DOD MIL-G-89103-1994 GRIDDED INSTALLATION PHOTOGRAPH (GIP)《网格照相设备(GIP)》.pdf
《DOD MIL-G-89103-1994 GRIDDED INSTALLATION PHOTOGRAPH (GIP)《网格照相设备(GIP)》.pdf》由会员分享,可在线阅读,更多相关《DOD MIL-G-89103-1994 GRIDDED INSTALLATION PHOTOGRAPH (GIP)《网格照相设备(GIP)》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-G-89L03 m 9999906 1977456 963 m Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Director I Defense Mapping Agency, ATTN: PR, ST A-13, 8613 Lee Standardization Document Improvement Proposal (
2、DD Form 11426) appearing at the end of this document or by letter. Highway, Fairfax, VA, 22031-2137 by Using the I METRICI - MIL-0-89103 MILITARY SPECIFICATION GRIDDED INSTALLATION PHOTOGRAPHS (GIP) This specification is approved for use by all Departments and Agencies of the Department of Defense.
3、1. SCOPE 1.1 ScoDe. These specifications are for use by all Department of Defense activities which have authorization to validate Mapping, Charting and Geodesy requirements and submit production requests. 1.2 Eyrose. These specifications are designed to provide guidelines for the preparation, acquis
4、ition, handling, and destruction of hardcopy Gridded Installation Photographs. 1.3 Securitv . These specifications are UNCLASSIFIED. Products generated from these specifications may be classified as high as “SECRET“. Destruction notice for unclassified, distribution limited documents is: contents or
5、 reconstruction of this document.“ “Destroy by any method that will prevent disclosure of 2. APPLICABLE DOCUMENTS AMSC N/A AREA MCGT DISTRIBUTION STATRM ENT A. Not approved for public release; distribution is limited. Licensed by Information Handling ServicesMIL-G-89103 3. REQUIREMENTS 3.1 First art
6、icle . When specified (see 6.2), a sample shall be subjected to first article inspection (see 6.3) in accordance with 4.3. 3.2 General. This product has been designed to support highly localized ground, sea, and air operations where terrain and other features must be compensated for in order to perf
7、orm the specialized mission objective. The GIP is not designed as a Target Materials product. 3.3 Accu racv. 3.3.1 Jlor izontal . Will be stated for each GIP based upon the value derived for the site reference point (RP). Accuracies will be stated in circular error (CE) (90 percent assurance). 3.3.2
8、 yert ical. Will be stated for each GIP and based upon the ground elevation at the RP. site name, country code, coordinates, stock number, and BE number, if available. 3.4 product identifier. Each GIP will be identified by 3.5 product att r ibu t es. 3.5.1 product ion. The GIP will be produced by or
9、thorectification of the most recent image based source materials available to DMA. 3.5.2 $ou rce mate rial date . Source materials older than three years will not be used. three years to insure currency. updates identified by originating commands will require submission via JCS Memorandum of Policy
10、(MOP) 31, Submitting and assigning priorities to Requirements for Mapping, Charting, and Geodesy (MC horizontal axis, numerics increasing left to right. Linear distance values in meters, see Appendix A, Style Sheet. 3.5.6 Color. 3.5.6.1 Granhic face . Black; background. White; grid, letters, icons,
11、numbers and labeling. 3.5.6.2 mraia. White background. Black; text and symbols. a. 3.6 Wain alphabetical by site name and numerical by BE number. b. Upon migration of the inventory listings to a standard DMA catalog (TBD), the GP Listing will cease, and all recipients of DMA catalogs who have reques
12、ted that publication 4 Licensed by Information Handling ServicesMIL-G-89103 - 9999906 1977460 394 MIL-G-89103 containing Gridded Photos will have the current inventory. 4. QUALITY ASSURANCE PROVISIONS * 4.1 SDOD . unless otherwise specified in the contract or purchase order, the contractor is respon
13、sible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein,
14、 unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements. .I. 4.1.1 ResDonsUitv for c- . All items shall me
15、et all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or suppl
16、ies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements; however, this does not authorize submission of known defective material, either i
17、ndicated or actual, , nor does it commit the Government to accept defective material. The absence of any inspection f inswction . The inspection 4.2 rlassification o requirements specified herein are classified as follows: a. Visual examination (see 4.4). b. Review of construction records (see 4.5).
18、 4.3 First a rticle insnectio n. When a first article inspection is required (see 3.1 and 6.21, it shall be examined for defects specified in 4.4 and the construction record reviewed for compliance with 4.5. 4.4 Visual exam ination. The GIP shall be examined for defects and errors as specified by th
19、e contracting officer or,by internal DMA standard procedures. Required corrections shall be made to manuscripts, drafting positives, and reproducible material before the GIP is sent to the next production stage. Defects detected during the inspection of the printed “catch copy“ shall be evaluated by
20、 DMA for criticality, and suitable corrective action. 4.5 r n . Records about the constructivfethoef Ishiboe :z!n“t,“yned. The records shall document sources, decisions regarding reconciliatlon of conflicting data, etc. GIP records/construction histories shall Licensed by Information Handling Servic
21、esMIL-G-9103 W 999990b 1977461 220 MIL-G- 89 1 O3 be reviewed concurrently with visual examinations (see 4.4) to ensure that proper cartographic procedures have been followed. 4.6 Customer reviey . Users finding errors within the product which would impact successful conduct of operations or hazard
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DODMILG891031994GRIDDEDINSTALLATIONPHOTOGRAPHGIP 网格 照相 设备 GIPPDF

链接地址:http://www.mydoc123.com/p-701826.html