EN 50518-3-2013 en Monitoring and alarm receiving centre - Part 3 Procedures and requirements for operation.pdf
《EN 50518-3-2013 en Monitoring and alarm receiving centre - Part 3 Procedures and requirements for operation.pdf》由会员分享,可在线阅读,更多相关《EN 50518-3-2013 en Monitoring and alarm receiving centre - Part 3 Procedures and requirements for operation.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、BSI Standards PublicationBS EN 50518-3:2013Monitoring and alarm receivingcentre -Part 3: Procedures and requirements foroperationBS EN 50518-3:2013 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of EN 50518-3:2013. It supersedes BS EN 50518-3:2011, which is withdrawn
2、.Relationship with other publicationsThe BS EN 50518 series of standards apply to alarm signals generated from intruder and hold-up alarm systems (I Part 2: Technical requirements; Part 3: Procedures and requirements for operation. This part of EN 50518 is to be read in conjunction with Part 1 and P
3、art 2, and cannot be used separately. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. BS EN 50518-3:2013EN 50518-3:2013 3 BS EN 50518-
4、3:2013EN 50518-3:2013 - 4 - Introduction This European Standard applies to all Monitoring and Alarm Receiving Centres (MARCs) that monitor and/or receive and/or process signals that require an emergency response. In all existing EN 50131 series accomplished under CLC/TC 79 “Alarm systems“, the abbre
5、viation ARC is used. To avoid confusion and to achieve consistency in terminology the abbreviation ARC will be used throughout this European Standard, where MARC is equivalent for ARC. It is noted that this European Standard cannot supersede any legislative requirements deemed necessary by a Nationa
6、l Government to control the security sector on a national basis. This European Standard cannot interfere with items that are regulated by (inter)national regulations concerning external services (e.g. water, wastewater, fuel supplies, gas, oil and mains power supplies). BS EN 50518-3:2013EN 50518-3:
7、2013 4 BS EN 50518-3:2013EN 50518-3:2013 - 4 - Introduction This European Standard applies to all Monitoring and Alarm Receiving Centres (MARCs) that monitor and/or receive and/or process signals that require an emergency response. In all existing EN 50131 series accomplished under CLC/TC 79 “Alarm
8、systems“, the abbreviation ARC is used. To avoid confusion and to achieve consistency in terminology the abbreviation ARC will be used throughout this European Standard, where MARC is equivalent for ARC. It is noted that this European Standard cannot supersede any legislative requirements deemed nec
9、essary by a National Government to control the security sector on a national basis. This European Standard cannot interfere with items that are regulated by (inter)national regulations concerning external services (e.g. water, wastewater, fuel supplies, gas, oil and mains power supplies). BS EN 5051
10、8-3:2013- 5 - EN 50518-3:2013 1 Scope This part of EN 50518 specifies the minimum procedures and requirements for the operation of an ARC. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For d
11、ated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 15713, Secure destruction of confidential material Code of practice EN 45011, General requirements for bodies operating product certification
12、systems (ISO/IEC Guide 65) EN 50518-1, Monitoring and alarm receiving centre Part 1: Location and construction requirements EN 50518-2, Monitoring and alarm receiving centre Part 2: Technical requirements EN ISO/IEC 17020, Conformity assessment Requirements for the operation of various types of bodi
13、es performing inspection (ISO/IEC 17020) 3 Terms, definitions and abbreviations 3.1 Terms and definitions For the purposes of this document, the terms and definitions given in EN 50518-1:2013 and EN 50518-2:2013 and the following apply. 3.1.1 alarm verification process to provide information additio
14、nal to the notified alarm which increases the probability that a genuine alarm has occurred 3.1.2 notified alarm alarm condition that has been passed to the ARC 3.1.3 security screening process of checking history and background of employees and potential employees SOURCE: EN 15602:2008, 2.2.6 3.1.4
15、 security vetting verification by the national authority of the judicial and criminal record of employees and potential employees SOURCE: EN 15602:2008, 2.2.7 3.1.5 relevant employment employment which involves, or may involve, the acquisition of, or access to, information or equipment, the improper
16、 use of which could involve the organisation, any client of the organisation or any third party in a security risk SOURCE: EN 15602:2008, 2.2.3 3.2 Abbreviations For the purposes of this document, the abbreviations given in EN 50518-1:2013 and EN 50518-2:2013 apply. BS EN 50518-3:2013EN 50518-3:2013
17、 5 BS EN 50518-3:2013EN 50518-3:2013 - 6 - 4 Staffing 4.1 General The ARC shall be continuously staffed by a minimum of two operators, unless the ARC is operating in conjunction with another ARC and the operational methods ensures that the result is equivalent to an ARC staffed by a minimum of two o
18、perators. Special care should be taken for TRX, see EN 50518-2:2013, Clause 4. 4.2 Security screening and vetting All ARC staff shall be screened for a minimum of five years up to the commencement of relevant employment with the ARC, or back to the date of ceasing full-time education. Security vetti
19、ng shall be obtained. A progress record shall be maintained to monitor and record the action taken and the information received during the screening and vetting process. If the individual is employed prior to the completion of the screening or vetting process then the individual shall be notified th
20、at employment is subject to satisfactory screening and vetting. 4.3 Training The company shall adhere to a training policy for all relevant employees covering theoretical and practical skills to meet the training requirements as laid down by the ARC. There shall be a period of training, appropriate
21、to ensure the minimum competency to carry out the specific duties, provided to all operators before they are allowed to handle alarms without supervision. Further training shall be given on specific subjects such as new technical equipment or changes in operational procedures. Training shall be docu
22、mented and reviewed at regular intervals. 5 Operating procedures 5.1 General Operating procedures shall be available to all operators and shall include procedures for the following: testing; entry and exit the ARC; database management; operational continuity and emergencies; evacuation procedures; s
23、ignal handling. 5.2 Testing The ARC technical equipment shall be checked for normal operation in accordance with EN 50518-2:2013, Clause 7, and the results recorded. BS EN 50518-3:2013EN 50518-3:2013 6 BS EN 50518-3:2013EN 50518-3:2013 - 6 - 4 Staffing 4.1 General The ARC shall be continuously staff
24、ed by a minimum of two operators, unless the ARC is operating in conjunction with another ARC and the operational methods ensures that the result is equivalent to an ARC staffed by a minimum of two operators. Special care should be taken for TRX, see EN 50518-2:2013, Clause 4. 4.2 Security screening
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN5051832013ENMONITORINGANDALARMRECEIVINGCENTREPART3PROCEDURESANDREQUIREMENTSFOROPERATIONPDF

链接地址:http://www.mydoc123.com/p-717224.html