DOT 23 CFR PART 950-2011 ELECTRONIC TOLL COLLECTION.pdf
《DOT 23 CFR PART 950-2011 ELECTRONIC TOLL COLLECTION.pdf》由会员分享,可在线阅读,更多相关《DOT 23 CFR PART 950-2011 ELECTRONIC TOLL COLLECTION.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、473 Federal Highway Administration, DOT 950.3 (1) Identification of portions of the regional ITS architecture being imple-mented (or if a regional ITS architec-ture does not exist, the applicable por-tions of the National ITS Architec-ture); (2) Identification of participating agencies roles and res
2、ponsibilities; (3) Requirements definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5) Procurement options; (6) Identification of applicable ITS standards and testing procedures; and (7) Procedures and resources nec-essary for operations and m
3、anagement of the system. (d) Upon completion of the regional ITS architecture required in 940.9(b) or 940.9(c), the final design of all ITS projects funded with highway trust funds shall accommodate the interface requirements and information ex-changes as specified in the regional ITS architecture.
4、If the final design of the ITS project is inconsistent with the regional ITS architecture, then the re-gional ITS architecture shall be up-dated as provided in the process defined in 940.9(f) to reflect the changes. (e) Prior to the completion of the re-gional ITS architecture, any major ITS project
5、 funded with highway trust funds that advances to final design shall have a project level ITS architec-ture that is coordinated with the devel-opment of the regional ITS architec-ture. The final design of the major ITS project shall accommodate the inter-face requirements and information ex-changes
6、as specified in this project level ITS architecture. If the project final design is inconsistent with the project level ITS architecture, then the project level ITS architecture shall be updated to reflect the changes. The project level ITS architecture is based on the results of the systems enginee
7、r-ing analysis, and includes the fol-lowing: (1) A description of the scope of the ITS project; (2) An operational concept that iden-tifies the roles and responsibilities of participating agencies and stake-holders in the operation and implemen-tation of the ITS project; (3) Functional requirements
8、of the ITS project; (4) Interface requirements and infor-mation exchanges between the ITS project and other planned and existing systems and subsystems; and (5) Identification of applicable ITS standards. (f) All ITS projects funded with high-way trust funds shall use applicable ITS standards and in
9、teroperability tests that have been officially adopted through rulemaking by the DOT. (g) Any ITS project that has ad-vanced to final design by April 8, 2001 is exempt from the requirements of para-graphs (d) through (f) of this section. 66 FR 1453, Jan. 8, 2001, as amended at 66 FR 19856, Apr. 18,
10、2001 940.13 Project administration. (a) Prior to authorization of highway trust funds for construction or imple-mentation of ITS projects, compliance with 940.11 shall be demonstrated. (b) Compliance with this part will be monitored under Federal-aid oversight procedures as provided under 23 U.S.C.
11、106 and 133. PART 950ELECTRONIC TOLL COLLECTION Sec. 950.1 Purpose. 950.3 Definitions. 950.5 Requirement to use electronic toll col-lection technology. 950.7 Interoperability requirements. 950.9 Enforcement. AUTHORITY: 23 U.S.C. 109, 315; sec. 1604(b)(5) and (b)(6), Pub. L. 10959, 119 Stat. 1144; 49
12、 CFR 1.48. SOURCE: 74 FR 51771, Oct. 8, 2009, unless otherwise noted. 950.1 Purpose. The purpose of this part is to estab-lish interoperability requirements for toll facilities that are tolled under sec-tion 1604 of the Safe, Accountable, Flexible, Efficient Transportation Eq-uity Act: A Legacy for
13、Users (SAFETEALU) (Pub. L. 10959; 119 Stat. 1144) that use electronic toll col-lection. 950.3 Definitions. As used in this part: VerDate Mar2010 09:39 May 11, 2011 Jkt 223076 PO 00000 Frm 00483 Fmt 8010 Sfmt 8010 Y:SGML223076.XXX 223076wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleN
14、o reproduction or networking permitted without license from IHS-,-,-474 23 CFR Ch. I (4111 Edition) 950.5 1604 toll program refers to any of the tolling programs authorized under sec-tion 1604 of SAFETEALU. These pro-grams include the Value Pricing Pilot Program, the Express Lanes Dem-onstration Pro
15、gram, and the Interstate System Construction Toll Pilot Pro-gram. Electronic toll collection means the ability for vehicle operators to pay tolls automatically without slowing down from normal highway speeds. Toll agency means the relevant public or private entity or entities to which toll authority
16、 has been granted for a facility under a 1604 toll program. 950.5 Requirement to use electronic toll collection technology. (a) Any toll agency operating a toll facility pursuant to authority under a 1604 toll program shall use an elec-tronic toll collection system as the method for collecting tolls
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT23CFRPART9502011ELECTRONICTOLLCOLLECTIONPDF

链接地址:http://www.mydoc123.com/p-701934.html