《EEMUA PUB NO 138 S1-1993 Design and Installation of On-Line Analyser Systems - A Guide to Technical Enquiry and Bid Evaluation《在线分析系统设计和安装 技术咨询和评标指南》.pdf》由会员分享,可在线阅读,更多相关《EEMUA PUB NO 138 S1-1993 Design and Installation of On-Line Analyser Systems - A Guide to Technical Enquiry and Bid Evaluation《在线分析系统设计和安装 技术咨询和评标指南》.pdf(29页珍藏版)》请在麦多课文档分享上搜索。
1、THE ENGINEERING EQUIPMENT AND MATERIALS USERS ASSOCIATION DESIGN AND INSTALLATION OF ON-LINE ANALYSER SYSTEMS A GUIDE TO TECHNICAL ENQUIRY AND BID EVALUATION PUBLICATION No. 138 Sl : 1993 I EEMUAI COPYRIGHT Engineering Equipment and Materials Users AssociationLicensed by Information Handling Service
2、sTHE ENGINEERING EQUIPMENT AND MATERIALS USERS ASSOCIATION DESIGN AND INSTALLATION OF ON-LINE ANALYSER SYSTEMS A GUIDE TO TECHNICAL ENQUIRY AND BID EVALUATION PUBLICATION No138 S1 1993 Copyright (o 1993 The Engineering Equipment and Materials Users Association ISBN O 85931 070 1 1 45 Beech Street Lo
3、ndon EC2Y 8AD tel 0207 628 7878 fax 0207 628 7862 e-mail saleseemua.co.uk website www.eernua.co.uk I EEMUAI COPYRIGHT Engineering Equipment and Materials Users AssociationLicensed by Information Handling ServicesTHE ENGINEERING EQUIPMENT AND MATERIALS USERS ASSOCIATION The Engineering Equipment and
4、Materials Users Association-EEMUA-was formed in 1983 by the Amalgamation of the Oil Companies Materiais Association (OCMA) and the Engineering Equipment Users Association EUA). It is an organisation of substantial purchasers and users=of engineering products, whose members include leading national a
5、nd rnulti-national companies in the petroleum, gas; chemical and energy industries. A list of Full and Associate Members (the latter being limited to membership of three technical committees) is given below. EEMUA is concerned with the design, installation, operation and maintenance of the engineeri
6、ng plant used by members in pursuing their business activities. The Association aims to reduce members costs by providing the opportunity for them to share resources and expertise in order to keep abreast of technological developments and improve the effectiveness and efficiency of their engineering
7、 activities. EEMUA supports the British Standards Institution, works with other institutions, associations, government departments. regulatory authorities and the Confederation of British Industry, and is also actively involved with other standards-making bodies, both aationai and international, suc
8、h as the American Petroleum Institute. Work, which is carried out in-house by members alone or with the help of other organisations, may lead to the production of Association publications. These are prepared primarily for members use, but are usually offered for sale and thus for more general use. S
9、uch publications may also be submitted, normally through the British Standards Institution, as bases for appropriate national, European or internaei01 standards. A list of current EEMUA Publications which may be purchased from the Association is given at the end of this document. Fu11 Members Associ
10、ate Members Associated Octel AsraZeneca BG BASF BP Amoc0 D . : . II. . _. _,: A site survey should be carried out to identify the preferred location and any constraints limiting height, width and length, orientation and layout of external equipment should be determined and quoted to the vendor as ma
11、ximum dimensions he can work to. If constraints result in roof mounted equipment being an option then the enquiry should request means of access. For safety and to reuce load on house ventilation requirements it is preferable to limit equipment inside the house to the bare minimum. Sample handling c
12、abinets, electrical switch gear and junction boxes should be dtside the house mounted oii the walls. Construction Materials (steel, GRP, etc.), type of construction (singie skin, double skin, etc.) and idation requirements should be clearly given. The method of lifting prefabricate houses should be
13、considered and the preference clearly given i.e. top lift or bottom lift. Bottom lift requires less structural streng& in the house walls but requires spreader arms which could give height access problems when installing on site. Roof venting to encourage dissipation of gases and floor drainage to r
14、emove spillages and facilitak washing down should be clearly specified. It should not be assumed that the systems vendor will automaticaily provide such facility. The specification should alert the systems vendor to the possibility of restrictions in transport and place upon the vendor the responsib
15、ility of ensuring his design can be transported with the minimum of effort i.e. provision of suitable junction boxes or manifolds if equipment n& to be removed etc. Painting is an important aspect and site requirements and practices for colour and surface preparation should be clearly defined. Any d
16、amage to paint work in transit to site and installation should be made good and be the responsibility of the systems vendor. Ventilation The type of ventilation, forced or naura, should be stated. The main object of the ventilation is to ensure safe dispersion of any hazardous materials released ins
17、ide the house. The secondary objective is to provide suitable working conditions for both the analysers and the maintenance personnel. Ventilation rates should be based around these criteria and sizing methods are given in EEMUA Publication No. 138 section 3.6. Care should be taken in choice of fan
18、systems. It is important to specify requirements for suitable electrical certification of fan motors and specify anti- static provisions for fan blades and fan belts (if used). Fan motors mounted inside the ducting should always be suitable for Zone 1 hazardous areas. 8 COPYRIGHT Engineering Equipme
19、nt and Materials Users AssociationLicensed by Information Handling ServicesSTD EEMUA 758 m The source of the ventilation air shall be specified as this will reflect on safety requirements for the house. 2.6.4 Air Conditioning Air conditioning can take the form of heating only, heating and cooling, o
20、r cooling only. The choice specified depends on geographical location. If electric heaters are chosen due note shall %e taken of hazardous area classification and care should be taken in ensuring over-temperatures in the heater cannot occur on ventilation failure. 2.6.5 Power Distribution Power dist
21、ribution depends on site services available. However it may be simpler and cheaper to specify the systems vendor to provide the power distribution and voltage transformations and run in three phase power from the site supply. Typically 400/440 volts 50 hertz. three phase supply. Power distribution s
22、hould be agreed early on in the project, especially where hazardous areas are concerned, as it is now common practice to have packaged systems covered by a system certification for hazardous area applications. It can be difficult and cause significant delays in the delivery if modifications are requ
23、ired when well into the project. It is advisable to specify spare power distribution points. Emergency facilities need to be considered and carefully specified. Earthing requirements should be detailed in the specification. Cabling requirements should also be detailed in the specification. Cable sup
24、port and protection is important. The type of cable ties that are acceptable should be stated. Use of plastic ties and “stick-on“ cable supports should be avoided as these deteriorate over a few years. 2.6.6 Safety Systems Safety systems are provided for the protection of the analyser house and pers
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EEMUAPUBNO138S11993DESIGNANDINSTALLATIONOFONLINEANALYSERSYSTEMSAGUIDETOTECHNICALENQUIRYANDBIDEVALUATION

链接地址:http://www.mydoc123.com/p-704934.html