1、Designation: D6599 00 (Reapproved 2014)1Standard Practice forConstruction of Live Fascines on Slopes1This standard is issued under the fixed designation D6599; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revisi
2、on. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEAdded editorial changes throughout in September 2014.1. Scope*1.1 This practice covers the material, fabrication and instal-lation work
3、to construct live fascines.1.2 The values in this standard are in SI units and are to beregarded as the standard. The inch-pound units given inparentheses are for information only.1.3 This practice offers a set of instructions for performingone or more specific operations. This document cannot repla
4、ceeducation or experience and should be used in conjunction withprofessional judgement. Not all aspects of this practice may beapplicable in all circumstances. This ASTM standard is notintended to represent or replace standard of care by which theadequacy of a given professional service must be judg
5、ed, norshould this document be applied without considerations of aprojects many unique aspects. The word “Standard” in the titleof this document means only that the document has beenapproved through the ASTM consensus process.1.4 This standard may involve hazardous materials,operations, and equipmen
6、t. This standard does not purport toaddress all of the safety concerns, if any, associated with itsuse. It is the responsibility of the user of this standard toestablish appropriate safety and health practices and deter-mine the applicability of regulatory limitations prior to use.2. Terminology2.1
7、Definitions:2.1.1 live fascine, nin erosion control, a linear bundle oflive cut branches of woody plant material that propagateseasily from cuttings. The bundle is anchored in a shallowtrench and partially covered with soil.2.1.1.1 DiscussionTypically woody plant species (forexample, willow, dogwood
8、, poplar, etc.) are sources for the livecut branches.2.1.2 rolled erosion control product, n a material manu-factured into rolls designed to reduce erosion and assist in thegermination, establishment and/or anchorage of vegetation.2.1.3 dead stout stake, nin erosion control, a wood stakeapproximatel
9、y 0.75 to 1 m (2.5 to 3 ft) in length. Constructdead stout stakes from 50 100 mm (2 4 in.) dimensionallumber cut diagonally along the 100-mm (4-in.) face.2.1.4 live stake, nin erosion control, a woody stem orbranch of vegetatively self-propagating woody plant species.Live stakes are approximately 25
10、 to 40 mm (0.5 to 1.5 in.) indiameter and 0.60 to 0.75 m (2 to 2.5 ft) in length with theterminal end sharpened to a point or a steep angular cut. Uselive stakes as additional anchors and propagating material onthe downslope side of live fascine bundles.3. Summary of Practice3.1 A live fascine is co
11、mprised of live cut plant stems andbranches, typically of woody plant species (for example,willow, dogwood, poplar, etc.) that are formed into linearbundles. These bundles are installed in shallow trenches,secured in the trench with wood stakes, then backfilled withenough soil to leave a small porti
12、on on top of the branch bundleexposed. Live fascines assist to control erosion, encouragevegetative top growth establishment and rooting for shallowsoil stabilization.4. Significance and Use4.1 Live fascines are used to provide erosion and sedimen-tation control by increasing infiltration, slowing o
13、r redirectingrunoff, and trapping seed and sediments. The method providesshallow mechanical surface slope stabilization, and providesenhanced values through vegetative growth and additionalshallow soil reinforcement through the development of theroots. The ability of live fascines to function proper
14、ly dependson the quality and choice of the materials used to construct thelive fascine, the means and methods of fabrication andinstallation, and proper consideration of site characteristics andtime of year. For the live fascine to function completely, it isimportant that the live fascine develops s
15、uitable growth.1This practice is under the jurisdiction of ASTM Committee D18 on Soil andRock and is the direct responsibility of Subcommittee D18.25 on Erosion andSediment Control Technology.Current edition approved Aug. 15, 2014. Published September 2014. Originallyapproved in 2000. Last previous
16、edition approved in 2008 as D6599 00(2008).DOI: 10.1520/D6599-00R14.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States15. Materials5.1 Live Woody Plant Material are woody s
17、tems and branchcuttings of vegetatively self-propagating woody plant species.5.1.1 When constructing a live fascine, use only fresh orwell-preserved viable cuttings. Do not use dead plant materialin live fascines. The stems or branches should be long, straightand flexible to allow easy assembly into
18、 bundles. Typically,plants are harvested near the project site within the sameclimatic zone. Cut the plant material in lengths ranging from 2to4m(6to13ft). Greater lengths may be used if handling andsite conditions allow. The caliper (diameter) of cuttings gen-erally range from 12 to 25 mm (0.5 to 1
19、 in.). The greatestsuccess results from cutting and installing vegetation duringthe dormant season. See Figs. 1-3.5.2 Brush Cutting ImplementsCut live vegetation withtools such as pruning shears, loppers, clearing saws, chainsaws,or similar. Do not use axes or blunt implements.5.3 TiesSecure the bun
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD659920002014E17686STANDARDPRACTICEFORCONSTRUCTIONOFLIVEFASCINESONSLOPES 斜坡 上活柴笼 建造 标准 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-522998.html