COE CEAGS 15300A-1991 SPRINKLER SYSTEMS FIRE PROTECTION NOTICE 1-2 (1994) INCORPORATED METRIC CHANGE (1993) INCORPORATED《喷射器系统 消防 加入了1-2(1994)注意事项以及公制变更(1993)》.pdf
《COE CEAGS 15300A-1991 SPRINKLER SYSTEMS FIRE PROTECTION NOTICE 1-2 (1994) INCORPORATED METRIC CHANGE (1993) INCORPORATED《喷射器系统 消防 加入了1-2(1994)注意事项以及公制变更(1993)》.pdf》由会员分享,可在线阅读,更多相关《COE CEAGS 15300A-1991 SPRINKLER SYSTEMS FIRE PROTECTION NOTICE 1-2 (1994) INCORPORATED METRIC CHANGE (1993) INCORPORATED《喷射器系统 消防 加入了1-2(1994)注意事项以及公制变更(1993)》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、3515789 0458574 b1T DEPARTMENT OF THE ARMY CEAGS-15300A (November 1991) U.S. ARMY CORPS OF ENGINEERS ABRIDGED GUIDE SPECIFICATION FOR MILITARY CONSTRUCTION Includes metric Special change (September 1993) Includes changes through Notice 2 (June 1994) Latest Notice change indicated by Supple I, II Sup
2、ple) submittals having an riFIO1t designation are for information only. The following shall be submitted in accordance with Section 01300 SUBMITTAL DESCRIPTIONS: SD-O1 Data Spare Parts Data; FIO. Spare parts data for each different item of material and equipment specified, after approval of the deta
3、il drawings, and not later than c- 3 months prior to the date of beneficial occupancy. include a complete list of parts and supplies, with current unit prices and The data shall source of supply, and a list of the parts recommended by the manufacturer to be replaced after i and 3 years of service. Q
4、ualification of Fire Protection Engineer; FIO. Qualifications with verification or license number of the registered Fire Protection Engineer who has at least 4 years of current experience in the design of fire protection and detection systems. Test Procedures; FIO. Detailed test procedures for the f
5、ire protection system, 60 days prior to performing system tests. The test procedures shall be signed by the Fire Protection Engineer. SD-04 Drawings Fire Protection/Detection System; GA. Detail drawings for Fire Protection/Detection System shall be one integrated submittal and shall consist of illus
6、trations, calculations to support pipe sizing schedules, performance charts, instructions, brochures, diagrams and complete detail drawings of the sprinkler system and any other information required to illustrate the system has been coordinated and will function as a unit. Detail drawings shall be o
7、n full-size Mylar Sheets. Detail drawings shall conform to the requirements established for working plans as prescribed in NFPA 13. The submittal shall be prepared and sealed by the Fire Protection Engineer. The detail drawings shall be updated to reflect As-Built conditions after all associated wor
8、k is completed and submitted as full-size Mylars. SD-O6 Instructions Framed Instructions; FIO. Proposed diagrams, instructions, and other sheets, prior to posting. The framed instructions shall be posted at each alarm check dry pipe and deluge solenoid valve. Framed instructions under glass or in la
9、minated plastic, including wiring and control diagrams showing the complete layout of the entire system, shall be posted where directed. Condensed operating instructions explaining preventive maintenance procedures, methods of checking the system for normal safe operation, and procedures for safely
10、starting and stopping the system shallbe prepared in typed form, framed as specified above for the wiring and control diagrams and posted beside the diagrams. The framed instructions shall be posted before acceptance Provided by IHSNot for ResaleNo reproduction or networking permitted without licens
11、e from IHS-,-,-W 35l1579 0458536 492 = testing of the systems. SD-09 Reports Tests; FIO. Test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria upon completion and testing of th
12、e installed system. Each test report shall indicate the final position of controls. SD-19 Operation and Maintenance Manuals Fire Protection/Detection System; FIO. Six complete copies of the operation manual outlining the step by step procedures required for system startup, operation and shutdown. Th
13、e manual shall include the manufacturers name, model number, catalog cuts, diagrams, drawings, parts list, and descriptive data covering the proper operation and testing. Six complete copies of the maintenance manual listing routine maintenance procedures; possible breakdowns and repairs, and troubl
14、eshooting guides. The manual shall include simplified diagrams for the system as installed. 1.3 GENERAL REQUIREMENTS NOTE: The designer will show details of the points of connection, size of water main and other features necessary to design the sprinkler system. The sprinkler system shall be designe
15、d by the pipe schedule method in accordance with the requirements specified or indicated, and in accordance with NFPA 13. All contract requirements that exceed the minimum requirements of NFPA 13 shall be incorporated into the design. The system shall be wet pipe dry pipe preaction type and ordinary
16、 hazard class (Group 1). Wet pipe sprinkler system utilizing plastic piping shall additionally incorporate special design and installation criteria relative to pipe hanger spacing, piping and sprinkler restraint, sprinkler temperature rating, piping location, testing procedure, and friction loss cha
17、racteristics which are specified in the manufacturers written installation instructions. 1.3.1 Standard Products Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products. 1.3.2 Asbestos Prohibition Asbestos and asbestos-containing p
18、roducts shall not be used. 1.3.3 Nameplates Motors shall have the manufacturers name, address, type or style, model or serial number, and catalog number on a plate secured to the item of equipment. 1.3.4 Verification of Dimensions Provided by IHSNot for ResaleNo reproduction or networking permitted
19、without license from IHS-,-,-g 3515789 OY58577 329 9 The Contractor shall become familiar with all details of the work, verify all dimensions in the field, and shall advise the Contracting Officer of any discrepancy before performing the work. 1.3.5 Welding Welding shall be in accordance with NFPA 1
20、3. Only shop welding with appropriate welding fittings shall be used. 1.4 DELIVERY AND STORAGE All equipment placed in storage shall be stored with protection from the weather, humidity and temperature variations, dirt and dust or other contaminants. PART 2 PRODUCTS 2.1 MATERIALS Materials and equip
21、ment shall be compatible with any existing features, shall comply with NFPA 13, and shall be listed in UL-O4 or FM P7825 for use in sprinkler systems where applicable. 2.1.1 Chlorine, Liquid AWA B301. 2.1.2 Hypochlorites AWWA B300. 2.2 ELECTRICAL WORK Electric equipment and wiring shall be in accord
22、ance with Section 16415 ELECTRICAL WORK, INTERIOR. Conduit, wiring, control, signal devices, and all associated equipment for the herein specified systems, shall be provided under this section of the specifications. PART 3 EXECUTION 3.1 INSTALLATION Unless otherwise indicated or specified, all mater
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- COECEAGS15300A1991SPRINKLERSYSTEMSFIREPROTECTIONNOTICE121994INCORPORATEDMETRICCHANGE1993INCORPORATED

链接地址:http://www.mydoc123.com/p-620628.html