DOT 23 CFR PART 772-2011 PROCEDURES FOR ABATEMENT OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE.pdf
《DOT 23 CFR PART 772-2011 PROCEDURES FOR ABATEMENT OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE.pdf》由会员分享,可在线阅读,更多相关《DOT 23 CFR PART 772-2011 PROCEDURES FOR ABATEMENT OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、429 Federal Highway Administration, DOT 772.1 6The FHWA published a detailed discussion of US DOTs interpretation of 23 U.S.C. 139(l), together with information applicable to FHWA projects about implementation proce-dures for 23 U.S.C. 139(l), in appendix E to the SAFETEA-LU Environmental Review Pro
2、c-ess: Final Guidance, dated November 15, 2006. The implementation procedures in ap-pendix E apply only to FHWA projects. The section 6002 guidance, including appendix E, is available at http:/www.fhwa.dot.gov/, or in hard copy by request. FONSI is prepared, the final EIS or FONSI should reflect con
3、sultation with the appropriate agencies and provide reasonable assurance that the require-ments will be met. Approval of the en-vironmental document constitutes adoption of any Administration find-ings and determinations that are con-tained therein. The Administrations approval of an environmental d
4、ocu-ment constitutes its finding of compli-ance with the report requirements of 23 U.S.C. 128. 52 FR 32660, Aug. 28, 1987, as amended at 74 FR 12530, Mar. 24, 2009 771.137 International actions. (a) The requirements of this part apply to: (1) Administration actions signifi-cantly affecting the envir
5、onment of a foreign nation not participating in the action or not otherwise involved in the action. (2) Administration actions outside the U.S., its territories, and posses-sions which significantly affect natural resources of global importance des-ignated for protection by the President or by inter
6、national agreement. (b) If communication with a foreign government concerning environmental studies or documentation is antici-pated, the Administration shall coordi-nate such communication with the De-partment of State through the Office of the Secretary of Transportation. 771.139 Limitations on ac
7、tions. Notices announcing decisions by the Administration or by other Federal agencies on a transportation project may be published in the FEDERAL REG-ISTER indicating that such decisions are final within the meaning of 23 U.S.C. 139(l). Claims arising under Fed-eral law seeking judicial review of a
8、ny such decisions are barred unless filed within 180 days after publication of the notice. This 180-day time period does not lengthen any shorter time period for seeking judicial review that other-wise is established by the Federal law under which judicial review is allowed.6This provision does not
9、create any right of judicial review or place any limit on filing a claim that a person has violated the terms of a permit, li-cense, or approval. 74 FR 12530, Mar. 24, 2009 PART 772PROCEDURES FOR ABATEMENT OF HIGHWAY TRAF-FIC NOISE AND CONSTRUCTION NOISE Sec. 772.1 Purpose. 772.3 Noise standards. 77
10、2.5 Definitions. 772.7 Applicability. 772.9 Analysis of traffic noise impacts and abatement measures. 772.11 Noise abatement. 772.13 Federal participation. 772.15 Information for local officials. 772.17 Traffic noise prediction. 772.19 Construction noise. TABLE 1 TO PART 772NOISE ABATEMENT CRI-TERIA
11、 APPENDIX A TO PART 772NATIONAL REF-ERENCE ENERGY MEAN EMISSION LEVELS AS A FUNCTION OF SPEED AUTHORITY: 23 U.S.C. 109(h), 109(i); 42 U.S.C. 4331, 4332; sec. 339(b), Pub. L. 10459, 109 Stat. 568, 605; 49 CFR 1.48(b). SOURCE: 47 FR 29654, July 8, 1982; 47 FR 33956, Aug. 5, 1982, unless otherwise note
12、d. EFFECTIVE DATE NOTE: At 75 FR 39834, July 13, 2010, part 772 was revised, effective July 13, 2011. For the convenience of the user, the revised text is set forth following the text currently in effect. 772.1 Purpose. To provide procedures for noise stud-ies and noise abatement measures to help pr
13、otect the public health and wel-fare, to supply noise abatement cri-teria, and to establish requirements for information to be given to local offi-cials for use in the planning and design of highways approved pursuant to title 23 U.S.C. VerDate Mar2010 09:39 May 11, 2011 Jkt 223076 PO 00000 Frm 0043
14、9 Fmt 8010 Sfmt 8010 Y:SGML223076.XXX 223076wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS430 23 CFR Ch. I (4111 Edition) 772.3 772.3 Noise standards. The highway traffic noise prediction requirements, noise analyses, n
15、oise abatement criteria, and requirements for informing local officials in this reg-ulation constitute the noise standards mandated by 23 U.S.C. 109(i). All high-way projects which are developed in conformance with this regulation shall be deemed to be in conformance with the Federal Highway Adminis
16、tration (FHWA) noise standards. 772.5 Definitions. (a) Design year. The future year used to estimate the probable traffic volume for which a highway is designed. A time, 10 to 20 years, from the start of construction is usually used. (b) Existing noise levels. The noise, re-sulting from the natural
17、and mechan-ical sources and human activity, con-sidered to be usually present in a par-ticular area. (c) L10. The sound level that is ex-ceeded 10 percent of the time (the 90th percentile) for the period under consid-eration. (d) L10(h). The hourly value of L10. (e) Leqthe equivalent steady-state so
18、und level which in a stated period of time contains the same acoustic en-ergy as the time-varying sound level during the same time period. (f) Leq(h). The hourly value of Leq. (g) Traffic noise impacts. Impacts which occur when the predicted traffic noise levels approach or exceed the noise abatemen
19、t criteria (Table 1), or when the predicted traffic noise levels substantially exceed the existing noise levels. (h) Type I projects. A proposed Federal or Federal-aid highway project for the construction of a highway on new loca-tion or the physical alteration of an ex-isting highway which signific
20、antly changes either the horizonal or vertical alignment or increases the number of through-traffic lanes. (i) Type II projects. A proposed Fed-eral or Federal-aid highway project for noise abatement on an existing high-way. 772.7 Applicability. (a) Type I projects. This regulation ap-plies to all T
21、ype I projects unless it is specifically indicated that a section ap-plies only to Type II projects. (b) Type II projects. The development and implementation of Type II projects are not mandatory requirements of 23 U.S.C. 109(i) and are, therefore, not re-quired by this regulation. When Type II proj
22、ects are proposed for Federal-aid highway participation at the option of the highway agency, the provisions of 772.9(c), 772.13, and 772.19 of this regu-lation shall apply. 772.9 Analysis of traffic noise im-pacts and abatement measures. (a) The highway agency shall deter-mine and analyze expected t
23、raffic noise impacts and alternative noise abate-ment measures to mitigate these im-pacts, giving weight to the benefits and cost of abatement, and to the overall social, economic and environmental ef-fects. (b) The traffic noise analysis shall in-clude the following for each alternative under detai
24、led study: (1) Identification of existing activi-ties, developed lands, and undeveloped lands for which development is planned, designed and programmed, which may be affected by noise from the highway; (2) Prediction of traffic noise levels; (3) Determination of existing noise levels; (4) Determinat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT23CFRPART7722011PROCEDURESFORABATEMENTOFHIGHWAYTRAFFICNOISEANDCONSTRUCTIONNOISEPDF

链接地址:http://www.mydoc123.com/p-701927.html