ETSI EN 300 132-3-0-2012 Environmental Engineering (EE) Power supply interface at the input to telecommunications and datacom (ICT) equipment Part 3 Operated by rectified current s.pdf
《ETSI EN 300 132-3-0-2012 Environmental Engineering (EE) Power supply interface at the input to telecommunications and datacom (ICT) equipment Part 3 Operated by rectified current s.pdf》由会员分享,可在线阅读,更多相关《ETSI EN 300 132-3-0-2012 Environmental Engineering (EE) Power supply interface at the input to telecommunications and datacom (ICT) equipment Part 3 Operated by rectified current s.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI EN 300 132-3-0 V2.1.1 (2012-02) Environmental Engineering (EE); Power supply interface at the input to telecommunications and datacom (ICT) equipment; Part 3: Operated by rectified current source, alternating current source or direct current source up to 400 V; Sub-part 0: Overview European St
2、andard ETSI ETSI EN 300 132-3-0 V2.1.1 (2012-02)2Reference REN/EE-02017-0 Keywords environment, interface, power supply ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucrati
3、f enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice Individual copies of the present document can be downloaded from: http:/www.etsi.org The present document may be made available in more than one electronic version or in print. In any case of existing or perceived difference in
4、 contents between such versions, the reference version is the Portable Document Format (PDF). In case of dispute, the reference shall be the printing on ETSI printers of the PDF version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the d
5、ocument may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at http:/portal.etsi.org/tb/status/status.asp If you find errors in the present document, please send your comment to one of the following services: http:/portal.et
6、si.org/chaircor/ETSI_support.asp Copyright Notification No part may be reproduced except as authorized by written permission. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2012. All rights reserved. DECTTM, PLUGTESTST
7、M, UMTSTMand the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members. 3GPPTM and LTE are Trade Marks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trade Marks registered and owned by the GSM Association. ET
8、SI ETSI EN 300 132-3-0 V2.1.1 (2012-02)3Contents Intellectual Property Rights 4g3Foreword . 4g31 Scope 5g32 References 5g32.1 Normative references . 6g32.2 Informative references 6g33 Definitions, symbols and abbreviations . 6g33.1 Definitions 6g33.2 Symbols 7g33.3 Abbreviations . 7g34 Interface A3
9、8g35 Power interface requirements . 8g3Annex A (informative): Power supply and interface considerations . 9g3A.1 Possible power supply configurations 9g3A.2 Supply voltage waveforms . 10g3Annex B (informative): Bibliography . 11g3History 12g3ETSI ETSI EN 300 132-3-0 V2.1.1 (2012-02)4Intellectual Pro
10、perty Rights IPRs essential or potentially essential to the present document may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs);
11、Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/ipr.etsi.org). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carrie
12、d out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This European Standard (EN) has been produced by ETSI Technical Commit
13、tee Environmental Engineering (EE). The present document is part 3 sub-part 0 of a multi-part deliverable covering Environmental Engineering (EE); Power supply interface at the input to telecommunications and datacom (ICT) equipment, as identified below: Part 1: “Operated by alternating current (ac)
14、 derived from direct current (dc) sources“; Part 2: “Operated by -48 V direct current (dc)“; Part 3-0: “Operated by rectified current source, alternating current source or direct current source up to 400 V, Sub-part 0: Overview“; Part 3-1: “Operated by rectified current source, alternating current s
15、ource or direct current source up to 400 V; Sub-part 1: Direct current source up to 400 V“; Part 3-2: “Operated by rectified current source, alternating current source or direct current source up to 400 V; Sub-part 2: Alternating up to 400 V solution“; Part 3-3: “Operated by rectified current source
16、, alternating current source or direct current source up to 400 V; Sub-part 3: Rectified current up to 400 V solution“. The parts 3-0 to 3-3 are the result of a revision of EN 300 132-3 3. This revision was necessary, because the present document was not clear. Sub-parts have been introduced for vol
17、tage interfaces A3 up to 400 V. NOTE 1: For parts 1 and 2, the nominal DC voltage is -48 or -60 V. NOTE 2: Not all the sub-parts or part 3 will be released at the same time. The first sub-parts that will be released are part 3-0 and 3-1. National transposition dates Date of adoption of this EN: 9 Fe
18、bruary 2012 Date of latest announcement of this EN (doa): 31 May 2012 Date of latest publication of new National Standard or endorsement of this EN (dop/e): 30 November 2012 Date of withdrawal of any conflicting National Standard (dow): 30 November 2012 ETSI ETSI EN 300 132-3-0 V2.1.1 (2012-02)51 Sc
19、ope The present document introduces a series of standards sub-parts specifying Power Supply Interface A3 at the input to telecommunications and datacom (ICT) equipment: Part 3-1: “Operated by rectified current source, alternating current source or direct current source up to 400 V; Sub-part 1: Direc
20、t Current source up to 400V“; Part 3-2: “Operated by rectified current source, alternating current source or direct current source up to 400 V; Sub-part 2: Alternating up to 400 V solution“. Part 3-3: “Operated by rectified current source, alternating current source or direct current source up to 40
21、0 V; Sub-part 3: Rectified current up to 400 V solution“. The power can be supplied at the interface by a single source or a multi-source system that may include batteries or back-up generators or renewable energy sources. The sub-part document aims at providing compatibility between the power suppl
22、y equipment and both the telecom/datacom (ICT) equipment. The same interface A3 can be used for other load units connected (e.g. control/monitoring, cooling system, etc.). The requirements at interface A3 defined in the sub-parts 1 to 3 apply to: the output of the power supply equipment or power sup
23、ply installation for powering telecommunications and datacom (ICT) equipment; the power supply input of telecommunications and datacom (ICT) equipment; other equipment power supply input compatible with this interface. The purpose of the present document is: to identify a power supply system with th
24、e same characteristics for all telecommunications and datacom (ICT) equipment defined in the area of application. The area of application may be telecom center or datacenter or customer premises (e.g. business buildings); to facilitate the standardization of power supply systems for telecommunicatio
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSIEN300132302012ENVIRONMENTALENGINEERINGEEPOWERSUPPLYINTERFACEATTHEINPUTTOTELECOMMUNICATIONSANDDATACOMICTEQUIPMENTPART3OPERATEDBYRECTIFIEDCURRENTSPDF

链接地址:http://www.mydoc123.com/p-727898.html