ASTM E144-1994(2006)e1 Standard Practice for Safe Use of Oxygen Combustion Bombs《氧燃烧弹安全使用的标准操作规程》.pdf
《ASTM E144-1994(2006)e1 Standard Practice for Safe Use of Oxygen Combustion Bombs《氧燃烧弹安全使用的标准操作规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM E144-1994(2006)e1 Standard Practice for Safe Use of Oxygen Combustion Bombs《氧燃烧弹安全使用的标准操作规程》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E 144 94 (Reapproved 2006)e1Standard Practice forSafe Use of Oxygen Combustion Bombs1This standard is issued under the fixed designation E 144; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision.
2、 A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.e1NOTEThe warning note was editorially moved into 4.1 in December 2006.1. Scope1.1 This practice covers methods for judging the soundnessof new
3、 and used oxygen combustion bombs, and describes theprecautions to be observed in oxygen bomb combustionmethods.1.2 This practice is applicable to all procedures in whichsamples are completely oxidized by combustion in a metalbomb containing oxygen under pressure. Where there isconflict with specifi
4、c precautions in individualASTM methods,the latter shall take precedence.1.3 The values stated in inch-pound units are to be regardedas the standard. The metric equivalent of inch-pound units maybe approximate.1.4 This standard does not purport to address all of thesafety concerns, if any, associate
5、d with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Physical Requirements2.1 Initial TestThe manufacturer of oxygen combustionbombs for use in ASTM test m
6、ethods shall furnish a certificatewith each new bomb showing that it has satisfactorily passedthe hydrostatic and proof tests described in Sections 3 and 4.When requested, the manufacturer shall supply evidence thatthe bomb is designed and constructed in accordance withrecognized practices for press
7、ure vessel equipment.2.2 Periodic InspectionAll seals and other parts that arerecommended by the manufacturer shall be replaced or re-newed after each 5000 firing or at a more frequent interval ifthe seals or other parts show evidence of deterioration. Thehydrostatic and proof tests described in Sec
8、tions 3 and 4 shallbe repeated if any of the following have occurred:2.2.1 Five thousand firings.2.2.2 Firing with an excessive charge of either sample oroxygen.2.2.3 Ignition of any internal part of the bomb, includingfuel capsule.2.2.4 The evidence of corrosion or surface defects whichexceed 80 %
9、of the manufacturers stated corrosion allowancefor the bomb.2.2.5 Any change in thread tolerances of bomb enclosureswhich exceed the manufacturers specifications.3. Hydrostatic Test3.1 Fill the bomb with water at room temperature andconnect to a suitable hydraulic pressure system. Be sure that allai
10、r has been displaced from the bomb and from the connectinggas passages. Support the bomb so that the diameter at themidsection of the cylinder can be measured with a micrometercaliper, and the deflection at the center point of the bottom canbe measured with a micrometer dial indicator. Apply waterpr
11、essure which is 1.5 times the manufacturers recommendedworking pressure test pressure of the bomb and check the bomband pressure connections for leaks.3.2 With the hydraulic system at atmospheric pressure,measure the diameter at the midsection of the cylinder andobtain a zero reading for the dial in
12、dicator in contact with thecenter point of the bottom of the bomb. Raise the hydrostaticpressure to test pressure and repeat these measurements, thenrelease the pressure and take a third set of measurements withthe system at atmospheric pressure. If the application of testpressure produces a deflect
13、ion greater than 0.005 in. (0.127mm) at the midsection of the cylinder or at the center point ofthe bottom of the bomb, or if any of the bomb parts do notresume their original dimensions when pressure is released,reject the bomb as unsafe.4. Proof Test4.1 Record the outside diameter at the midsectio
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME14419942006E1STANDARDPRACTICEFORSAFEUSEOFOXYGENCOMBUSTIONBOMBS 燃烧弹 安全 使用 标准 操作规程 PDF

链接地址:http://www.mydoc123.com/p-526972.html