ASME PCC-2-2006 Repair of Pressure Equipment and Piping (PCC-2 - 2006)《压力部件和管道的维修》.pdf
《ASME PCC-2-2006 Repair of Pressure Equipment and Piping (PCC-2 - 2006)《压力部件和管道的维修》.pdf》由会员分享,可在线阅读,更多相关《ASME PCC-2-2006 Repair of Pressure Equipment and Piping (PCC-2 - 2006)《压力部件和管道的维修》.pdf(150页珍藏版)》请在麦多课文档分享上搜索。
1、Repair of Pressure Equipment and PipingASME PCC-22006AN AMERICAN NATIONAL STANDARDCopyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASME PCC-22006Repair ofPressureEquipment andPipingAN AMERICAN NATI
2、ONAL STANDARDThree Park Avenue New York, NY 10016Copyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-Date of Issuance: January 15, 2007The next edition of this Standard is scheduled for publication in
3、 2007. There will be no addenda orwritten interpretations of the requirements of this Standard issued to this edition.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American
4、NationalStandards. The Standards Committee that approved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportuni
5、ty for additional public input from industry, academia,regulatory agencies, and the public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in conn
6、ection with anyitems mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any
7、 such patent rights, and the risk of infringement of such rights, isentirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.ASME accepts responsibi
8、lity for only those interpretations of this document issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by individuals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the
9、 prior written permission of the publisher.The American Society of Mechanical EngineersThree Park Avenue, New York, NY 10016-5990Copyright 2007 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.Copyright ASME International Provided by IHS under license with ASME Not f
10、or ResaleNo reproduction or networking permitted without license from IHS-,-,-CONTENTSForeword ivPreparation of Technical Inquiries vCommittee Roster . viPart 1 Scope, Organization, and Intent . 1Part 2 Welded Repairs . 4Article 2.1 Butt-Welded Insert Plates in Pressure Components 4Article 2.2 Exter
11、nal Weld Overlay to Repair Methods for Internal Thinning . 10Article 2.3 Seal-Welded Threaded Connections and Seal Weld Repairs 16Article 2.4 Welded Leak Box Repair . 18Article 2.5 Welded Lip Seals (in the course of preparation) . 22Article 2.6 Full Encirclement Steel Reinforcing Sleeves for Piping
12、. 23Article 2.7 Repair Method Using Fillet Welded Lap Patches With Reinforcing PlugWelds (in the course of preparation) 29Part 3 Mechanical Repairs . 30Article 3.1 Replacement of Pressure Components 30Article 3.2 Freeze Plugs . 32Article 3.3 Damaged Threads in Tapped Holes . 37Article 3.4 Flaw Excav
13、ation and Weld Repair 47Article 3.5 Flange Refinishing . 54Article 3.6 Mechanical Clamp Repair 57Article 3.7 Pipe Straightening or Alignment Bending . 61Article 3.8 Damaged Anchors in Concrete . 64Article 3.9 Valves With Pressure-Seal-Type Bonnets (in the course of preparation) . 73Article 3.10 Hot
14、Bolting (in the course of preparation) 74Part 4 Nonmetallic and Bonded Repairs 75Article 4.1 Nonmetallic Composite Repair Systems for Piping and Pipework:High-Risk Applications 75Article 4.2 Nonmetallic Composite Repair Systems for Piping and Pipework:Low-Risk Applications . 105Article 4.3 Nonmetall
15、ic Internal Lining for Pipe: Sprayed Form for Buried Pipe . 118Part 5 Examination and Testing 128Article 5.1 Pressure and Tightness Testing of Piping and Equipment 128Article 5.2 Repairs and Alterations Without Pressure Testing (in the course ofpreparation) . 142iiiCopyright ASME International Provi
16、ded by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-FOREWORDASME formed an Ad Hoc Task Group on Post Construction in 1993 in response to an increasedneed for recognized and generally accepted engineering standards for the inspection a
17、nd mainte-nance of pressure equipment after it has been placed in service. At the recommendation of thisTask Group, the Board on Pressure Technology Codes and Standards (BPTCS) formed the PostConstruction Committee (PCC) in 1995. The scope of this committee was to develop and maintainstandards addre
18、ssing common issues and technologies related to post-construction activities andto work with other consensus committees in the development of separate, product-specific codesand standards addressing issues encountered after initial construction for equipment and pipingcovered by Pressure Technology
19、Codes and Standards. The BPTCS covers non-nuclear boilers,pressure vessels (including heat exchangers), piping and piping components, pipelines, andstorage tanks.The PCC selects standards to be developed based on identified needs and the availability ofvolunteers. The PCC formed the Subcommittee on
20、Inspection Planning and the Subcommitteeon Flaw Evaluations in 1995. In 1998, a Task Group under the PCC began preparing Guidelinesfor Pressure Boundary Bolted Flange Joint Assembly. In 1999, the PCC formed the Subcommitteeon Repair and Testing. In 2002, the Subcommittee on Flaw Evaluation was disso
21、lved, and replacedby the Joint ASME/API Committee on Fitness for Service. Other topics are under considerationand may be developed into future guideline documents.The subcommittees were charged with preparing standards dealing with several aspects of thein-service inspection and maintenance of press
22、ure equipment and piping. The Inspection PlanningStandard provides guidance on the preparation of a risk-based inspection plan. Defects that areidentified are then evaluated, when appropriate, using the procedures provided in the Fitnessfor Service. Finally, if it is determined that repairs are requ
23、ired, guidance on repair proceduresis provided in the Repair of Pressure Equipment and Piping Standard. These documents are invarious stages of preparation.None of these documents are Codes. They provide recognized and generally accepted goodpractices that may be used in conjunction with Post-Constr
24、uction Codes, such as API 510, API 570,and NB-23, and with jurisdictional requirements.The first edition of ASME PCC-1, Guidelines for Pressure Boundary Bolted Flange Joint Assembly,was approved for publication in 2000. ASME PCC-1-2000 was approved by the American NationalStandards Institute (ANSI)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEPCC22006REPAIROFPRESSUREEQUIPMENTANDPIPINGPCC22006 压力 部件 管道 维修 PDF

链接地址:http://www.mydoc123.com/p-456768.html