ETSI TS 103 202-3-2015 Core Network and Interoperability Testing (INT) GTPv2-C Conformance Testing for S11 Interface (3GPP Release 10) Part 3 Abstract Test Suite (ATS) and partial _1.pdf
《ETSI TS 103 202-3-2015 Core Network and Interoperability Testing (INT) GTPv2-C Conformance Testing for S11 Interface (3GPP Release 10) Part 3 Abstract Test Suite (ATS) and partial _1.pdf》由会员分享,可在线阅读,更多相关《ETSI TS 103 202-3-2015 Core Network and Interoperability Testing (INT) GTPv2-C Conformance Testing for S11 Interface (3GPP Release 10) Part 3 Abstract Test Suite (ATS) and partial _1.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TS 103 202-3 V1.1.1 (2015-12) Core Network and Interoperability Testing (INT); GTPv2-C Conformance Testing for S11 Interface; (3GPPTMRelease 10); Part 3: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) pro forma specification floppy3TECHNICAL
2、 SPECIFICATION ETSI ETSI TS 103 202-3 V1.1.1 (2015-12)2 Reference DTS/INT-00092-3 Keywords ATS, conformance,GTPv2-C, S11, PIXIT ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non
3、 lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice The present document can be downloaded from: http:/www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of
4、the present document shall not be modified without the prior written authorization of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific ne
5、twork drive within ETSI Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at http:/portal.etsi.org/tb/status/status.asp If you find errors in the
6、 present document, please send your comment to one of the following services: https:/portal.etsi.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as aut
7、horized by written permission of ETSI. The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2015. All rights reserved. DECTTM, P
8、LUGTESTSTM, UMTSTMand the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members. 3GPPTM and LTE are Trade Marks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trade Marks registered and owned by the GSM Associ
9、ation. ETSI ETSI TS 103 202-3 V1.1.1 (2015-12)3 Contents Intellectual Property Rights 5g3Foreword . 5g3Modal verbs terminology 5g31 Scope 6g32 References 6g32.1 Normative references . 6g32.2 Informative references 7g33 Definitions and abbreviations . 7g33.1 Definitions 7g33.2 Abbreviations . 7g34 Ab
10、stract Test Method (ATM) . 7g34.1 Introduction 7g34.2 Test architecture . 7g34.2.1 Test method 7g34.2.2 Test machine configuration. 8g34.2.2.1 Test configurations for testing the MME 8g34.2.2.2 Test configurations for testing the S-GW 9g34.2.3 Interconnection of TS and SUT 11g34.2.3.1 MME Role. 11g3
11、4.2.3.1.1 Configuration f_cf01_S11Up_MME . 11g34.2.3.1.2 Configuration f_cf02_S11Up_MME . 12g34.2.3.2 S-GW Role 13g34.2.3.2.1 Configuration f_cf01_S11Up_SGW . 13g34.2.3.2.2 Configuration f_cf02_S11Up_SGW . 14g34.2.3.2.3 Configuration f_cf03_S11Up_SGW . 14g35 ATS conventions 15g35.1 Introduction 15g3
12、5.2 Testing conventions 15g35.2.1 Test cases Preamble and Postamble 15g35.3 Naming conventions . 15g35.3.1 General guidelines 15g35.3.2 Test case grouping 16g35.3.3 Test case identifiers 16g3Annex A (normative): DIAMETER S11 Partial PIXIT pro forma . 17g3A.1 The right to copy 17g3A.2 Identification
13、summary. 17g3A.3 ATS summary 17g3A.4 Test laboratory 17g3A.5 Client identification 17g3A.6 SUT 18g3A.7 Protocol layer information 18g3A.7.1 Protocol identification 18g3A.8 PIXIT items 18g3A.8.1 S11 related PIXIT items . 18g3ETSI ETSI TS 103 202-3 V1.1.1 (2015-12)4 Annex B (normative): GTPv2-C on S11
14、 interface Abstract Test Suite (ATS) 20g3Annex C (informative): GTPv2-C on S11 interface Test Purpose Language (TPLAN) descriptions . 21g3History 22g3ETSI ETSI TS 103 202-3 V1.1.1 (2015-12)5 Intellectual Property Rights IPRs essential or potentially essential to the present document may have been de
15、clared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, whi
16、ch is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/ipr.etsi.org). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in
17、ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Specification (TS) has been produced by ETSI Technical Committee Core Network and Interoperability Testing (INT). The present document is part 3 of
18、a multi-part deliverable. Full details of the entire series can be found in part 1 9. Modal verbs terminology In the present document “shall“, “shall not“, “should“, “should not“, “may“, “need not“, “will“, “will not“, “can“ and “cannot“ are to be interpreted as described in clause 3.2 of the ETSI D
19、rafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allowed in ETSI deliverables except when used in direct citation. ETSI ETSI TS 103 202-3 V1.1.1 (2015-12)6 1 Scope The present document specifies the Abstract Test Suite (ATS) and partial Protocol Implementa
20、tion eXtra Information for Testing (PIXIT) pro forma for the test specifications for GTPv2-C protocol on the S11 interface as specified in ETSI TS 129 274 1 in compliance with the relevant requirements and in accordance with the relevant guidance given in ISO/IEC 9646-7 5 and ETSI ETS 300 406 6. The
21、 test notation used in the ATS is TTCN-3 (see ETSI ES 201 873-1 7). The following test specification and design considerations can be found in the body of the present document: the overall test suite structure; the testing architecture; the test methods and port definitions; the test configurations;
22、 TTCN styles and conventions; the partial PIXIT pro forma; the modules containing the TTCN-3 ATS. Annex A provides the Partial Implementation Extra Information for Testing (PIXIT) Pro forma. Annex B provides the Abstract Test Suite (ATS) part of the ATS. 2 References 2.1 Normative references Referen
23、ces are either specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the reference document (including any amendments) applies. Referenced docum
24、ents which are not found to be publicly available in the expected location might be found at http:/docbox.etsi.org/Reference. NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee their long term validity. The following referenced documents a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITS10320232015CORENETWORKANDINTEROPERABILITYTESTINGINTGTPV2CCONFORMANCETESTINGFORS11INTERFACE3GPPRELEASE10PART3ABSTRACTTESTSUITEATSANDPARTIAL_1PDF

链接地址:http://www.mydoc123.com/p-739909.html