1、BSI Standards PublicationInformation technology Cabling installationPart 99-1: Remote poweringPD CLC/TR 50174-99-1:2015National forewordThis Published Document is the UK implementation of CLC/TR 50174-99-1:2015.Please note: Section 6.4.1 contains a recognised error which will be corrected during a f
2、uture revision of this document; 0.15 m should read 0.015 m.The UK participation in its preparation was entrusted to TechnicalCommittee TCT/7, Telecommunications Installation requirements.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publicatio
3、n does not purport to include all the necessary provisions ofa contract. Users are responsible for its correct application. The British Standards Institution 2015.Published by BSI Standards Limited 2015ISBN 978 0 580 90499 8ICS 35.110Compliance with a British Standard cannot confer immunity fromlega
4、l obligations.This Published Document was published under the authority of theStandards Policy and Strategy Committee on 30 June 2015.Amendments/corrigenda issued since publicationDate Text affectedPUBLISHED DOCUMENTPD CLC/TR 50174-99-1:2015TECHNICAL REPORT RAPPORT TECHNIQUE TECHNISCHER BERICHT CLC/
5、TR 50174-99-1 April 2015 ICS 35.110 English Version Information technology - Cabling installation - Part 99-1: Remote powering This Technical Report was approved by CENELEC on 2015-04-06. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the
6、 Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the Unite
7、d Kingdom. European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2015 CENELEC All rights of exploitation in any form and by any means re
8、served worldwide for CENELEC Members. Ref. No. CLC/TR 50174-99-1:2015 E PD CLC/TR 50174-99-1:2015CLC/TR 50174-99-1:2015 - 2 - Contents Foreword 4 Introduction . 5 1 Scope 6 2 Normative references . 6 3 Terms, definitions, abbreviations and symbology 6 3.1 Terms and definitions . 6 3.2 Abbreviations
9、. 7 3.3 Symbology . 7 4 Overview . 7 4.1 General 7 4.2 Published standards . 8 4.3 Recent developments . 9 4.4 Basic principles of remote powering . 10 4.5 Testing protocols and mathematical modelling 10 5 Application of remote powering 10 5.1 Channel length . 10 5.2 Cables of Category 5 (minimum) i
10、n EN 50173-1 11 5.3 Installation environment . 12 5.4 Cable bundles 12 5.5 Connecting hardware of Category 5 (minimum) in EN 50173-1 13 5.6 Pathways and pathway systems 13 6 Operation 14 6.1 Design margin 14 6.2 Cable bundle temperature and construction 14 6.3 Range of temperature rises 14 6.4 Insta
11、llation guidance 16 6.5 Record-keeping 16 6.6 Cabling acceptance and trouble-shooting testing 16 Annex A (informative) Powering concepts . 17 A.1 Principles . 17 A.2 Mathematical treatment 17 A.3 Power dissipation . 19 Annex B (normative) Test protocol . 20 B.1 Background 20 B.2 Test set-up . 20 B.3
12、 Current delivery and measurement accuracy 22 B.4 Test conditions . 22 B.5 Installation environment . 22 B.6 Data submission. 23 PD CLC/TR 50174-99-1:2015- 3 - CLC/TR 50174-99-1:2015 Annex C (normative) Temperature rise modelling . 25 C.1 Model basics 25 C.2 Power dissipated (P) 25 C.3 Temperature d
13、ifference from ambient temperature to bundle surface (Tu) . 26 C.4 Temperature difference from bundle surface to bundle centre (Tth) 26 C.5 Temperature variation within the bundle (T(x) 27 C.6 Alternative presentation of the model 27 Bibliography 28 PD CLC/TR 50174-99-1:2015CLC/TR 50174-99-1:2015 -
14、4 - Foreword This document (CLC/TR 50174-99-1:2015) has been prepared by CLC/TC 215 “Electrotechnical aspects of telecommunication equipment“. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held re
15、sponsible for identifying any or all such patent rights. PD CLC/TR 50174-99-1:2015- 5 - CLC/TR 50174-99-1:2015 Introduction EN 50174 series specify the specification, planning and practices applicable to installation of telecommunications cabling. Balanced cabling in accordance with EN 50173-1 is in
16、creasingly used to provide power as well as telecommunication services to a wide range of terminal equipment. This Technical Report examines the effects of remote powering (i.e. thermal heating) on installed cabling. The components considered are of those specified in EN 50173-1. The components of C
17、ategory 5 as defined in EN 50173:1995 were not specified in terms of current carrying capacity etc.; they are not supported by this Technical Report. This Technical Report supports recognized application standards for power feeding produced by IEEE (IEEE 802.3at) but is not restricted to the current
18、 feeding specification of that standard. The delivery of POTS, ISDN, PoE and PoEplus using fully energized bundles of up to 100 cables in accordance with EN 50288-X-1 in ventilated pathways is not considered to represent a problem and is not considered in this Technical Report. In addition, there is
19、 no reported evidence of such installations of those remote powering applications producing problems in unventilated conditions. As a result, this Technical Report will only consider such situations if the modelling and subsequent testing of cabling implementations indicates any cause for concern. P
20、D CLC/TR 50174-99-1:2015CLC/TR 50174-99-1:2015 - 6 - 1 Scope This Technical Report defines requirements and recommendations concerning limits for the application and operation of remote powering using cabling comprising balanced cabling components of Category 5 and above as defined in EN 50173-1. Th
21、is Technical Report also describes: a set of specific implementations which are the basis of a mathematical model for the temperature increases in bundles of cables under remote powering conditions; a matching testing protocol used to provide data for the mathematical model; NOTE The testing protoco
22、l was established in order to enable comparison of data from different sources in order to support the development of the mathematical model and to develop appropriate planning and installation rules as suggested by different installation conditions. It is not the role of CLC/TC 215 to develop test
23、methods for balanced, or other, cables and the protocol defined in Annex B is not as such a test method. the mathematical model that is employed as the basis for the resulting requirements and recommendations. Safety (electrical safety and protection, optical power, fire, etc.) and electromagnetic c
24、ompatibility (EMC) requirements are outside the scope of this Technical Report and are covered by standards and regulations. However, information given in this Technical Report may be of assistance in meeting these standards and regulations. 2 Normative references The following documents, in whole o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CLCTR501749912015INFORMATIONTECHNOLOGYCABLINGINSTALLATIONPART991REMOTEPOWERINGPDF

链接地址:http://www.mydoc123.com/p-629487.html