ETSI TR 150 059-2001 Digital Cellular Telecommunications System (Phase 2+) Enhanced Data Rates for GSM Evolution (EDGE) Project Scheduling and Open Issues《数字蜂窝通信系统(第2+阶段) GSM发展的增强数.pdf
《ETSI TR 150 059-2001 Digital Cellular Telecommunications System (Phase 2+) Enhanced Data Rates for GSM Evolution (EDGE) Project Scheduling and Open Issues《数字蜂窝通信系统(第2+阶段) GSM发展的增强数.pdf》由会员分享,可在线阅读,更多相关《ETSI TR 150 059-2001 Digital Cellular Telecommunications System (Phase 2+) Enhanced Data Rates for GSM Evolution (EDGE) Project Scheduling and Open Issues《数字蜂窝通信系统(第2+阶段) GSM发展的增强数.pdf(72页珍藏版)》请在麦多课文档分享上搜索。
1、ETSI TR 150 059 V4.0.1 (2001-08) Technical Repor Digital cellular telecommunications system (Phase 2+); Enhanced Data rates for GSM Evolution (EDGE); Project scheduling and open issues (3GPP TR 50.059 version 4.0.1 Release 4) 3GPP TR 50.059 version 4.0.1 Release 4 1 ETSI TR 150 059 V4.0.1 (2001-08)
2、Reference RTR/TSGG-OIOOUVRI Keywords GSM ETSI 650 Route des Lucioles F-O6921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 O0 Fax: +33 4 93 65 47 16 Siret No 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-prfecture de Grasse (06) No 7803/88 Important notice Indi
3、vidual copies of the present document can be downloaded from: http:l/w.etsi .orq The present document may be made available in more than one electronic version or in print. In any case of existing or perceived difference in contents between such versions, the reference version is the Portable Docume
4、nt Format (PDF). In case of dispute, the reference shall be the printing on ETSI printers of the PDF version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the cu
5、rrent status of this and other ETSI documents is available at 3 If you find errors in the present document, send your comment to: Cori vriaht Notifica tion No part may be reproduced except as authorized by written permission. The copyright and the foregoing restriction extend to reproduction in all
6、media. O European Telecommunications Standards Institute 2001. All rights reserved. ETSI 3GPP TR 50.059 version 4.0.1 Release 4 2 ETSI TR 150 059 V4.0.1 (2001-08) Intellectual Property Rights IPRs essential or potentially essential to the present document may have been declared to ETSI. The informat
7、ion pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR O00 314: “Intellectual Property Rights (7PRs); Essential, orpotentially Essential, IPRs notlJied to ETSI in respect ofETSI standards“, which is available from the ETSI
8、Secretariat. Latest updates are available on the ETSI Web server (p). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR O00 3 14 (or the updates on the ETSI We
9、b server) which are, or may be, or may become, essential to the present document. Foreword This Technical Report (TR) has been produced by the ETSI 3d Generation Partnership Project (3GPP). The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identi
10、ties or GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables. The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under www.etsi.ornkey . ETSI 3GPP TR 50.059 version 4.0.1 Release 4 3 ETSI TR 150 059 V4.0.1 (2001-08) Contents
11、 Intellectual Property Rights 2 Foreword . 2 Foreword . 5 1 1.1 1.2 1.3 2 3 4 4.1 4.2 5 5.1 5.2 5.2.1 5.2.2 6 6.1 6.2 6.3 6.4 6.5 6.6 6.7 7 7.1 7.1.1 7.1.2 7.2 7.3 7.4 7.5 7.6 8 Scope 6 References 6 Abbreviations . 6 Support of specification work 6 General . 7 Requirements 7 Functional description 7
12、 EGPRS . 7 ECSD 8 Technical realisation and amendments . 8 Documentation Structure Overview . 8 Phased Introduction of Capability 8 Phase 1 EDGE 8 Phase 2 EDGE 8 Work item status . 8 SMG1 . 8 SMG2 9 SMG3 O SMG4 10 SMG7 10 SMG10 10 SMG12 10 Approvals Time Frame for EDGE . 10 Time frame for different
13、STCs . 10 Phase 1 10 Phase 2 13 EDGE phase 2 will be handled in the GERAN project plan 10.99. . 13 New Specifications . 13 Change Requests (EGPRS, ECSD Phase 1) . 13 Possible CRs required (Phase 1. EGPRS and ECSD) 17 Possible CRs required (Phase 1. COMPACT) . 19 Backwards compatibility 22 Annex 1: E
14、DGE related documents 23 Annex 2: EDGE service requirements 61 Annex 3: EDGE radio requirements . 64 A3.1 Bearer capabilities 64 A3.1.1 Bearer capabilities 64 A3.1.1.1 Enhanced GPRS 64 A3.1.1.2 Enhanced CSD 64 A3.1.2 Bearer service attributes . 65 A3.1.3 Hand over/cell re-selection . 65 A3.1.4 Mobil
15、e Stations 65 A3.1.5 Link adaptation . 65 A3.2 Operational requirements . 66 . ETSI 3GPP TR 50.059 version 4.0.1 Release 4 4 ETSI TR 150 059 V4.0.1 (2001-08) A3.2.1 Compatibility with services provided by present core networks 66 A3.2.2 Operating environments . 66 A3.2.3 Radio Access network plannin
16、g. 66 A3.2.4 Operators 66 A3.3 Efficient spectrum usage . .66 A3.3.1 Spectral Efficiency . A3.3.2 Spectrum utilisation A3.3.3 Coverage/capacity A3.3.4 Evolution requirements A3.3.4.1 Coverage evolution . A3.3.4.2 Capacity evolution. . 67 A3.4 Complexity / Cost . 67 A3.4.1 Mobile complexity and cost
17、. 67 A3.4.2 Network complexity and cost . . .67 A3.4.3 Mobile Station / Base Station types 68 A3.5 Requirements from bodies outside SMG . 68 A3.5.1 Electromagnetic compatibility . A3.5.2 RF Radiation effects . A3.5.3 Security A3.6 Co-existence with other systems 68 . A3.7 Further Work Areas 68 A3.7.
18、1 Services coordination . 68 A3.7.3 Measurements in existing GSM . 68 Annex 4: History . 69 Annex A: Change history . 70 History . .7 1 ETSI 3GPP TR 50.059 version 4.0.1 Release 4 5 ETSI TR 150 059 V4.0.1 (2001-08) Foreword This Technical Report has been produced by the 3d Generation Partnership Pro
19、ject (3GPP). The contents of the present document are subject to continuing work within the TSG and may change following formal TSG approval. Should the TSG modiSl the contents of the present document, it will be re-released by the TSG with an identiSling change of release date and an increase in ve
20、rsion number as follows: Version x.y.z where: x the first digit: 1 presented to TSG for information; 2 presented to TSG for approval; 3 or greater indicates TSG approved document under change control. y the second digit is incremented for all changes of substance, i.e. technical enhancements, correc
21、tions, updates, etc. z the third digit is incremented when editorial only changes have been incorporated in the document. ETSI 3GPP TR 50.059 version 4.0.1 Release 4 6 ETSI TR 150 059 V4.0.1 (2001-08) 1 Scope The purpose of the present document is to describe the schedules of the Enhanced Data rate
22、for GSM Evolution (EDGE) standardisation process and to view its current state and open issues that are still under discussion. It also lists the new standards and necessary amendments to the GSM/DCS phase 2+ specifications for the technical realisation of the function. 1 .I References The following
23、 documents contain provisions which, through reference in this text, constitute provisions of the present document. References are either specific (identified by date of publication, edition number, version number, etc.) or non-specific. For a specific reference, subsequent revisions do not apply. F
24、or a non-specific reference, the latest version applies. In the case of a reference to a 3GPP document (including a GSM document), a non-specific reference implicitly refers to the latest version of that document in the same Release as theyresent document. il 21 31 41 51 TDOC 246/98: “. 61 71 SI 91
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITR1500592001DIGITALCELLULARTELECOMMUNICATIONSSYSTEMPHASE2ENHANCEDDATARATESFORGSMEVOLUTIONEDGEPROJECTSCHEDULINGANDOPENISSUES

链接地址:http://www.mydoc123.com/p-737200.html