1、BRITISH STANDARD BS 5192-6: 1993 Guide to production control Part 6: Computer aided production controlBS5192-6:1993 This British Standard, having been prepared under the directionof the Quality, Management and Statistics Standards Policy Committee, waspublished under the authorityof the Standards Bo
2、ardand comes into effect on 15 May1993 BSI 03-1999 The following BSI references relate to the work on this standard: Committee reference QMS/33 Draft for comment90/97592 DC ISBN 0 580 21623 3 Committees responsible for this British Standard The preparation of this British Standard was entrusted by t
3、he Quality, Management and Statistics Standards Policy Committee (QMS/-) to Technical Committee QMS/33, upon which the following bodies were represented: British Computer Society British Production and Inventory Control Society Chartered Institute of Management Accountants EEA (The Association of El
4、ectronics, Telecommunications and Business Equipment Industries) Institute of Logistics and Distribution Management Ministry of Defence Nottingham University PERA International (Production Engineering Research Association) University of Bradford University of Manchester Institute of Science and Tech
5、nology Amendments issued since publication Amd. No. Date CommentsBS5192-6:1993 BSI 03-1999 i Contents Page Committees responsible Inside front cover Foreword ii Introduction 1 1 Scope 1 2 References 1 3 Definitions 1 4 Specification of requirements 1 5 Option selection of standard packages 5 6 Bespo
6、ke systems 8 7 System selection and justification 9 8 Implementation 10 9 Ongoing operation of computer aided production management (CAPM) 12 10 Future trends 15 Annex A (informative) Development of the use of computers in production control 17 Annex B (informative) Production and inventory control
7、software 19 Figure 1 Stages of production control 2 Table B.1 Standard modules and functions 20 List of references Inside back coverBS5192-6:1993 ii BSI 03-1999 Foreword This Part of BS5192 has been prepared under the direction of the Quality, Management and Statistics Standards Policy Committee. Th
8、e prime objective of production control is to help a company become more competitive and profitable. An effective production control function endeavours to fulfil this objective by keeping a balance between satisfying sales demand, achieving high plant utilization and maintaining low investment in s
9、tocks and work-in-progress. An optimum balance between these often conflicting objectives will only be achieved by a production control system designed to meet the specific needs of the company and run by well trained and dedicated staff. BS5192 is published in six Parts and gives comprehensive guid
10、ance in those areas that are considered essential for effective production control. The Parts are as follows: Part 1: Introduction; Scope of the guide, purpose of production control, relationship to other functions, technological changes, choosing the system to fit the business. Part 2: Production p
11、rogramming; Relationship to corporate and business programmes, planning techniques, master production scheduling, capacity planning. Part 3: Ordering methods; The various types of ordering and stock control systems, comparing the advantages of each for particular applications. Part 4: Dispatching (s
12、hop-floor control); The methods of shop-floor production control and documentation involved and the increasing influence of computers. Part 5: The relationship between production control and other management functions; The production control information flows in the organization, their generation, p
13、resentation, use and maintenance. Part 6: Computer aided production control; The application of computer software to the production control function. Throughout this standard the use of the pronouns he, him and his is intended to be non-gender-specific. A British Standard does not purport to include
14、 all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages This document comprises a front cover, an inside front cover, pages i
15、and ii, pages1to 22, an inside back cover and a back cover. This standard has been updated (see copyright date) and may have had amendments incorporated. This will be indicated in the amendment table on theinside front cover.BS5192-6:1993 BSI 03-1999 1 Introduction The planning and information flows
16、 in the various stages of a production control system (see Figure 1) can be facilitated by the use of computers. This Part of BS5192 describes the benefits of the use of computers in the production control process. The capabilities of computers to store, maintain, manipulate and share large volumes
17、of data and communicate information very quickly is ideally suited to the present day needs of production control. Todays manufacturer can be faced with international competition, quickly changing markets, the customers expectation of significant reductions in design-to-delivery lead times and sever
18、e profit margin erosion. Much of this pressure is brought about by the intelligent use of computers by the competition especially in the field of production control. The effective management of this area of the business is vital and can lead to significant cost reductions in the areas of work in pro
19、gress and component stores; it can also lead to an overall reduction in delivery lead time. To remain viable and to meet and beat the competition, manufacturers should seriously evaluate the use of computer aids in production control. This evaluation has to be professional in terms of the objectives
20、 and the likely costs and benefits. The effort required is large and cannot be taken lightly, but the rewards in terms of improvements in performance and management control can be enormous. NOTEThe development of the use of computers in production control is described in Annex A. 1 Scope This Part o
21、f BS5192 gives guidance on the use of computers in production control. It does not describe the use of computers in other areas of the business such as computer aided design, engineering management, finance, purchasing, payroll, maintenance and sales order processing. However, the techniques and req
22、uirements identified and recommended in this Part of BS5192 for the establishment of a formal specification of requirement, selection and justification of a computerized production control system (either bespoke or a commercial package), installation and implementation of the system, together with t
23、he guidance on ongoing operational requirements and future trends, may be applicable not only to production control systems but equally to the professional evaluation, selection, implementation and operation of any business system in the manufacturing company. 2 References 2.1 Normative references T
24、his Part of BS5192 incorporates, by reference, provisions from specific editions of other publications. These normative references are cited at the appropriate points in the text and the publications are listed on the inside back cover. Subsequent amendments to, or revisions of, any of these publica
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS519261993GUIDETOPRODUCTIONCONTROLCOMPUTERAIDEDPRODUCTIONCONTROL 生产管理 导则第 部分 计算机辅助 PDF

链接地址:http://www.mydoc123.com/p-544939.html