EN 61839-2014 en Nuclear power plants - Design of control rooms - Functional analysis and assignment.pdf
《EN 61839-2014 en Nuclear power plants - Design of control rooms - Functional analysis and assignment.pdf》由会员分享,可在线阅读,更多相关《EN 61839-2014 en Nuclear power plants - Design of control rooms - Functional analysis and assignment.pdf(26页珍藏版)》请在麦多课文档分享上搜索。
1、|BRITISH STANDARDBS IEC61839:2000ICS 27.120.20; 29.120.10NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWNuclear power plants Design of controlrooms Functional analysis andassignmentBS EN 61839:2014BS EN 61839:2014ISBN 978 0 580 84482 9Amendments/corrigenda issued since publica
2、tionDate Comments30 September 2014 This corrigendum renumbers BS IEC 61839:2000 as BS EN 61839:2014. Annex ZA insertedThis British Standard, having been prepared under the direction of the Engineering Sector Committee, was published under the authority of the Standards Committee and comes into effec
3、t on 15 November 2000 The British Standards Institution 2014. Published by BSI Standards Limited 2014National forewordThis British Standard is the UK implementation of EN 61839:2014. It is identical to IEC 61839:2000. It supersedes BS IEC 61839:2000, which is withdrawn.The UK participation in its pr
4、eparation was entrusted to Technical Committee NCE/8, Reactor instrumentation.A list of organizations represented on this committee can be obtained on request to its secretary.The publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correc
5、t application.Compliance with a British Standard cannot confer immunity from legal obligations.EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 61839 August 2014 ICS 27.120.20; 29.120.10 English Version Nuclear power plants - Design of control rooms - Functional analysis and assignment (IEC 6183
6、9:2000) Centrales nuclaires de puissance - Conception des salles de commande - Analyse fonctionnelle et affectation des fonctions (CEI 61839:2000) Kernkraftwerke - Auslegung von Warten - Analyse und Zuordnung der Funktionen (IEC 61839:2000) This European Standard was approved by CENELEC on 2014-08-0
7、4. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtain
8、ed on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to
9、the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece,
10、Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotec
11、hnique Europisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2014 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members. Ref. No. EN 61839:2014 E Page 2BS EN 61839:2014EN 61839:2000EN 61839:2
12、014 - 2 - Foreword This document (EN 61839:2014) consists of the text of IEC 61839:2000 prepared by SC 45A “Instrumentation, control and electrical systems of nuclear facilities“ of IEC/TC 45 “Nuclear instrumentation“. The following dates are fixed: latest date by which this document has to be imple
13、mented at national level by publication of an identical national standard or by endorsement (dop) 2015-08-04 latest date by which the national standards conflicting with this document have to be withdrawn (dow) 2017-08-04 As stated in the nuclear safety directive 2009/71/EURATOM, Chapter 1, Article
14、2, item 2, Member States are not prevented from taking more stringent safety measures in the subject-matter covered by the Directive, in compliance with Community law. In a similar manner, this European standard does not prevent Member States from taking more stringent nuclear safety measures in the
15、 subject-matter covered by this standard. Endorsement notice The text of the International Standard IEC 61839:2000 was approved by CENELEC as a European Standard without any modification. Page 3BS EN 61839:2014EN 61839:2000EN 61839:2014 - 2 - Foreword This document (EN 61839:2014) consists of the te
16、xt of IEC 61839:2000 prepared by SC 45A “Instrumentation, control and electrical systems of nuclear facilities“ of IEC/TC 45 “Nuclear instrumentation“. The following dates are fixed: latest date by which this document has to be implemented at national level by publication of an identical national st
17、andard or by endorsement (dop) 2015-08-04 latest date by which the national standards conflicting with this document have to be withdrawn (dow) 2017-08-04 As stated in the nuclear safety directive 2009/71/EURATOM, Chapter 1, Article 2, item 2, Member States are not prevented from taking more stringe
18、nt safety measures in the subject-matter covered by the Directive, in compliance with Community law. In a similar manner, this European standard does not prevent Member States from taking more stringent nuclear safety measures in the subject-matter covered by this standard. Endorsement notice The te
19、xt of the International Standard IEC 61839:2000 was approved by CENELEC as a European Standard without any modification. - 3 - EN 61839:2014 Annex ZA (normative) Normative references to international publications with their corresponding European publications The following documents, in whole or in
20、part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. NOTE 1 When an international publication has be
21、en modified by common modifications, indicated by (mod), the relevant EN/HD applies. NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available here: www.cenelec.eu. Publication Year Title EN/HD Year IEC 60964 1)1989 Design for control rooms of n
22、uclear power plants - - IEC 61771 1995 Nuclear power plants - Main control-room - Verification and validation of design - - 1) IEC 60964 is superseded by IEC 60964:2009, which is harmonized as EN 60964:2010. G139G3G37G54G44G3G20G20G16G21G19G19G19G38G50G49G55G40G49G55G54G51G68G74G72G41G50G53G40G58G50
23、G53G39G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17
24、G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G22G38G79G68G88G86G72G20 G54G70G82G83G72G3G68G81G71G3G82G69G77G72G70G87G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G17G
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN618392014ENNUCLEARPOWERPLANTSDESIGNOFCONTROLROOMSFUNCTIONALANALYSISANDASSIGNMENTPDF

链接地址:http://www.mydoc123.com/p-720650.html