1、BRITISH STANDARD BS7335-2:1991Installation of monolithic refractoriesPart2: Code of practice for installation by gunningBS7335-2:1991This BritishStandard, having been prepared under the directionof the Refractory Products Standards Policy Committee, was published underthe authority of the BoardofBSI
2、 and comesintoeffecton 28February1991 BSI 01-2000The following BSI references relate to the work on this standard:Committee reference RPM/8Draft for comment89/40140DCISBN 0 580 18709 8Committees responsible for this BritishStandardThe preparation of this BritishStandard was entrusted by the Refracto
3、ry Products Standards Policy Committee (RPM/-) to Technical CommitteeRPM/8, upon which the following bodies were represented:British Cement AssociationBritish Ceramic Research Ltd.British Metallurgical Plant Constructors AssociationBritish Steel IndustryCoke Oven Managers AssociationCombustion Engin
4、eering AssociationDepartment of Trade and IndustryEnergy Industries CouncilEngineering Equipment and Materials Users AssociationInstitute of Refractories EngineersMETCONNational Federation of Master Steeplejacks and Lightning Conductor EngineersRefractories Association of Great BritainRefractory Con
5、tractors AssociationAmendments issued since publicationAmd. No. Date CommentsBS7335-2:1991 BSI 01-2000 iContentsPageCommittees responsible Inside front coverForeword ii1 Scope 12 Definitions 13 Planning 14 Personnel 25 Gunning materials 26 Water supply 37 Equipment 38 Preparation for gunning 79 Inst
6、allation 910 Replacement of unsatisfactory panels 1311 Curing 1412 Drying out and initial firing 1513 Quality of the lining 15Figure 1 Operation of feed-wheel gun 17Figure 2 Detail of lower chamber of feed-wheel gun 19Figure 3 Detail of barrel of rotating barrel gun 20Figure 4 Rotating bowl gun 21Fi
7、gure 5 Components of typical dry mix gunning nozzle 21Figure 6 Test panel box 22Table 1 Air pressure guide 11Table 2 Troubleshooting guide 14Publication(s) referred to Inside back coverBS7335-2:1991ii BSI 01-2000ForewordThis Part of BS7335 was prepared under the direction of the Refractory Products
8、Standards Policy Committee.The purpose of this code of practice is to advise on good or recommended practices before, during and after installation. Nothing in the code should be taken as a specification for either the materials or their installation.Assessed capability. Users of this BritishStandar
9、d are advised to consider the desirability of assessment and registration of a suppliers quality systems against the appropriate Part of BS5750 by a third party certification body.A British Standard does not purport to include all the necessary provisions of a contract. Users of British Standards ar
10、e responsible for their correct application.Compliance with a British Standard does not of itself confer immunity from legal obligations.Summary of pagesThis document comprises a front cover, an inside front cover, pagesi andii, pages1 to22, an inside back cover and a back cover.This standard has be
11、en updated (see copyright date) and may have had amendments incorporated. This will be indicated in the amendment table on the inside front cover.BS7335-2:1991 BSI 01-2000 11 ScopeThis Part of BS7335 describes good practice for working procedures in the installation of refractory linings by gunning
12、techniques. The code is specifically concerned with the “dry” gunning of initial or replacement linings, using refractory materials bonded by calcium aluminate cement. Major repairs, involving the removal of old panels of the lining back to the shell, are also covered. Recommendations for ensuring t
13、hat compliance with the agreed design has been achieved are included, where appropriate.Wet gunning and gunning repairs to hot linings are excluded. The gunning of linings for steel chimneys is specifically described in BS4207.NOTEThe titles of the publications referred to in this standard are liste
14、d on the inside back cover.2 DefinitionsFor the purposes of this Part of BS7335, the definitions given in BS3446-1 apply, together with the following.2.1 gunningthe hot or cold application of a refractory material by means of a pneumatic gun1)2.2 predampingthe process of mixing an amount of water, l
15、ess than the total water content, with dry material prior to dry gunning2.3 dry gunninga gunning process in which dry or predamped material is pneumatically conveyed to a nozzle where water is added2.4 wet gunninga gunning process in which concrete premixed with the total water content is conveyed u
16、nder pressure to a nozzle where air is used to propel the concrete into position2.5 hot gunningthe repair of a hot furnace lining by gunning2.6 material delivery hosehose used for conveying the gunning material from the gun to the nozzle2.7 panelthe minimum area of lining that is gunned in any conti
17、nuous operation3 PlanningNOTEThe installation should be planned in detail, in advance, so that work on site can proceed quickly and efficiently. The check list in 3.1 to 3.19 is given as an aid to drawing up such a plan.3.1 The safety requirements of the site should be considered, taking guidance wh
18、ere necessary from appropriate publications by the Health and Safety Executive. (See7.11.)3.2 A drawing detailing the materials of construction, the thickness of the lining layer(s), specification and arrangement of anchors, and other features, such as expansion allowance and joint arrangements, sho
19、uld be available.3.3 The extent of the job and the time available should be determined so that the required rate of installation may be calculated and an appropriate schedule for gunning prepared. Allowance should be included for any preparation of the shell which may be necessary, including the fix
20、ing of anchors.3.4 The number of men required to enable each panel of the lining to be placed continuously and correctly in the allocated time should be established.3.5 The material storage conditions and storage duration should be evaluated so that suitable packaging, for example hermetically seale
21、d drums or paper sacks, may be agreed. If possible gunning material should be ordered well in advance and delivered to site shortly before installation commences.3.6 A water supply of appropriate quality, capacity and temperature should be provided.3.7 Materials handling and waste disposal facilitie
22、s should be provided as appropriate for the materials and equipment involved.3.8 The number and type of formers, profile boards, scaffolding and staging required to achieve the planned installation should be determined, and prepared and installed prior to commencement of refractories installation.3.
23、9 Guns, nozzles, predamping equipment, and hoses for air, water and gunning material, appropriate for the planned installation, should be provided. Wear of components within the gunning equipment, and the possible effect of the inclusion of trace materials from this source in the gunned lining, shou
24、ld be assessed and appropriatecounter-measures taken where necessary.1) Repeated from BS3446-1.BS7335-2:19912 BSI 01-20003.10 Suitable electrical power supplies should be arranged, with due regard to voltage, frequency, current and phase requirements. Artificial lighting should be provided, if neces
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS733521991INSTALLATIONOFMONOLITHICREFRACTORIESCODEOFPRACTICEFORINSTALLATIONBYGUNNING 整体 耐火材料 安装 喷涂 实用

链接地址:http://www.mydoc123.com/p-546721.html