COE EP 1130-2-510-1996 HYDROELECTRIC POWER OPERATIONS AND MAINTENANCE GUIDANCE AND PROCEDURES《水电运行及维护指南及规程》.pdf
《COE EP 1130-2-510-1996 HYDROELECTRIC POWER OPERATIONS AND MAINTENANCE GUIDANCE AND PROCEDURES《水电运行及维护指南及规程》.pdf》由会员分享,可在线阅读,更多相关《COE EP 1130-2-510-1996 HYDROELECTRIC POWER OPERATIONS AND MAINTENANCE GUIDANCE AND PROCEDURES《水电运行及维护指南及规程》.pdf(80页珍藏版)》请在麦多课文档分享上搜索。
1、CECW-OM Pamphlet NO. 1130-2-510 DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, D.C. 20314-1000 EP 1 130-2-5 10 13 December 1996 Project Operations HYDROELECTRIC POWER OPERATIONS AND MAINTENANCE GUIDANCE AND PROCEDURES TABLE OF CONTENTS CHAPTER 1 - Introduction Purpose Ap licability
2、Glossary Re i! erences Paragraph 1-1 1-2 1-3 1-4 Page 1-1 1-1 1-1 1-1 CHAPTER 2 - Reports on Hydroelectric Power Generation Statistics And Operating Logs Guidance 2- 1 2-1 2-2 2-3 2-1 2-1 CHAPTER 3 - Coordination of Hydroelectric Power Operations With Power Marketing Agencies Reserved. CHAPTER 4 - P
3、roject Em loyee Refresher Operational Exercises For Emergency Stations, Multiple-purpose Projects fN ith Power Reserved. CHAPTER 5 - Hydroelectric Power Plant Trainees mirpose Rationale Selection of Trainees Employment Provisions Training Responsibilities Training Sites Program Details Training Pro
4、ram Schedule Failure to Maintain Satisfactory Training Accomplishments Training Ev J uation Progress 5- 1 5-2 5-3 5-4 5-5 5-6 5-7 5-a 5-9 5-10 5-11 5-1 5-1 5-1 5-1 5-2 5-3 5-3 5-4 5-4 5-5 5-5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- COE EP 11
5、30-2-510 3515789 0676700 242 EP 1130-2-510 13 Dec 96 Training Records Certificate of Completion Training at the Journeyman Level Paragraph 5-12 5-13 5-14 CHAPTER 6 - Rewind of Hydroelectric Generators And Generator Motors Purpose Background Guidance 6- 1 6-2 6-3 APPENDIX A - Congressional Report For
6、mat APPENDIX B - Rate Computation APPENDIX C - Generating Equipment Service Summary (ENG Form 4338 E) APPENDIX D - MSC Summary Report Format For Hydropower Generation APPENDIX E - Equipment Failure And System Disturbance Telephone Report APPENDIX F - Monthly Power Plant (DOE Form EIA-759) Report APP
7、ENDIX G - Training Program Schedule APPENDIX H - Training Accomplishments APPENDIX I - Training Records APPENDIX J - Certificate of Training (DA Form 87) APPENDIX K - Background Information APPENDIX L- Evaluation Items APPENDIX M - Economic Analysis Guidance APPENDIX N - Additional Technical Referen
8、ces Page 5-5 5-5 5-5 6-1 6-1 6-1 A- 1 B- 1 c- 1 D- 1 E- 1 F- 1 G- 1 H- 1 I- 1 J- 1 K- 1 L- 1 M- 1 N- 1 Il Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-COE EP 1130-2-510 3535789 0676703 389 EP 1130-2-5 10 13 Dec 96 CHAPTER 1 - INTRODUCTION . This p
9、amphlet establishes the guidance for the operation and maintenance (O i.e., the tune during which the generator main power circuit breaker is closed. repair that have been programmed into the power schedule. NOTE 1: When a variety of work is performed on both generating unit and non-generatin ui men
10、t, the primary reason for the outage will deteme to which category the outage ours ?U ge charged. Outages due to reservoir conditions, high tailwaters, flood control operations, loss of transmission lines, or short outages for trash removal are not to be considered unavailable time. q. Scheduled Out
11、age Hours (SOH). The hours for routine repetitive maintenance and f 1-3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-EP 1130-2-5 10 13 Dec 96 CHAPTER 2 - REPORTS ON HYDROELECTRIC POWER GENERATION STATISTICS 2- 1 mirpose. This chapter establishes g
12、uidance for reporting US ACE hydroelectric power statistics, including the availability, failure and usage rates of generating equi ment; power generating equipment failures and generation interruptions; monthly power p 4an t generation; and m-service data at multiple-purpose projects having hydroel
13、ectric power. 2-2. Back-round. a. This pamphlet provides guidance for implementing the following hydropower statistical and informational re orting requirements to Congress and other designated recipients, as defmed in ER 1130-2-510, 8 hapter 2, Reports on Hydroelectric Power Generation Statlstics,
14、and for coordinating the operation of the Corps of Engineers hydroelectric generating facilities with the power marketing agencies. Reporting requirements include: (1) general hydroelectric power generation equipment operational and cost data; (2) the availability, failure and usage rates of generat
15、ing equipment at multiple-purpose (3) power generating equipment failures and generation interruptions; and (4) the in-service dates for hydroelectric generating units and reporting the monthly b. Section 5 of the Act of December 22, 1944 (PL 534,78th Congress) provides that projects having hydroele
16、ctric power; power plant generation on the Department of Energy Form EIA-759. electric power and energy generated at reservoir rojects under the control of the Department of the Army and in the opinion of the Secretary of ti e Army not required in the operation of such projects shall be delivered to
17、 the Secretary of Interior for transmittal and disposal in a manner to encourage the most widespread use thereof at the lowest possible rates to consumers consistent with sound business principles. c. Section 302 of the Department of Energy Or anization Act (PL 95-91) transfer all functions of the S
18、ecretary of Interior under Section 5 o i! the 1944 Act to the Secretary of Energy together with all other functions of the Secretary of Interior, and officers and components of the Department of the Interior, with respect to Southeastern Power Administration; the Southwestern Power Administration; t
19、he Alaska Power Administration; the Bonneville Power Administration; Western Area Power Administration; and the power marketing functions of the Bureau of Reclamation. 2-3. Guidance. a. Congressional Reports. Section 937, Reports on Hydropower Statistics, PL 99-662, Water Resources Development Act o
20、f 1986, states that the Secret the Committee on Public Works and Transportation of the House Committee on Environment and Public Works of the Senate, a resources project constructed by the Army Corps of Engineers which generates electricity. (See Appendix A.) and the 2- 1 Provided by IHSNot for Resa
21、leNo reproduction or networking permitted without license from IHS-,-,- _ COE EP l130-2-5LO 3515789 Ob7b705 824 EP 1130-2-5 10 13 Dec 96 (1) The report shall specify: (a) Amount of electricity generated; (b) Revenues received by the United States from the sale of electricity; (c) Costs of constructi
22、on, operation, and maintenance allocated to power; and (d) Balance owed to the US Treasury by the Power Marketing Administration. (2) Submission Dates. The report is due to the Congress b the 15th of January each year. b. Service Rates for Generating Equipment. (1) Each year, on a fiscal year basis,
23、 districts having multi-purpose projects with The field operating activities will submit to CECW-OM their data ii y 15 December each year. hydropower will determine and report the rates listed below for each hydroelectric project. These rates will be composite for each project, based on the total ma
24、in unit hours in each category for all units at the project, and computed as indicated in Appendix B. o In-service operating rate. o Generator scheduled outage rate. o Standby rate. o Non-generator scheduled outage e Availability rate. e Planned modification outage rate. o Generator forced outage ra
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- COEEP113025101996HYDROELECTRICPOWEROPERATIONSANDMAINTENANCEGUIDANCEANDPROCEDURES 水电 运行 维护 指南 规程 PDF

链接地址:http://www.mydoc123.com/p-620671.html