ETSI GSM 11 23-1994 GSM Signalling Aspects Base Station System Equipment Specification《GSM信令方面基站系统设备规范》.pdf
《ETSI GSM 11 23-1994 GSM Signalling Aspects Base Station System Equipment Specification《GSM信令方面基站系统设备规范》.pdf》由会员分享,可在线阅读,更多相关《ETSI GSM 11 23-1994 GSM Signalling Aspects Base Station System Equipment Specification《GSM信令方面基站系统设备规范》.pdf(212页珍藏版)》请在麦多课文档分享上搜索。
1、ETSI GSM*LL.23 94 = 3400855 0003852 LLb ETSI-GSM Tec hn cal Specification GSM 11.23 Version: 4.0.0 Date: June 1994 Key words: European Digital Cellular Telecommunications System, Global System for Mobile Communications (GSM). GSM Signalling Aspects Base Station System Equipment Specif ication ETSI E
2、uropean Telecommunications Standards Institute ETSI Secretariat Postal address: 06921 Sophia Antipolis Cedex - FRANCE Off ice address: Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE Tel.: +33 92 94 42 O0 - Fax: +33 93 65 47 16 This is an unpublished work the copyright in which vests in th
3、e European Telecommunications Standards Institute. All rights reserved. The information contained herein is the property of ETSI and no pari may be reproduced or used except as authorised by contract or other written permission. The copyright and the foregoing restriction on reproduction and use ext
4、end to all media in which the information may be embodied. ETSI GSM*:11.23 94 m 3400855 0003853 052 Page 3 GSM 11.23 v.4.0.0: June 1994 CONTENTS Foreword . 9 scope 11 Normative references 11 Definitions. symbols and abbreviations 11 Guide to Document . 11 4.1 Layer 2 signalling 11 4.2 Layer 3 signal
5、ling 11 4.3 Core Recommendations . 11 5.6 5.7 5.8 Testing of Layer 2 (LAPDm) functions . 12 5.2 Introduction 12 5.3 5.5 5.1 scope . 12 Layer 2 test frames . 12 5.4 General requirements . 13 Establishment of the dedicated physical resource . 14 5.5.1 MS-originated . 14 5.5.1.1 5.5.1.2 5.5.1.3 No Cont
6、ention resolution on FACCH ( No immediate 5.5.1.4 No contention resolution on SACCH ( Short Message Contention resolution on FACCH or SDCCH 14 No Contention resolution on FACCH or SDCCH . 15 Assign procedures) 16 5.5.2 BSS-originated 17 5.6.1 MS-originated . 17 5.6.2 BSS-originated 17 Signalling con
7、nections (SAPI4) . 19 Service) 17 Short Message Service 17 Release of the dedicated physical resource 17 5.5.2.1 LAPDm idle state 17 5.8.1 5.8.2 5.8.3 5.8.4 5.8.5 5.8.6 5.8.7 Link establishment 20 5.8.1.1 Normal initialisation (contention resolution) . 20 5.8.1.2 Initialisation failure (contention r
8、esolution) 20 Repeated SABM (loss of UA frame) 20 fields 21 5.8.1.3 Normal initialisation (no contention resolution) 23 Normal information transfer . 23 5.8.2.1 Sequence counting and I frame acknowledgements . 23 5.8.2.2 Receipt of an I frame in the timer recovery state . 26 5.8.2.3 Segmentation and
9、 Concatenation . 28 Normal Layer 2 release by MS 29 Normal Layer 2 release by BSS 30 Abnormal release 30 Frame loss 31 5.8.6.1 I Frame loss (BSS to BSSTE) 31 5.8.6.2 RR Response frame loss (BSSTE to BSS) . 32 5.8.6.3 RR response frame loss (BSS to BSSTE) 32 Reception of REJ frames 33 5.8.7.1 Data li
10、nk layer not in the timer recovery state . 33 5.8.7.2 Data link layer in the timer recovery state, reception of a 5.8.1.2.1 5.8.1.2.2 SABMs with different information REJ response frame . 34 Previous page is blank ETSI GSM*:LL.23 94 3400855 0003854 T M paw 4 GSM 11.23 v.4.0.0: June 1994 5.8.7.3 Data
11、 link layer in the timer recovery state. reception of a REJ command frame 35 Frame transmission with incorrect C/R values 36 5.8.8.1 I frame with C bit set to one . 36 5.8.8.2 SABM frame with C bit set to one 37 5.8.9 Link failure . 38 5.8.10 Errors in the Control Feld 40 5.8.10.1 N(S) sequence erro
12、r 40 5.8.1 0.2 N(R) sequence error . 42 5.8.1 0.3 Improper F bit 5.8.1 1 Receipt of invalid frames 44 Short Message Services (SMS) (SAPI=3) . 48 5.8.8 5.9 5.9.1 5.9.2 5.9.3 5.9.4 5.9.5 5.9.6 5.9.7 5.9.8 5.9.9 5.9.1 O 5.9.1 1 5.9.12 MS-originated link establishment 48 BSS-originated link establishmen
13、t 48 5.9.2.1 Normal initialisation (no contention resolution) . 48 5.9.2.2 Initialisation failure (no contention resolution) 49 5.9.2.3 Initialisation denial (no contention resolution) . 50 5.9.2.4 Total initialisation failure (no contention resolution) 51 Normal information transfer 52 Normal layer
14、 2 release by MS . 52 Normal Layer 2 release by BSS . 53 Abnormal release . 53 Frame loss 54 Reception of REJ frames . 55 5.9.8.1 Data link layer not in the timer recovery state 55 5.9.8.2 Data link layer in the timer recovery state. reception of a REJ response frame . 56 5.9.8.3 Data link layer in
15、the timer recovery state. reception of a REJ command frame 57 Frame transmission with incorrect C/R values 58 5.9.9.1 I frame with C bit set to one . 58 5.9.9.2 SABM frame with C bit set to one 59 Link failure . 61 Errors in the Control Field 62 Receipt of invalid frames 62 5.1 O 5.1 1 Layer 3 funct
16、ions . 62 Short Message SeMce Cell Broadcast (SMSCB) 63 6 INTERNAL A-BIS-INTERFACING 63 6.1 LAYER 1 . 63 6.2 SIGNALLING TRANSPORT MECHANISM. LAYER 2 . 64 6.2.1 Base Station Controller 64 6.2.1.1 Successful TE1 allocation - fixed TE1 . 64 6.2.1.2 Denied TE1 allocation - fixed TE1 . 65 6.2.1.3 Success
17、ful TE1 allocation - additional TE1 66 6.2.1.4 Denied TE1 allocation - additional TE1 67 Base Transceiver Station . 69 6.2.2.1 Successful TE1 allocation - fixed TE1 . 69 6.2.2.2 Denied TE1 allocation - fixed TE1 . 70 6.2.2.3 Successful TE1 allocation - additional TE1 72 6.2.2.4 Denied TE1 allocation
18、 - additional TE1 73 6.3 LAYER 3 . 74 6.2.2 7 Interfacing with the mobile servicesswitching centre . 75 7.1 Physical interface layer 1 . 75 7.2 Signalling transport mechanism. layer 2 . 75 7.3 Layer 3 protocol . 75 8 Base station system network aspects . 75 8.1 Base station system network functions
19、75 ETSI GSMw11.23 94 3400855 0003855 925 Page 5 GSM 11 . 23 v.4.0.0: June 1994 8.1.1 General75 8.1.2 Testing of the DTAP . 17 Messages from MSC to MS TI Messages from MS to MSC TI 8.1.2.1 8.1.2.2 Testing of the BSSMAP and RR functions 78 8.1.3 8.1.3.1 8.1.3.2 8.1.3.3 8.1.3.4 8.1.3.5 8.1.3.6 8.1.3.7
20、8.1.3.8 8.1.3.9 System information 80 8.1.3.1.1 System information . Dedicated resource set up . 80 8.1.3.1.2 System information . no dedicated resource established . 81 SeMce requests in SABM frames 83 Service requests in SABM frames . Allowed messages 83 SeMce requests in SABM frames . Not allowed
21、 messages 83 Random awss by MS and immediate assignment 84 8.1.3.3.1 Normal Case . SDCCH . 84 8.1.3.3.2 Normal Case . TCH 86 8.1.3.3.3 T3101 expiry case 88 8.1.3.3.4 No radio resources available . 89 Paging . 90 Measurement reporting 91 Assignment 91 8.1.3.6.1 Assignment . Normal case 91 8.1.3.6.2 A
22、ssignment . T10 expiry . 93 8.1.3.6.3 Assignment . Terrestrial resources already allocated . 94 8.1.3.6.4 Assignment . Reverse to old channel 95 Extemal handover as seen from the old BSS 96 8.1.3.7.1 Normal case . 96 8.1.3.7.2 T8 expiry 98 8.1.3.7.3 Reverse to old channel . 99 External handover as s
23、een from the new BSS . 101 8.1.3.8.1 Non-synchronized network . 101 8.1.3.8.1.1 Non-synchronized network . Normal Case . 101 8.1.3.8.1.2 Non-synchronized network . No LAPDm connexion . 103 8.1.3.8.1.3 Non-synchronized network . Bad Handover Reference 104 8.1.3.8.1.4 Non-synchronized network . Wrong
24、physical channel 105 8.1.3.8.1.5 Non-synchronized network . No radio resources available 106 8.1.3.8.1.6 Non-synchronized network . Clear Command from the MSC . 107 8.1.3.8.1.7 Non-synchronized network . No terrestrial resource available 108 8.1.3.8.2 Synchronized network 109 Internal handover 110 8
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSIGSM11231994GSMSIGNALLINGASPECTSBASESTATIONSYSTEMEQUIPMENTSPECIFICATIONGSM 方面 基站 系统 设备 规范 PDF

链接地址:http://www.mydoc123.com/p-734080.html