1、BS 8476:2007Code of practice for the safe use of concrete pumpsICS 91.220NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBRITISH STANDARDPublishing and copyright informationThe BSI copyright notice displayed in this document indicates when the document was last issued. BSI 2007
2、ISBN 978 0 580 50524 9The following BSI references relate to the work on this standard:Committee reference B/513Draft for comment 06/30137706 DCPublication historyFirst published April 2007Amendments issued since publicationAmd. no. Date Text affectedBS 8476:2007 BSI 2007 iBS 8476:2007ContentsForewo
3、rd iii1 Scope 12 Terms and definitions 13 Selection of personnel 34 Training and certification 45 Management of the concrete pumping operation 56 Selection of concrete pumps 77 Travelling to and from the site 88 Arrival on site and setting up the machine 99 During the pour 1010 Work with delivery li
4、nes 1211 Pumping special concretes 1412 Cleaning out the machine and delivery lines 1413 Leaving the site (lorry-mounted concrete pumps) 1514 Personal protective equipment 1515 Concrete pump examination and testing 1616 Maintenance 17AnnexesAnnex A (normative) Recommended signals 19Annex B (normativ
5、e) Inspection of delivery lines 20Annex C (informative) Pipeline wall thickness pressure Maintenance card 21Bibliography 22List of figuresFigure 1 Example concrete pump hire check list 18Summary of pagesThis document comprises a front cover, an inside front cover, pages i to iv, pages 1 to 22, an in
6、side back cover and a back cover.BS 8476:2007ii BSI 2007 This page deliberately left blank BSI 2007 iiiBS 8476:2007ForewordPublishing informationThis British Standard was published by BSI and came into effect on 1 May 2007. It was prepared by Subcommittee B/513/-/8, Concrete plant, under the authori
7、ty of Technical Committee B/513, Construction equipment and plant and siting. A list of organizations represented on this committee can be obtained on request to its secretary.Use of this documentAs a code of practice, this British Standard takes the form of guidance and recommendations. It should n
8、ot be quoted as if it were a specification and particular care should be taken to ensure that claims of compliance are not misleading.It should be noted that this code of practice provides the minimum standards necessary for the operation of all types of concrete pumping equipment in addition to any
9、 other guidance and legislation that might be appropriate.Any user claiming compliance with this British Standard is expected to be able to justify any course of action that deviates from its recommendations.Presentational conventionsThe provisions of this standard are presented in roman (i.e. uprig
10、ht) type. Its recommendations are expressed in sentences in which the principal auxiliary verb is “should”.Commentary, explanation and general informative material is presented in smaller italic type, and does not constitute a normative element.The word “should” is used to express recommendations of
11、 this standard. The word “may” is used in the text to express permissibility, e.g. as an alternative to the primary recommendation of the clause. The word “can” is used to express possibility, e.g. a consequence of an action or an event.Contractual and legal considerationsThis publication does not p
12、urport to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legal obligations.BS 8476:2007iv BSI 2007In particular, attention is drawn to the following statutory regulations:The Health
13、and Safety at Work etc. Act 1974 1The Control of Noise at Work Regulations 2005 2The Control of Substances Hazardous to Health Regulations 2002 3The Lifting Operations and Lifting Equipment Regulations 1998 4The Provision and Use of Work Equipment Regulations 1998 5The Road Traffic Act 1991 6The Con
14、struction (Safety, Health and Welfare) Regulations 1996 7The Management of Health and Safety Regulations 1999 8The Manual Handling Operations Regulations 1992 9The Control of Vibration at Work Regulations 2005 10The Work at Height Regulations 2005 11The Reporting of Injuries, Diseases and Dangerous
15、Occurrences Regulations 1995 12 BSI 2007 1BS 8476:20071 Scope1.1 This British Standard gives recommendations for the safe use of concrete pumping and placing equipment. 1.2 This British Standard is not applicable to plaster and screed pumps. It is not applicable to the construction of the machinery,
16、 which is covered by BS EN 12001.2 Terms and definitionsFor the purposes of this British Standard, the following definitions apply:2.1 admixturematerial which is added to concrete to change the properties of the mix2.2 ball-catcherdevice fitted to the delivery end of a delivery pipeline and designed
17、 to catch the sponge/rubber cleaning device used for cleaning the delivery lineNOTE In the piling industry, this is commonly referred to as a “blowout basket”, “washout basket” and “catch basket”.2.3 banksmanperson with appropriate training who directs vehicle movements on site2.4 boom tip safety de
18、vicedevice fitted to the end of the concrete-placing boom which is attached to the placement hose and which is designed to retain the placement hose if the coupling attaching it to the boom delivery pipeline fails2.5 competent personperson engaged by the owner who has responsibility for thorough exa
19、minations and who has had sufficient experience, instruction and training to enable them to carry out their duties2.6 concretehomogenous mix of cement, graded aggregate and water, to which additives might be added2.7 concrete-placing boomdevice to support and position the delivery pipeline NOTE 1 Fo
20、r the purposes of this standard, the term is applicable to rotary/circular distributors.NOTE 2 A concrete-placing boom is often an adjunct to the concrete pump, but is not essential in some applications.2.8 concrete pump item of plant that works by pistons or a rotary pump and is used for pumping or
21、 spraying concrete to the placing position through a delivery pipeline alone or through a delivery pipeline attached to a concrete-placing boomBS 8476:20072 BSI 20072.9 delivery pipelineslines, whether steel or rubber, through which the concrete is conveyed NOTE These include pipelines, hoses, coupl
22、ing connectors and any valves inserted in the line. Each element of the pipeline is capable of resisting the likely maximum pressure plus a safety margin exerted by the concrete pump.2.10 hirercompany, firm, person, corporation or public authority taking the owners plant on hire, including their suc
23、cessors or personal representatives2.11 interlockmechanical, electrical or other type of device, the purpose of which is to prevent the operation of hazardous machine functions under specified conditions (generally as long as a guard is not closed) BS EN 12100-12.12 lorry-mounted concrete pumpconcre
24、te pump that is mounted on a self-propelled lorry2.13 ownercompany, firm or person letting the concrete pump on hire, including their successors, assignees or personal representatives2.14 placement hoseflexible hose to provide freedom of movement in the final placing of concrete2.15 receiving hopper
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS84762007CODEOFPRACTICEFORTHESAFEUSEOFCONCRETEPUMPS 混凝土泵 安全 使用 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-547405.html