EN 13941-2009 en Design and installation of preinsulated bonded pipe systems for district heating (Incorporates Amendment A1 2010)《区域供暖用预绝热连接管的设计与安装 合并修改A1-2010》.pdf
《EN 13941-2009 en Design and installation of preinsulated bonded pipe systems for district heating (Incorporates Amendment A1 2010)《区域供暖用预绝热连接管的设计与安装 合并修改A1-2010》.pdf》由会员分享,可在线阅读,更多相关《EN 13941-2009 en Design and installation of preinsulated bonded pipe systems for district heating (Incorporates Amendment A1 2010)《区域供暖用预绝热连接管的设计与安装 合并修改A1-2010》.pdf(128页珍藏版)》请在麦多课文档分享上搜索。
1、BS EN 13941:2009ICS 91.140.10NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBRITISH STANDARDDesign and installationof preinsulated bondedpipe systems fordistrict heatingIncorporatingcorrigendumNovember 2009+A1:2010 National forewordThis British Standard is the UK implementatio
2、n of EN 13941:2009+A1:2010, incorporating corrigendum November 2009. It supersedes BS EN 13941:2009 which is withdrawn.The start and finish of text introduced or altered by amendment is indicated in the text by tags. Tags indicating changes to CEN text carry the number of the CEN amendment. For exam
3、ple, text altered by CEN amendment A1 is indicated by !“.The UK participation in its preparation was entrusted to Technical Committee RHE/9, Insulated underground pipelines.A list of organizations represented on this committee can be obtained on request to its secretary. This publication does not pu
4、rport to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legal obligations.BS EN 13941:2009+A1:2010This British Standard waspublished under the authorityof the Standards Policy andStr
5、ategy Committee on31 July 2009 BSI 2010Amendments/corrigenda issued since publicationDate Comments 31 January 2010 Implementation of CEN corrigendum November 2009; Inclusion of Annex E31 August 2010 Implementation of CEN amendment A1:2010ISBN 978 0 580 69522 3EUROPEAN STANDARD NORME EUROPENNE EUROPI
6、SCHE NORM EN 13941:2009+A1 July 2010 ICS 23.040.10; 91.140.10 Supersedes EN 13941:2009 English Version Design and installation of preinsulated bonded pipe systems for district heating Conception et installation des systmes bloqus de tuyaux prisols pour les rseaux enterrs deau chaude Auslegung und In
7、stallation von werkmig gedmmten Verbundmantelrohren fr die Fernwrme This European Standard was approved by CEN on 23 May 2009 and includes Corrigendum 1 issued by CEN on 11 November 2009 and Amendment 1 approved by CEN on 15 May 2010. CEN members are bound to comply with the CEN/CENELEC Internal Reg
8、ulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN Management Centre or to any CEN member. Thi
9、s European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN Management Centre has the same status as the official versions. CEN members are
10、the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden,
11、 Switzerland and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: Avenue Marnix 17, B-1000 Brussels 2010 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref
12、. No. EN 13941:2009+A1:2010: EEN 13941:2009+A1:2010 (E) 2 Contents Page Foreword . 5Introduction . 61 Scope 82 Normative references 83 Terms and definitions, units and symbols . 103.1 Terms and definitions . 103.2 Units and symbols 153.2.1 Units 153.2.2 Symbols 164 General considerations for system
13、design 184.1 General requirements . 184.2 Service life 184.3 Preliminary investigations 184.4 Determination of project class . 194.4.1 Risk assessment . 194.4.2 Project classes 204.5 Design documentation 224.5.1 General . 224.5.2 Operational data 224.5.3 Data related to the pipeline 224.5.4 Specific
14、ations for quality control 245 Components and materials 255.1 Basic requirements . 255.1.1 !General“ 255.1.2 !Non standardised components“ . 255.2 Steel pipe components . 255.2.1 General . 255.2.2 Technical delivery conditions and documentation . 265.2.3 Characteristic values for steel . 265.2.4 Spe
15、cific requirements for bends and tees 275.2.5 Specific requirements for reducers and extensions . 285.2.6 Specific requirements for other components 285.3 Polyurethane foam insulation 285.4 PE casing . 295.5 Expansion cushions . 295.6 Valves and accessories 295.6.1 General requirements . 295.6.2 Mar
16、king and documentation 296 Actions and limit states 306.1 General . 306.2 Simplified analysis procedure . 326.3 Actions . 326.3.1 General . 326.3.2 Classification of actions . 326.4 Limit states. 346.4.1 General . 346.4.2 Limit states for service pipes of steel . 346.4.3 Composite stress conditions
17、. 42BS EN 13941:2009+A1:2010EN 13941:2009+A1:2010 (E) 3 6.4.4 Limit states for PUR and PE . 436.4.5 Limit state for PE . 436.4.6 Limit states for valves 447 Installation . 447.1 General . 447.2 Transportation and storage . 457.3 Excavation of pipe trench 457.4 Installation of pipes and components. 4
18、57.4.1 General . 457.4.2 Steel pipes . 467.4.3 PUR-PE Joints . 467.4.4 Accessories . 467.4.5 Expansion zones . 467.5 Welding of the steel pipe and testing of the steel welds 467.5.1 General . 467.5.2 Quality system for the different project classes 477.5.3 Qualification of the welding procedures 497
19、.5.4 Welding consumables 497.5.5 Place and position of the weld . 497.5.6 Performance of welding work 497.5.7 Special procedures . 527.5.8 Documentation 547.6 Strength pressure test and leak tightness test 547.7 Assembly of casing pipes, joint installation and site insulation . 557.8 Backfilling of
20、trench 557.9 Pipe bends and other components . 567.9.1 Pipe bends . 567.9.2 Branches 567.9.3 Valves and accessories 577.10 Setting into operation . 577.10.1 General . 577.10.2 Filling with water for initial operation . 577.10.3 Surveillance system 577.11 Special constructions . 587.11.1 Special comp
21、onents . 587.11.2 Above-ground pipelines with preinsulated pipes 587.11.3 Insertion into casing pipe . 587.12 Construction work during the operation stage 58Annex A (normative) Design of piping components under internal pressure . 60A.1 General . 60A.2 Symbols . 60A.3 Straight pipe and bends . 61A.4
22、 Tees and branch connections . 61A.5 Reducers and extensions . 64A.6 Dished ends . 65Annex B (informative) Geotechnics and pipe-soil interaction . 67B.1 Scope 67B.2 Symbols and units 67B.3 Soil parameters for global analysis (pipe-soil interaction) . 68B.4 Characteristic values for soil loads and so
23、il parameters . 78B.5 Specific requirements for stability 79B.6 Specific requirements for parallel excavations . 82B.7 Requirements for soft soils and settlement areas . 82B.8 Ovalization and circumferential stresses from top load . 82Annex C (informative) Global- and cross sectional analysis . 89C.
24、1 General . 89C.2 Symbols . 89BS EN 13941:2009+A1:2010EN 13941:2009+A1:2010 (E) 4 C.3 Survey of limit states for steel . 91C.4 Locations to be assessed . 92C.5 Actions . 95C.6 Global analysis 96C.7 Calculation of stresses . 103C.8 Fatigue analysis 119C.9 Further actions 120Annex D (informative) Calc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN139412009ENDESIGNANDINSTALLATIONOFPREINSULATEDBONDEDPIPESYSTEMSFORDISTRICTHEATINGINCORPORATESAMENDMENTA12010

链接地址:http://www.mydoc123.com/p-708510.html