DOT 49 CFR PART 1141-2010 PROCEDURES TO CALCULATE INTEREST RATES.pdf
《DOT 49 CFR PART 1141-2010 PROCEDURES TO CALCULATE INTEREST RATES.pdf》由会员分享,可在线阅读,更多相关《DOT 49 CFR PART 1141-2010 PROCEDURES TO CALCULATE INTEREST RATES.pdf(1页珍藏版)》请在麦多课文档分享上搜索。
1、181 Surface Transportation Board, DOT Pt. 1144 regard will receive the full support and guid-ance of the Boards staff so that the best pos-sible results may be achieved in the shortest possible time. H. G. HOMME,Secretary. 42 FR 32541, June 27, 1977. Redesignated at 47 FR 49571, Nov. 1, 1982 and ame
2、nded at 64 FR 53268, Oct. 1, 1999 PART 1141PROCEDURES TO CALCULATE INTEREST RATES AUTHORITY: 49 U.S.C. 721. 1141.1 Procedures to calculate inter-est rates. (a) For purposes of complying with a Board decision in a complaint or inves-tigation proceeding, interest rates to be computed shall be the coup
3、on equiv-alent yield (investment rate) of mar-ketable securities of the United States Government having a duration of 91 days (3 months). The rate levels will be determined as follows: (1) For investigation proceedings, the interest rate shall be the coupon equiv-alent yield in effect on the date th
4、e statement is filed accounting for all amounts received under the new rates (See 49 U.S.C. 10707(d)(1). (2) For complaint proceedings, the in-terest rate shall be the coupon equiva-lent yield in effect on the first day of the calendar quarter in which an un-lawful charge is paid. The interest rate
5、in complaint proceedings shall be up-dated as of the first day of all subse-quent calendar quarters, at the coupon equivalent yields in effect on those days. Updating will continue until the required reparation payments are made. (3) For purposes of this section, cou-pon equivalent yields shall be c
6、onsid-ered in effect on the date the securi-ties are issued, not on the date they are auctioned. If the date the state-ment is filed (for investigation pro-ceedings) or if the first day of the cal-endar quarter (for complaint pro-ceedings) is the same as the issue date, then the yield on that date s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT49CFRPART11412010PROCEDURESTOCALCULATEINTERESTRATESPDF

链接地址:http://www.mydoc123.com/p-701988.html