expanded thickness of the cured material (dimension“X“-Fig. 1) and the uncured thickness of the original sample (“T“).Percent Expansion = X - T x 100-T. Using a hot knife, disassemble test samples
10、by cutting the curedsealer along the s urface of panel “A“ - Fig. 1. The cured sealershall be resilient to the touch and exhibit a uniform cellstructure.3.8 WATER ABSORPTION, max 5 %(FLTM BV 117-01 Method “A“, 8 h soaktime,material cure schedules per para 5.3)3.9 SHEAR ADHESION STRENGTH, kPa, minThe
11、 minimum adhesion values indicated shall be obtained by allcoupons in each exposure group when subjected to the followingenvironments:ENGINEERING MATERIAL SPECIFICATIONESB-M4G300-CWP 3948-b Page 3 of 11 3.9.1 Normal - 24 h at 23 +/- 2 C 7003.9.2 14 d at 83 +/- 2 C 7503.9.3 14 d at 38 +/- 1 C and 98
12、+/- 2 % R.H. 6003.9.4 Salt Spray, 240 h 200(ASTM B 117)3.9.5 Thermal Cycle (5 times) 750. 4 h at 82 +/- 2 C. 4 h at 38 +/- and 98 +/- 2 % R.H. 16 h at - 30 +/- 1 C. 4 h at 38 +/- 1 C and 98 +/- 2 % R.H. 4 h at 82 +/- 2 C. 16 h at - 30 +/- 1 CSa mple Preparation: Reference FLTM BV 1-6; uncured materi
13、althickness per para 5.5, bondline thickness after cure 1.8 - 3.3mm, substrates per para 6.2, material cure temperature per para5.3.Prepa re five samples per exposure per bake schedule. Aftercuring, condition coupons for 24 h at 23 +/- 2 C. Prior tobeginning exposure tests.Test Method: Subject test
14、assemblies to exposures noted. Aftercompleting exposur e, the test specimens shall be conditioned at a23 +/- 2 C fo r a minimum of 2 h and a maximum of 3 h prior totesting on a tensile machine at a jaw separation rate of 25mm/minute.3.10 CORROSION RESISTANCE, min 500 h(ASTM B 117)3.10.1 CRCL Steel -
15、 OiledSurface rust within 7.0 mm of the perimeter of the cured sealer ispermissible after disassembly of test assemblies.Test Method:. Prepare four test assemblies as shown in Fig. 2A. Cure two samples at each of the bake s chedules indicated in para5.3. Condition samples 24 h at 23 +/- 2 C.ENGINEER
16、ING MATERIAL SPECIFICATIONESB-M4G300-CWP 3948-b Page 4 of 11 . Remove clamps and subject the four cured assemblies to 500 hsalt spray per ASTM B 117. After exposure, disassemble panels and examine metal surfacesunder sealer for evidence of corrosion . Surface corrosion shallnot extend more than 7.0
17、mm inside of sealer perimeter.3.10.2 CRCL Steel ElectrocoatedThere shall b e no evidence of corrosion under the sealer on eitherpanel surface.Test Method:. Prepare four test assemblies as shown in Fig. 2B. Electr ocoat four assemblies in a production paint system orequi valent laboratory batch tank.
18、 Electrocoating to beconducted with the assistance of quali fied Ford paint personnel.Note: When e lectrocoating in a production facility, oiled CRLCsteel test as semblies are to be processed through the phosphatesystem. If s amples are electrocated in a batch tank, Parker 40panels should be used to
19、 construct the test assemblies. Cure two samples at each of the bake s chedules indicated in para5.3. El ectrocoated assemblies to be cured in a verticalposition with the 150 mm long side parallel to bottom of oven. After curing, remove clamps and condition 24 h at 23 +/- 2 C.Subject cured assemblie
20、s to 500 h salt spray per ASTM B 117. After exposure, disassemble panels and examine metal surfacesunder sealer for corrosion. There shall be no evidence ofcorrosion beneath the sealer on either steel panel.3.11 LOW TEMPERATURE RESISTANCEThere shall be no evidence of adhesive or cohesive failure aft
21、er thetest assemblies have accumulated 100 cold slams at - 30 +/- 1 C.Test Method:. Prepare two test samples as shown in Fig. 3. Cure on sample at each of the bake sch edules indicated in para 5.3.Cure samples in a horizontal position.ENGINEERING MATERIAL SPECIFICATIONESB-M4G300-CWP 3948-b Page 5 of
22、 11 . Condition samples at 23 +/- 2 C for a minimum of 24 h. Place two test assemblies and cold sla m apparatus described in FLTMBV 101-02 in a cold box and condition at - 30 +/- 1 C for a minimumof 4 h. Individually mount panels on the cold slam apparatus with bonded100 x 300 mm panel at bottom sid
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDESBM4G300C1993SEALERINJECTIONMOLDEDOREXTRUDEDPOLYOLEFINHEATEXPANDINGFASTCURE 快速 固化 热膨胀 注塑 挤塑聚烯径 密封剂

链接地址:http://www.mydoc123.com/p-745604.html