1、BRITISH STANDARDBS EN 14175-6:2006Fume cupboards Part 6: Variable air volume fume cupboardsICS 71.040.10; 91.140.30nullnull nullnullnullnullnullnullnull nullnullnullnullnullnullnull nullnullnull nullnullnullnullnullnullnullnullnullnull nullnullnullnullnullnull nullnull nullnullnullnullnullnullnullnu
2、llnull nullnull nullnullnullnullnullnullnullnullnull nullnullnullIncorporating corrigendum January 2014National forewordThis British Standard is the UK implementation of EN 14175-6:2006. Together with BS EN 14175-1:2003, BS EN 14175-2:2003, BS EN 14175-3:2003, BS EN 14175-4:2004 and DD CEN/TS 14175-
3、5:2006, BS EN 14175-7:2012, it supersedes BS 7258-1:1994, BS 7258-2:1994, BS 7258-3:1994 and BS 7258-4:1994 which are withdrawn.The UK committee advises that prior to purchasing a fume cupboard, a risk assessment should be performed to assess the risks associated with the substances that are to be m
4、anipulated. This would ensure that the fume cupboard is suitable for its intended purpose and that current exposure limits for toxic substances are not exceeded. It is suggested, therefore, that users may need to draw up a specification appropriate to their particular requirements, within the overal
5、l permissible limits of this standard and the information on installation included in the National Annex. For users with little experience of purchasing fume cupboards, it may be helpful for trade associations, employers bodies or other organizations associated with a particular activity to give gui
6、dance on a suitable specification. An example would be Building Bulletin 88 from the Architects A = cross sectional area of the duct8 AirflowrateFigure 2 Typical installationThe static pressure measurement shall be performed according to EN 12589:2001, Annex A.All partswhich are functional component
7、s of the typetested VAV system shall be installed and connected inaccordance with the manufacturers instructions. If the regulation of the VAV system is achieved by controlling fan speed, the damper may be replaced by thevariable flow fan. The test procedure shall be modified in appropriate way.5.3.
8、2.4 Measurements to be takenThe following parameters shall be measured during the tests:a) P S Downstream duct static gauge pressure b) P Flow meter pressure difference (or the appropriate parameter that relates to the air flow rate q v ) EN 14175-6:20069 5.3.2.5 Test procedure With the sash in the
9、required position or fullyopen followthe test procedure given in EN 12589:2001, 5.3.1.2.1to 5.3.1.2.4. The manufacturer shall specifythe maximum and minimum pressure difference to be used in the test. Repeat this testprocedurewith the VAV system under test turned 90 on axis A-A (see Figure 2). 5.3.2
10、.6 Calculation of results Calculation of the test results shall be done in accordance with EN 12589:2001, 5.5.1 and 5.5.2. The minimumlength w shall be stated in the type test report (see 9.1). 5.3.2.7Presentation of results Presentation of the test results shall be done in accordance with EN 12589:
11、2001, 5.6. 5.3.3 Tests for dynamic control behaviour5.3.3.1 Test equipmentIn addition to the test equipment according to 5.3.2.2 a time measurement system with a time constant lessthan t = 0,3 s shall be used.5.3.3.2 Test installationA typical test installation is shown in Figure 2. No additional re
12、sistance, e.g. damper or valve, except the flow rate measurement device shall be installed between the extract air fan downstream of the test installation shown in Figure 2 and the V AV system undertest. No additional automatic duct pressure control system shall be installed. The air flow system sha
13、ll be sized so that the change in static pressure P S is minimized. NOTEAn automatic duct pressure control system can influence the control characteristic of the VAV system undertest. 5.3.3.3 Measurements to be takenThe following parameters shall be measured during the tests:a) P S Downstream duct s
14、tatic gauge pressure b) P Flow meter pressure difference (or the appropriate parameter that relates to the air flow rate q v ) c) t Timed) SPositions of the sash 5.3.3.4 Test of response time 5.3.3.4.1 General The air flow rate of the VAV system being tested should be at the minimum setting when the
15、 sash position hasits minimum opening. At the fully open position of the sash, the air flow rate should be at the maximum setting of the VAV system under test. During the following test procedure the person performing the test shall stand to the side of the testbox while opening and closing the sash
16、. If the VAV system being tested is combined with an air flow rate or velocitymeasurement system, the following tests shall be repeated with the VAV system turned 90 on axis A-A (see Figure 2). EN 14175-6:200610 If the VAV system being tested requires factory calibration for its operation in terms o
17、f air flowdirection (horizontal or vertical), repeat the following tests with air flow straight up and down.5.3.3.4.2 Test at maximum pressure difference Close the sash of the test box to the minimum opening. Adjust the pressure P S (see Figure 2) to the maximum value P S1 in accordance with the man
18、ufacturers instructions. Wait until the value for the volume flow rate iswithin the allowable tolerance. No other parameter, e.g. variable damper positions or fan speed than the VAV system under test shall influence the volume flow rate or the pressure of the air flow system during the test procedur
19、e. Start the recording of the measurements.After about 30 s (t = 0) open the sash to the maximum opening position within (1 0,2) s.After t = 40 s close the sash to the minimum opening within (1 0,2) s.After t = 80 s stop the recording of the measurements.5.3.3.4.3 Test at minimum pressure difference
20、 Open the sash of the test box to its maximum opening. Adjust the pressure P S (see Figure 2) to the minimumvalue P S2 in accordance with the manufacturers instructions. Wait until the value for the volume flow rate iswithin the allowable tolerance. Close the sash to its minimum opening. No other pa
21、rameter, e.g. variable damper positions or fan speed than the VAV system under test shall influence the volume flow rate or the pressure of the air flow system during the test procedure. NOTE If necessary, a bypass with fixed opening(s) can be used to keep the change of the duct pressure low duringt
22、he test procedure.Start the recording of the measurements.After about 30 s (t = 0) open the sash to the maximum opening position within (1 0,2) s.After t = 40 s close the sash to the minimum opening within (1 0,2) s.After t = 80 s stop the recording of the measurements.5.3.3.5 Calculation of results
23、 The response time is the time taken from the start of the sash movement until the air flow rate reaches and maintains,within 10 %, the default air flow rate specified bythe manufacturer.5.3.3.6 Presentation of results The results of each test performed shall be presented graphically as shown in Fig
24、ure 3. The pressure valuesP S1 and P S2 and the response time up and down shallbe stated. EN 14175-6:200611 KeyASash position, set and actual value B Time scale in s C Response time up (example)D Sash fullyopen E Set=minimum FResponse time down (example)G Set=100 % H Actual value of air flow rateI S
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN1417562006ENFUMECUPBOARDSPART6VARIABLEAIRVOLUMEFUMECUPBOARDS 通风 部分 空气 变量 PDF

链接地址:http://www.mydoc123.com/p-708769.html