ETSI TS 132 651-2012 Digital cellular telecommunications system (Phase 2+) Telecommunication management Configuration Management (CM) GERAN network resources Integration Reference .pdf
《ETSI TS 132 651-2012 Digital cellular telecommunications system (Phase 2+) Telecommunication management Configuration Management (CM) GERAN network resources Integration Reference .pdf》由会员分享,可在线阅读,更多相关《ETSI TS 132 651-2012 Digital cellular telecommunications system (Phase 2+) Telecommunication management Configuration Management (CM) GERAN network resources Integration Reference .pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TS 132 651 V11.0.0 (2012-10) Digital cellular telecommunications system (Phase 2+); Telecommunication management; Configuration Management (CM); GERAN network resources Integration Reference Point (IRP); Requirements (3GPP TS 32.651 version 11.0.0 Release 11) GLOBAL SYSTEM FOR MOBILE COMMUNICA
2、TIONSRTechnical Specification ETSI ETSI TS 132 651 V11.0.0 (2012-10)13GPP TS 32.651 version 11.0.0 Release 11Reference RTS/TSGS-0532651vb00 Keywords GSM ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF
3、742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice Individual copies of the present document can be downloaded from: http:/www.etsi.org The present document may be made available in more than one electronic version or in print. In any case of ex
4、isting or perceived difference in contents between such versions, the reference version is the Portable Document Format (PDF). In case of dispute, the reference shall be the printing on ETSI printers of the PDF version kept on a specific network drive within ETSI Secretariat. Users of the present do
5、cument should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at http:/portal.etsi.org/tb/status/status.asp If you find errors in the present document, please send your comment to one of the fo
6、llowing services: http:/portal.etsi.org/chaircor/ETSI_support.asp Copyright Notification No part may be reproduced except as authorized by written permission. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2012. All ri
7、ghts reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members. 3GPPTM and LTE are Trade Marks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trade Marks registered and
8、 owned by the GSM Association. ETSI ETSI TS 132 651 V11.0.0 (2012-10)23GPP TS 32.651 version 11.0.0 Release 11Intellectual Property Rights IPRs essential or potentially essential to the present document may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is pu
9、blicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ET
10、SI Web server (http:/ipr.etsi.org). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or
11、may become, essential to the present document. Foreword This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP). The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or GSM identities. These s
12、hould be interpreted as being references to the corresponding ETSI deliverables. The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under http:/webapp.etsi.org/key/queryform.asp. ETSI ETSI TS 132 651 V11.0.0 (2012-10)33GPP TS 32.651 version 11.0.0 Release 11Contents Intelle
13、ctual Property Rights 2g3Foreword . 2g3Foreword . 4g3Introduction 4g31 Scope 5g32 References 5g33 Definitions and abbreviations . 5g33.1 Definitions 5g33.2 Abbreviations . 6g34 Requirements 6g3Annex A (informative): Change history . 7g3History 8g3ETSI ETSI TS 132 651 V11.0.0 (2012-10)43GPP TS 32.651
14、 version 11.0.0 Release 11Foreword This Technical Specification has been produced by the 3rdGeneration Partnership Project (3GPP). The contents of the present document are subject to continuing work within the TSG and may change following formal TSG approval. Should the TSG modify the contents of th
15、e present document, it will be re-released by the TSG with an identifying change of release date and an increase in version number as follows: Version x.y.z where: x the first digit: 1 presented to TSG for information; 2 presented to TSG for approval; 3 or greater indicates TSG approved document und
16、er change control. y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections, updates, etc. z the third digit is incremented when editorial only changes have been incorporated in the document. Introduction The present document is part of a TS-family cov
17、ering the 3rdGeneration Partnership Project; Technical Specification Group Services and System Aspects; Telecommunication management; as identified below: 32.651: Configuration Management (CM); GERAN network resources Integration Reference Point (IRP); Requirements 32.652: Configuration Management (
18、CM); GERAN network resources Integration Reference Point (IRP); Network Resource Model (NRM) 32.656: Configuration Management (CM); GERAN network resources Integration Reference Point (IRP); Solution Set (SS) definitions Configuration Management (CM), in general, provides the operator with the abili
19、ty to assure correct and effective operation of the 3G network as it evolves. CM actions have the objective to control and monitor the actual configuration on the Network Elements (NEs) and Network Resources (NRs), and they may be initiated by the operator or by functions in the Operations Systems (
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITS1326512012DIGITALCELLULARTELECOMMUNICATIONSSYSTEMPHASE2TELECOMMUNICATIONMANAGEMENTCONFIGURATIONMANAGEMENTCMGERANNETWORKRESOURCESINTEGRATIONREFERENCEPDF

链接地址:http://www.mydoc123.com/p-743326.html