1、BRITISH STANDARD Guide for procurement of power station equipment - Part 5-3: Wind turbines The European Standard EN 45510-5-31998 has the status of a British Standard ICs 27.040; 27.100 BS EN 45510-5-3:1998 NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW STD-BSI BS EN 95510-5
2、-3-ENGL 1998 = LbZLibbS Ob98125 1TB BS EN 46610-53:1998 Amd. No. National foreword Date Text affected This British standard is the English language version of EN 455105-31998. The UK participation in its preparation was entnisted to khnical Committee W - monitor related international and European de
3、velopments and promulgate them in the UK. A list of organizations represented on this committee can be obtained on request to its secretary Cross-references The British Standards which implement international or European publications referre to in this document may be found in the BSI Standards Cata
4、logue under the section entitled “internationai Standards Correspondence index“, or by using the “Find“ facility of the BSI Standards Electronic Catalogue. A British Standad does not purport to include ali the necessary provisions of a conlmct. Users of British Standards are responsible for their co
5、rrect application. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages This document comprises a front cover, an inside front cover, the EN title page, pages 2 to 14, an inside back cover and a back cover. This British Standard, having been
6、prepared under the direction of the Engineering SectorBoard,waspubiished under the authority of the Standards Board and comes into effect on 16 May 1998 O BSI 1998 ISBN O 580 29221 5 - STD-BSI BS EN 45510-5-3-ENGL 1778 M Lb2Libb7 0b7812b O34 m EUROPEAN STANDARD EN 4551053 NORME EXJR0PEE“E EUROP- NOR
7、M January 1998 ICs 27.100: 27.180 Descriptors: Electric power stations, turbines, wind turbines, purchase, user supplier relations, invitation of tenders, specifications, technical writing English version Guide for procurement of power station equipment - Part 53: Wind turbines Guide pour iacquisiti
8、on dquipements destins aux centrales de production d1eCtscit. - Partie 53: ILirbines oliennes Leitfaden fr die Beschaffung von Ausrustungen fur Kraftwerke - %il 53: Wmdturbinen This European Standard was approved by CEN/CENELEC on 11 December 1997. CENKENELEC membem are bound to comply with the CENI
9、CENELEC Inkd Regulations which stipulate the conditions for giving this European standard the status of a national standard without any dteration. Up-tdak lists and bibliographical references concerning such national standards may be obtained on application to the Centrai Secretariat or to any CENKE
10、NELEC member. This European Standard exists in three officiai versions (English, French, German). A version in any other language made by translation under the responsibility of a CENKENELEC member into its own ianguage and notified to the Centrai Secretariat has the same status as the official vers
11、ions. CENKENELEC members are the national standards bodies and national electrotechnical committees, respectively, of Austria, Belgium, Czech Republic, Denmark, Finland, France, Germanx Greece, Iceland, Ireland, Italy, Luxembourg, Netherlands, Norway, Portugal, Spain, Sweden, Switzerland and United
12、Kingdom. CEN Central Secretariat rue de Slmssart 36, B1050 Brussels CENELEC Central Secretariat rue de S- 35, EL1050 Brussels O 1998 CEN/CENELEC AU rights of exploitation in any form and by any means reserved worldwide for CEN national Members and for CENELEC Members. Ref. No. EN 45510-531998 E I ST
13、D-BSI BS EN 45510-5-3-ENGL 1778 1b24bb7 b78127 T7 D Page 2 EN 46610-531998 Foreword This standard talces the form of a recommendation and is therefore entitled a %u.iae! This gui - predicted pa$mnce is achieve - amlaqj equipment is properly sized; - reliability, availability and safety requirements
14、are achieve - proper considemtion is given to the euduution process and the qudity measures to be applied. This guide does not - any allocation of responsib2it.ieS which are determined by the contract. mis gui - gmb - geographic, e.g. elevatwn, iqtuence of local topography and structures; - hydrolog
15、ical, e.g. Jooding and tides. 4.3 Equipment task The specification should - noise; - direction of rotation; - performance; - power quality issues such as harmonic distortion, reactive power performance and transient current requirements. The specification may We should be to a recognized European or
16、 internutknal standard. 4.7 Other interfaces The specification should define the intmfiies with existing an.carg or new ancL?uw equipment to be supplied under sqmrate contracts which interact directly Urith, the equipment. For example civil works, cranage or temporary systems. 4.8 Project programme
17、The specification should describe the ovemll pgmmm and timescale in which the pject is to be Carried out. This may include the principal dutes associated with tenderng, placement of o? - power transformer, - reactive power compensating equipment; - supervisory control systems; - spare parts; - servi
18、ce and maintenance; - documentation; - operational responsibilisr; - site activities; - tests. O BSI 1998 STD-BSI BS EN 45520-5-3-ENGL 2978 m Lb24bb9 Ob98232 338 Page 7 EN 46510-5 - obligations, e.g. operational staff shi_ft patterns; - restrictions, e.g. process waste disposcnce or replucmt. This s
19、hould include the frequency of these operations. This scheduk should include estimates of maintenance man-hours and cost of components. The supplier should identify those maintenunce replaceement operations which require shut-down of the process more frequently than Ute plunned maintenunce shuhimrns
20、. 9 Performance requirements 9.1 Duty The specification should - safe shutdown; - safe emergency shutdown; - safe shutdown from overspeed or representative thereof; - function test of protection system. * 9.3 Equipment margins The specification should identify required equipment margins. 9.4 Availab
21、ility The specification may spedfy availabilitg requirements. In order to demonstrate corlformity with UzeSe requirements, the specification may request the supplier to use data on availability, reliability and maintainability to camy out an analysis to show that the target availability WU be met. D
22、etails for defining availability of the WTGS should be agreed between supplier and purchaser. 9.5 Levels of component redundancy The specification may define requirements fn- component redumncy. l%se requinmats may provide either additional operational security OT cover extrema of operating conditio
23、ns. The supplier should only use these additional plant components in meeting performance requirements in the Conditions define in the specification. If the specification does not specvy levels of component redumncy, thepurchaser may ash the supplier to ckrnonstmte Uzat the level of redundancy inclw
24、kd is cwkquate to meet the availability requirements. 9.6 Further performance requirements Not applicable to this guide. O BSI 1998 * vi * STD-BSI BS EN q551U-5-3-ENGL 1778 = Lb24bb7 Ob78L3q LOO Page 9 EN 4551-63:1998 10 Design and fabrication 10.1 Specific equipment features 10.1.1 Noise and vibrat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN45510531998ENGUIDEFORPROCUREMENTOFPOWERSTATIONEQUIPMENTPART53WINDTURBINES 发电站 设备 采购 指南 53 部分 风力 涡轮机

链接地址:http://www.mydoc123.com/p-716567.html