DOT 49 CFR PART 214-2010 RAILROAD WORKPLACE SAFETY.pdf
《DOT 49 CFR PART 214-2010 RAILROAD WORKPLACE SAFETY.pdf》由会员分享,可在线阅读,更多相关《DOT 49 CFR PART 214-2010 RAILROAD WORKPLACE SAFETY.pdf(30页珍藏版)》请在麦多课文档分享上搜索。
1、152 49 CFR Ch. II (10110 Edition) Pt. 214 Section Violation Willful Viola-tion1213.323 Track gage 5,000 7,500 213.327 Alinement 5,000 7,500 213.329 Curves, elevation and speed limits 2,500 5,000 213.331 Track surface 5,000 7,500 213.333 Automated vehicle inspection systems 5,000 7,500 213.335 Crosst
2、ies (a) Material used 1,000 2,000 (b) Distribution of ties . 2,500 5,000 (c) Sufficient number of nondefective ties, non-concrete 1,000 2,000 (d) Sufficient number of nondefective concrete ties 1,000 2,000 (e) Joint ties 2,500 5,000 (f) Track constructed without crossties 2,500 5,000 (g) Non-defecti
3、ve ties surrounding defective ties . 2,500 5,000 (h) Tie plates 2,500 5,000 (i) Tie plates 1,000 2,000 213.337 Defective rails . 5,000 7,500 213.339 Inspection of rail in service . 2,500 5,000 213.341 Inspection of new rail 2,500 5,000 213.343 Continuous welded rail (a) through (h) . 5,000 7,500 213
4、.345 Vehicle qualification testing (a) through (b) 5,000 7,500 (c) through (e) . 2,500 5,000 213.347 Automotive or railroad crossings at grade . 5,000 7,500 213.349 Rail end mismatch 2,500 5,000 213.351 (a) Rail joints . 2,500 5,000 213.351 (b) Rail joints . 2,500 5,000 213.351 (c) Rail joints . 5,0
5、00 7,500 213.351 (d) Rail joints . 2,500 5,000 213.351 (e) Rail joints . 2,500 5,000 213.351 (f) Rail joints 5,000 7,500 213.351 (g) Rail joints . 5,000 7,500 213. 352 Torch cut rails 2,500 5,000 213.353 Turnouts, crossovers, transition devices 1,000 2,000 213.355 Frog guard rails and guard faces; g
6、age . 2,500 5,000 213.357 Derails . 2,500 5,000 213.359 Track stiffness . 5,000 7,500 213.361 Right of way 5,000 7,500 213.365 Visual inspections . 2,500 5,000 213.367 Special inspections . 2,500 5,000 213.369 Inspections records . 2,000 4,000 1A penalty may be assessed against an individual only fo
7、r a willful violation. The Administrator reserves the right to assess a penalty of up to $100,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. 2In addition to assessment of penalties for each instance of noncompliance with the requirements identified by this footno
8、te, track segments designated as excepted track that are or become ineligible for such designation by virtue of noncompliance with any of the requirements to which this footnote applies are subject to all other requirements of Part 213 until such noncompliance is remedied. 63 FR 34029, June 22, 1998
9、; 63 FR 45959, Aug. 28, 1998, as amended at 70 FR 66299, Nov. 2, 2005; 73 FR 79701, Dec. 30, 2008; 74 FR 43006, Aug. 25, 2009 PART 214RAILROAD WORKPLACE SAFETY Subpart AGeneral Sec. 214.1 Purpose and scope. 214.3 Application. 214.4 Preemptive effect. 214.5 Responsibility for compliance. 214.7 Defini
10、tions. Subpart BBridge Worker Safety Standards 214.101 Purpose and scope. 214.103 Fall protection, generally. 214.105 Fall protection systems standards and practices. 214.107 Working over or adjacent to water. 214.109 Scaffolding. 214.111 Personal protective equipment, gen-erally. 214.113 Head prote
11、ction. 214.115 Foot protection. 214.117 Eye and face protection. Subpart CRoadway Worker Protection 214.301 Purpose and scope. 214.302 Information collection require-ments. 214.303 Railroad on-track safety programs, generally. 214.305 Compliance dates. 214.307 Review and approval of individual on-tr
12、ack safety programs by FRA. 214.309 On-track safety program documents. 214.311 Responsibility of employers. VerDate Mar2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 00162 Fmt 8010 Sfmt 8010 Y:SGML220215.XXX 220215jdjones on DSK8KYBLC1PROD with CFRProvided by IHSNot for ResaleNo reproduction or net
13、working permitted without license from IHS-,-,-153 Federal Railroad Administration, DOT 214.4 214.313 Responsibility of individual roadway workers. 214.315 Supervision and communication. 214.317 On-track safety procedures, gen-erally. 214.319 Working limits, generally. 214.321 Exclusive track occupa
14、ncy. 214.323 Foul time. 214.325 Train coordination. 214.327 Inaccessible track. 214.329 Train approach warning provided by watchmen/lookouts. 214.331 Definite train location. 214.333 Informational line-ups of trains. 214.335 On-track safety procedures for road-way work groups. 214.337 On-track safet
15、y procedures for lone workers. 214.339 Audible warning from trains. 214.341 Roadway maintenance machines. 214.343 Training and qualification, general. 214.345 Training for all roadway workers. 214.347 Training and qualification for lone workers. 214.349 Training and qualification of watch-men/lookou
16、ts. 214.351 Training and qualification of flagmen. 214.353 Training and qualification of road-way workers who provide on-track safety for roadway work groups. 214.355 Training and qualification in on- track safety for operators of roadway maintenance machines. Subpart DOn-Track Roadway Mainte-nance
17、Machines and Hi-Rail Vehicles 214.501 Purpose and scope. 214.503 Good-faith challenges; procedures for notification and resolution. 214.505 Required environmental control and protection systems for new on-track roadway maintenance machines with en-closed cabs. 214.507 Required safety equipment for n
18、ew on-track roadway maintenance ma-chines. 214.509 Required visual illumination and re-flective devices for new on-track road-way maintenance machines. 214.511 Required audible warning devices for new on-track roadway maintenance ma-chines. 214.513 Retrofitting of existing on-track roadway maintenan
19、ce machines; general. 214.515 Overhead covers for existing on- track roadway maintenance machines. 214.517 Retrofitting of existing on-track roadway maintenance machines manu-factured on or after January 1, 1991. 214.518 Safe and secure positions for riders. 214.519 Floors, decks, stairs, and ladder
20、s of on-track roadway maintenance ma-chines. 214.521 Flagging equipment for on-track roadway maintenance machines and hi- rail vehicles. 214.523 Hi-rail vehicles. 214.525 Towing with on-track roadway maintenance machines or hi-rail vehi-cles. 214.527 On-track roadway maintenance ma-chines; inspectio
21、n for compliance and schedule for repairs. 214.529 In-service failure of primary braking system. 214.531 Schedule of repairs; general. 214.533 Schedule of repairs subject to avail-ability of parts. APPENDIX A TO PART 214SCHEDULE OF CIVIL PENALTIES AUTHORITY: 49 U.S.C. 20103, 20107, 21301, 21304; 28
22、U.S.C. 2461, note; and 49 CFR 1.49. SOURCE: 57 FR 28127, June 24, 1992, unless otherwise noted. Subpart AGeneral 214.1 Purpose and scope. (a) The purpose of this part is to pre-vent accidents and casualties to em-ployees involved in certain railroad in-spection, maintenance and construc-tion activit
23、ies. (b) This part prescribes minimum Federal safety standards for the rail-road workplace safety subjects ad-dressed herein. This part does not re-strict a railroad or railroad contractor from adopting and enforcing additional or more stringent requirements not in-consistent with this part. 214.3 A
24、pplication. This part applies to railroads that operate rolling equipment on track that is part of the general railroad sys-tem of transportation. 214.4 Preemptive effect. Under 49 U.S.C. 20106 (formerly sec-tion 205 of the Federal Railroad Safety Act of 1970 (45 U.S.C. 434), issuance of the regulat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT49CFRPART2142010RAILROADWORKPLACESAFETYPDF

链接地址:http://www.mydoc123.com/p-702072.html