1、Designation: E2947 15E2947 16Standard Guide forBuilding Enclosure Commissioning1This standard is issued under the fixed designation E2947; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in paren
2、theses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 PurposeThis guide provides procedures, methods and documentation techniques that may be used in the application ofthe building enclosure commissioning
3、 (BECx) process. This guide is complementary to Practice E2813 and is aligned withANSI/ASHRAE/IES Standard 202 and ASHRAE Guideline 0.1.2 ExtentThe process outlined in this standard guide applies to each building delivery phase from pre-design through Owneroccupancy and operation. The specific appli
4、cation of this guide may vary to suit the Owner, the project delivery method and thebuilding project as outlined in the Owners Project Requirements (OPR).1.3 Primary FocusThe primary focus of this process includes, but may not be limited to, new construction of buildingenclosures, existing building
5、enclosures undergoing substantial renovation or alteration, and continuous commissioning ofenclosure systems.1.4 Contractual and Regulatory ObligationsThe methods described in this guide are not intended to supersede or otherwisereplace the contractual obligations reserved specifically for the parti
6、es responsible for the design and construction of a building orstructure, nor to alter the roles, responsibilities and duties that may otherwise be assigned to those parties by applicable regulatoryor statutory law.1.5 This standard does not purport to address all of the safety concerns, if any, ass
7、ociated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatorylimitations prior to use.2. Referenced Documents2.1 ASTM Standards:2E631 Terminology of Building ConstructionsE2813 Practice fo
8、r Building Enclosure Commissioning2.2 ASHRAE Guidelines and Standards:3ANSI/ASHRAE/IES Standard 202 Commissioning Process for Buildings and SystemsASHRAE Guideline 0 The Commissioning Process3. Terminology3.1 DefinitionsRefer to the most current edition of the following:3.1.1 ASTM E631 Terminology o
9、f Building Constructions.3.1.2 ASHRAE Guideline 0, Section 4, Definitions.3.1.3 ANSI/ASHRAE/IES Standard 202, Section 3, Definitions.3.2 Definitions of Terms Specific to This Standard:3.2.1 The following definitions, abbreviations, and acronyms are specific to the implementation of the commissioning
10、 processfor building enclosure systems. These definitions are applicable throughout this guideline. Terms that are not defined have theirordinarily accepted meanings within the context in which they are used.1 This guide is under the jurisdiction of ASTM Committee E06 on Performance of Buildings and
11、 is the direct responsibility of Subcommittee E06.55 on Performance ofBuilding Enclosures.Current edition approved Aug. 1, 2015Feb. 1, 2016. Published September 2015April 2016. Originally approved in 2014. Last previous edition approved in 20142015 asE2947-14.-15. DOI: 10.1520/E2947-1510.1520/E2947-
12、162 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.3 Available from American Society of Heating, Refrigerating
13、, and Air-Conditioning Engineers, Inc. (ASHRAE), 1791 Tullie Circle, NE, Atlanta, GA 30329,http:/www.ashrae.org.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not b
14、e technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Driv
15、e, PO Box C700, West Conshohocken, PA 19428-2959. United States13.2.2 basis of design, BOD, na document developed by the design team that records the technical concepts, assumptions,calculations, decisions, and product selections used to meet the Owners Project Requirements and to satisfy applicable
16、 regulatoryrequirements, standards and guidelines.3.2.2.1 DiscussionThe BOD document includes both narrative descriptions and lists of individual items that supports the design process.3.2.3 bidding and negotiation phase, npreparatory phase of the construction process delivery that assists in the so
17、licitation andselection of prospective bidders, including evaluation of requests for information, substitutions, development of Addenda, reviewof bids and qualifications and the award of trade contracts.3.2.3.1 DiscussionThis phase is followed by the pre-construction sub-phase.3.2.4 building enclosu
18、re, nthe terms “building enclosure” and “enclosure” refer collectively to materials, components,systems, and assemblies intended to provide shelter and environmental separation between interior and exterior, or between twoor more environmentally distinct interior spaces in a building or structure.3.
19、2.4.1 DiscussionThe building enclosure may include but is not limited to walls, fenestration, roofs, ceilings and floors (and the intentional openingsand penetrations through them).3.2.5 building enclosure commissioning, BECx, narchitecture or engineering-related technical services or both, performe
20、d onbehalf of the Owner that implements a quality-focused process for enhancing the delivery of a project by focusing on validatingduring the design phase and verifying during the construction phase that the performance of building enclosure materials,components, assemblies and systems are designed
21、and installed to meet the Owners Project Requirements.3.2.6 building enclosure commissioning plan, BECx plan, na document that outlines the scope, organization, schedule,allocation of resources, responsibilities, testing and documentation requirements of the building enclosure commissioning processt
22、o meet the OPR.3.2.6.1 DiscussionThe BECx plan may be a portion of the whole building Cx plan.3.2.7 building enclosure commissioning provider, BECxP, na duly authorized person or firm in the jurisdiction of the projectretained by the Owner to develop, manage, and be in responsible charge of the BECx
23、 process.3.2.7.1 DiscussionThe BECxP should be trained, experienced, certified and knowledgeable in the building enclosure commissioning process, andpossess and be able to demonstrate proficiency in the core competencies listed in 4.2.1 of Practice E2813. The person or firmperforming the role of BEC
24、xP should be identified by the Owner. The role of the BECxP may be performed by the BuildingEnclosure Commissioning Specialist (BECxS), the overall building commissioning authority (CxA), or another qualified memberto the Cx team.3.2.8 building enclosure commissioning specialist, BECxS, na registere
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME29472016STANDARDGUIDEFORBUILDINGENCLOSURECOMMISSIONING 建筑 围护结构 调试 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-532152.html