ASCE MOP 132-2016 Renewal of Potable Water Pipes.pdf
《ASCE MOP 132-2016 Renewal of Potable Water Pipes.pdf》由会员分享,可在线阅读,更多相关《ASCE MOP 132-2016 Renewal of Potable Water Pipes.pdf(114页珍藏版)》请在麦多课文档分享上搜索。
1、Pipeline Infrastructure CommitteeEdited byMohammad Najafi, Ph.D., P.E.; and Mario Perez, Ph.D.Renewal of Potable Water PipesASCE Manuals and Reports on Engineering Practice No. 132ASCE Manuals and Reports on Engineering Practice No. 132Renewal of PotableWater PipesPipeline Infrastructure CommitteeEd
2、ited byMohammad Naja, Ph.D., P.E.Mario Perez, Ph.D.Sponsored by thePipelines Division of theAmerican Society of Civil EngineersPublished by the American Society of Civil EngineersLibrary of Congress Cataloging-in-Publication DataRenewal of potable water pipes / prepared by the Pipeline Infrastructur
3、e Committee of thePipelines Division of the American Society of Civil Engineers ; edited by Mohammad Naja,Ph.D., P.E. Mario Perez, Ph.D.pages cm. (ASCE manuals and reports on engineering practice ; no. 132)Includes bibliographical references and indexISBN 978-0-7844-1374-6 (print : alk. paper) ISBN
4、978-0-7844-7868-4 (PDF : alk. paper)1. Water-pipesFlushing. I. Naja,Mohammad. II. Perez,Mario,1958- III. AmericanSociety of Civil Engineers. Pipeline Infrastructure Committee.T491.R46 2015628.15dc232014030192Published by American Society of Civil Engineers1801 Alexander Bell DriveReston, Virginia 20
5、191-4382www.asce.org/bookstore | ascelibrary.orgAny statements expressed in these materials are those of the individual authors and do notnecessarilyrepresenttheviewsofASCE,whichtakesnoresponsibilityforanystatementmadeherein. No reference made in this publication to any specic method, product, proce
6、ss, orserviceconstitutesorimpliesanendorsement,recommendation,orwarrantythereofbyASCE.ThematerialsareforgeneralinformationonlyanddonotrepresentastandardofASCE,norarethey intended as a reference in purchase specications, contracts, regulations, statutes, or anyotherlegaldocument.ASCEmakesnorepresenta
7、tionorwarrantyofanykind,whetherexpressor implied, concerning the accuracy, completeness, suitability, or utility of any information,apparatus, product, or process discussed in this publication, and assumes no liability therefor.The information contained in these materials should not be used without
8、rst securingcompetent advice with respect to its suitability for any general or specic application. Anyoneutilizingsuchinformationassumesallliabilityarisingfromsuchuse,includingbutnotlimitedto infringement of any patent or patents.ASCE and American Society of Civil EngineersRegistered in U.S. Patent
9、 and TrademarkOfce.Photocopies and permissions. Permission to photocopy or reproduce material from ASCE pub-lications can be requested by sending an e-mail to permissionsasce.org or by locating a title inASCEsCivilEngineeringDatabase(http:/cedb.asce.org)orASCELibrary(http:/ascelibrary.org) and using
10、 the “Permissions” link.Errata: Errata, if any, can be found at http:/dx.doi.org/10.1061/9780784413746Copyright 2016 by the American Society of Civil Engineers.All Rights Reserved.ISBN 978-0-7844-1374-6 (print)ISBN 978-0-7844-7868-4 (PDF)Manufactured in the United States of America.22212019181716 12
11、345MANUALS AND REPORTS ONENGINEERING PRACTICE(As developed by the ASCE Technical Procedures Committee, July 1930,and revised March 1935, February 1962, and April 1982)A manual or report in this series consists of an orderly presentation offactsonaparticularsubject,supplementedbyananalysisoflimitatio
12、nsandapplications of these facts. It contains information useful to the averageengineerinhisorhereverydaywork,ratherthanndingsthatmaybeusefulonlyoccasionallyorrarely.Itisnotinanysensea“standard,”however;noris it so elementary or so conclusive as to provide a “rule of thumb” fornonengineers.Furthermo
13、re, material in this series, in distinction from a paper (whichexpresses only one persons observations or opinions), is the work of acommittee or group selected to assemble and express information on aspecictopic.Asoftenaspracticable,thecommitteeisunderthedirectionofoneormoreofthetechnicaldivisionsa
14、ndcouncils,andtheproductevolvedhas been subjected to review by the executive committee of the division orcouncil. As a step in the process of this review, proposed manuscripts areoftenbroughtbeforethemembersofthetechnicaldivisionsandcouncilsforcomment,whichmayserve asthebasisforimprovement.Whenpubli
15、shed,each work shows the name of the committee that compiled it and indicatesclearly the several processes through which it has passed in review, so thatits merit may be denitely understood.InFebruary1962(andrevisedinApril1982),theBoardofDirectionvotedtoestablishaseriestitled“ManualsandReportsonEngi
16、neeringPractice,”toinclude the Manuals published and authorized to date, future Manuals ofProfessionalPractice,andReportsonEngineeringPractice.AllsuchManualor Report material of the Society would have been refereed in a mannerapproved by the Board Committee on Publications and would be bound,with ap
17、plicable discussion, in books similar to past Manuals. Numberingwould be consecutive and would be a continuation of present Manualnumbers. In some cases of joint committee reports, bypassing of Journalpublications may be authorized.A list of available Manuals of Practice can be found at http:/www.as
18、ce.org/bookstore.This page intentionally left blankPIPELINE INFRASTRUCTURE COMMITTEE (PINS)John F. Jurgens, P.E., M.ASCE, Senior Civil Engineer Specialist, City ofSeattle (Chair)EditorsMohammad Naja, Ph.D., P.E., F.ASCE, Director, Center for UndergroundInfrastructure Research and Education (CUIRE),
19、Department of CivilEngineering, The University of Texas at ArlingtonMario Perez,Ph.D.,Staff Scientist, Electronicshowever, they do not include pipe bursting and replacement. Renewal andrehabilitation include all aspects of upgrading performance of a hostpipeline with an improved or new design life.
20、Pipe bursting can be usedto replace water pipelines and is used particularly to upsize the capacity ofa host pipe. Pipe bursting can also be used in situations where open-cut(OC) techniques on the entire stretch of the pipeline are not possible orwhere excavation is very expensive and social costs o
21、f using the open-cutmethod or installing a parallel line are high. ASCE MOP No. 112 presentspipe bursting and replacement methods using trenchless technology indetail, and the reader is referred to this manual for more information onthese techniques.1Although not a trenchless method, open-cut always
22、 needs to be consid-ered as an option for pipe replacement. Open-cut involves disturbing theground (both surface and subsurface) and requires potentially costlypavement repair or replacement and/or proper disposal of any contami-nated soil that might be discovered. Compared with a trenchless method,
23、OC is often more costly and takes more time to complete (Naja 2013).Most of the extra cost of OC over trenchless methods (approximately 70%of the open-cut costs) is for restoration of the site, shoring installation andremoval, trafc control, backll, and embedment and compaction, andthere is a possib
24、ility of pipe damage during compaction and embedmentefforts.The OCmethod can also disrupt trafc and damage treesand greenareas (refer to Naja 2005, for more information).1.2 CHALLENGES AND CONCERNSRenewal and maintenance of buried pipelines is a major challenge facedby engineers, utility owners, and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASCEMOP1322016RENEWALOFPOTABLEWATERPIPESPDF

链接地址:http://www.mydoc123.com/p-454084.html