《ASME B31 1 INTERPRETATIONS-2013 Interpretations to B31 1 Power Piping (Includes Interpretations No 2 through 6 8 through 10 13 15 17 through 25 27 through 31 and 42 through 47)《B31.pdf》由会员分享,可在线阅读,更多相关《ASME B31 1 INTERPRETATIONS-2013 Interpretations to B31 1 Power Piping (Includes Interpretations No 2 through 6 8 through 10 13 15 17 through 25 27 through 31 and 42 through 47)《B31.pdf(264页珍藏版)》请在麦多课文档分享上搜索。
1、ASME B31.1 INTERPRETATIONSASME B31.1INTERPRETATIONS VOLUME 47Replies to Technical InquiriesJanuary 1, 2012 Through December 31, 2013FOREWORDIt has been agreed to publish interpretations issued by the B31 Committee concerning B31.1as part of the update service to the Code. The interpretations have be
2、en assigned numbers inchronological order. Each interpretation applies either to the latest Edition at the time of issuanceof the interpretation or the Edition or Addenda stated in the reply. Subsequent revisions to theCode may have superseded the reply.The replies are taken verbatim from the origin
3、al letters, except for a few typographical andeditorial corrections made for the purpose of improved clarity. In some instances, a review ofthe interpretation revealed a need for corrections of a technical nature. In these cases, a revisedreply bearing the original interpretation number with the suf
4、fix R is presented. In the case whereaninterpretationiscorrectedbyerrata,theoriginalinterpretationnumberwiththesuffixEisused.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation is available which the inquirer believes might affect the interpretation.
5、 Further,persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcom-mittee. As stated in the Statement of Policy in the Code documents, ASME does not “approve,”“certify,” “rate,” or “endorse” any item, construction, proprietary device, or activity.I-1ASME B31.1 INTER
6、PRETATIONSB31.1Subject Interpretation File No.Figure 127.4.8(D). 47-4 13-849Paragraph 102.3.1(A) (B31.1-2010) 47-1 11-1428Paragraph 127.3(D), Preparation for Welding Spacing (B31.1-2010) 47-5 13-1348Table 132, P-No. 5A (B31.1-2010). 47-2 12-742Table D-1 (B31.1-2010) 47-6 11-1206Welder Requirements (
7、B31.1-2010) . 47-3 11-2032I-2ASME B31.1 INTERPRETATIONSInterpretation: 47-1Subject: Paragraph 102.3.1(A) (B31.1-2010)Date Issued: February 13, 2012File: 11-1428Question: Per ASME B31.1-2010, para. 102.3.1(A), where the weld joint efficiency factor(Ep0.85) is applicable, is the weld joint efficiency
8、factor included in the Appendix A tabulatedvalues of allowable stress?Reply: Yes.Interpretation: 47-2Subject: Table 132, P-No. 5A (B31.1-2010)Date Issued: May 14, 2013File: 12-742Question: For ASME B31.1-2010, may the minimum postweld heat treatment holding tempera-ture range in Table 132 for P-5A b
9、e reduced from 1,300F to 1,250F?Reply: No.Interpretation: 47-3Subject: Welder Requirements (B31.1-2010)Date Issued: May 24, 2013File: 11-2032Question(1): Whenthedesign stipulatesB31.1-2010 forBoilerExternal Piping,cana non-ASMEStamp Holder perform the welding?Reply (1): No.Question (2): When the des
10、ign stipulates B31.1-2010 for Nonboiler External Piping, can anon-ASME Stamp Holder perform the welding?Reply (2): Yes.Question (3): Can a non-ASME Stamp Holder perform repairs to B31.1 piping?Reply (3): This question is outside the scope of ASME B31.1.Interpretation: 47-4Subject: Figure 127.4.8(D)D
11、ate Issued: November 13, 2013File: 13-849Question: May the stress intensification factor for a branch connection listed in Table D-1 beused for the piping connections shown in Fig. 127.4.8(D), Some Acceptable Types of WeldedBranch Attachment Details Showing Minimum Acceptable Welds?Reply: Yes, provi
12、ded the requirements of the Notes of Table D-1 are met.I-3ASME B31.1 INTERPRETATIONSInterpretation: 47-5Subject: Paragraph 127.3(D), Preparation for Welding Spacing (B31.1-2010)Date Issued: November 18, 2013File: 13-1348Question: Per ASME B31.1-2010, Chapter V, para. 127.3(D), Spacing, is the root o
13、pening of aweld joint required to be within the range specified in the WPS?Reply: Yes.Interpretation: 47-6Subject: Table D-1 (B31.1-2010)Date Issued: December 4, 2013File: 11-1206Question: When the geometric or other limitations in ASME B31.1-2010, Table D-1 are not metor for items not listed in Tab
14、le D-1, is the designer responsible for determining the properflexibility and stress intensification factors?Reply: Yes.I-4ASME B31.1 CASESB31.1 Cases No. 37A Case is the official method of handling a reply to an inquiry when study indicates that theCode wording needs clarification, or when the repl
15、y modifies the existing requirements of theCode or grants permission to use new materials or alternative constructions.The text of proposed new and revised B31.1 Cases appear on the ASME Web site athttp:/cstools.asme.org/csconnect/CommitteePages.cfm?CommitteepN10020200 for publicreview. New and revi
16、sed Cases, as well as announcements of annulments, then appear on theWeb site and in the next edition. As of the 1992 and later editions, all Cases currently in effectat the time of publication of an edition are included with it.This update, Cases No. 37, which is included after the last page of the
17、 2014 Edition and theInterpretations Volume 47 that follow, contains the following Cases:175 182 183-1 187 189 190 192The page numbers for the Cases supplements start with C-1 and continue consecutively. TheCases affected by this supplement are as follows:Page Location ChangeC-2 Case 175 AnnulledC-5
18、 Case 183-1 RevisedC-8 Case 189 AddedC-11 Case 190 AddedC-13 Case 192 AddedC-1ASME B31.1 CASESB31 CASE 175ASTM B16 (UNS C36000) and B453 (UNS C35300) in ASME B31.1 ConstructionAnnulment Date: September 28, 2013Reason for Annulment: Requirements incorporated in ASME B31.1 Code.C-2ASME B31.1 CASESB31
19、CASE 182Use of 1.15Ni0.65CuMoCb in ASME B31.1 ConstructionApproval Date: November 10, 2006Inquiry: May A335-05a P36 Class 1 and Class 2, andA182-05a F36 Class 1 and Class 2, be used for B31.1construction?Reply: It is the opinion of the Committee thatA335-05a P36 Class 1 and Class 2, and A182-05a F36
20、Class 1 and Class 2, may be used for B31.1 constructionprovided that all of the following requirements are met:(a) All applicable requirements of ASME B31.1 shallbe met.(b) The maximum allowable stress values and otherdata shown in Table 1 or 1M apply.(c) Separate weld procedure and performance qual
21、ifi-cations shall apply for both classes of this material. Thepostweld heat treatment of the Class 1 and Class 2 mate-rial shall be in accordance with the rules specified inTable 2 or 2M.(d) After either cold bending to strains in excess of5% or any hot bending of this material, the full lengthof th
22、e component shall be heat treated in accordancewith the requirements specified in the material specifica-tion. (See PG-19 of Section I for method for calculatingstrain.)(e) Postweld heat treatment is mandatory under allconditions.C-3(f) This Case number shall be referenced in the docu-mentation and
23、marking of the material, and recordedon the Manufacturers Data Report (if applicable).CAUTIONARY NOTE: Corrosion fatigue occurs by the com-bined actions of cyclic loading and a corrosive environment.In piping systems, corrosion fatigue is more likely to occur inportions of water systems with low str
24、ain rates (0.04 ppm), with a preference toward regions withincreasedlocalstresses.Whilethemechanismsofcrackinitiationand growth are complex and not fully understood, there is con-sensus that the two major factors are strain and waterside envi-ronment. Strain excursions of sufficient magnitude to fra
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEB311INTERPRETATIONS2013INTERPRETATIONSTOB311POWERPIPINGINCLUDESINTERPRETATIONSNO2THROUGH68THROUGH10131517THROUGH2527THROUGH31AND42THROUGH47B31PDF

链接地址:http://www.mydoc123.com/p-456514.html