ARMY UFGS-44 13 52-2011 THERMAL (CATALYTIC) OXIDATION SYSTEMS.pdf
《ARMY UFGS-44 13 52-2011 THERMAL (CATALYTIC) OXIDATION SYSTEMS.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-44 13 52-2011 THERMAL (CATALYTIC) OXIDATION SYSTEMS.pdf(34页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-44 13 52 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 11 33 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENTSEC
2、TION 44 13 52THERMAL (CATALYTIC) OXIDATION SYSTEMS02/11PART 1 GENERAL1.1 UNIT PRICES1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Design Requirements1.3.2 Inorganic Chemical Concentrations1.3.3 Performance Requirements1.3.4 Off-Gas Composition1.4 SUBMITTALS1.5 QUALIFICATIONS1.5.1 Contractor1.5.2 Single
3、Source Supplier1.5.3 Manufacturers Field Representative1.5.4 Welders1.6 REGULATORY REQUIREMENTS1.7 PARTNERING OR PRE-INSTALLATION CONFERENCE1.8 DELIVERY, STORAGE, AND HANDLING1.9 SEQUENCING AND SCHEDULING1.10 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Standard Products2.1.2 Gener
4、al Requirements2.1.3 Nameplates2.1.4 Equipment Guards and Access2.2 FLARE2.3 ENCLOSED COMBUSTOR2.4 THERMAL OXIDIZER2.5 REGENERATIVE THERMAL OXIDIZER2.6 RECUPERATIVE THERMAL OXIDIZER2.7 CONTAMINANT CONCENTRATION SYSTEM2.8 HEAT RECOVERY SYSTEM2.8.1 Media ChambersSECTION 44 13 52 Page 1Provided by IHSN
5、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.8.2 Heat Exchanger2.9 FLAME TRAP/ARRESTER2.10 INLET PROTECTION2.10.1 Knock-Out Pot2.10.2 Mist Eliminator2.11 IGNITION SYSTEM/BURNER ASSEMBLY2.11.1 Pilot2.11.2 Igniter2.11.3 Burner Assembly2.11.4 Refractory Insulation
6、2.12 EXHAUST TREATMENT2.12.1 Adsorber2.12.2 Scrubber2.13 STACK2.13.1 Minimum Exit Velocity2.13.2 Minimum Elevation2.13.3 Lining2.13.4 Lightning Protection2.13.5 Lugs2.13.6 Access2.13.7 Ladder2.14 PROVISIONS FOR OBSERVATION AND SAMPLING2.14.1 Observation Ports2.14.2 Inlet Sample Port2.14.3 Outlet Sam
7、ple Port2.14.4 Sampling Equipment2.15 CONTROLS2.15.1 Ultraviolet (UV) Flame Scanner2.15.2 Timers2.15.2.1 Purge Timer2.15.2.2 Igniter Timer2.15.2.3 Pilot Timer2.15.2.4 Main Flame Timer2.15.3 Temperature Sensors, Transmitters and Controllers2.15.3.1 Thermocouples2.15.3.2 Thermometers2.15.3.3 Combustio
8、n Chamber Temperature Controller2.15.3.4 Primary Combustion Air Control2.15.3.5 Total Combustion Air Control2.15.3.6 Quenching/Dilution Air Control2.16 FLOW METERS, TRANSMITTERS AND FLOW CONTROLLER2.16.1 Off-Gas Flow Meter2.16.2 Supplemental Fuel Flow Meter2.17 PRESSURE MEASUREMENT AND CONTROL2.17.1
9、 Draft Gauges2.17.2 Pressure Gauges2.17.3 Pressure Switches2.17.4 Pressure Release2.18 EXPLOSIMETER2.18.1 Lower Explosive Limit (LEL)2.18.2 Upper Explosive Limit (UEL)2.19 OXYGEN METERING AND MAKE-UP AIR CONTROL2.19.1 Oxygen Meter2.19.2 Methane Monitor2.20 OPERATING INDICATORS AND ALARMS2.20.1 Visib
10、le Alarms2.20.2 Audible Alarms2.20.3 Remote Alarms2.21 ELECTRICAL WORKSECTION 44 13 52 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.21.1 Motors2.21.2 Control Panels2.21.3 Resistance Heaters2.22 AUXILIARY FUEL SYSTEM2.22.1 Feed Capability2.
11、22.2 Auxiliary Fuel Regulator2.22.3 Secondary Containment2.23 VALVES2.23.1 Butterfly Valves2.23.2 Other Valves2.24 JOINTS2.24.1 Dielectric Fittings2.24.2 Isolation Joints2.24.2.1 Sleeve Type Couplings2.24.2.2 Split Sleeve Couplings2.24.3 Bolts, Nuts, and Fasteners2.25 FACTORY TESTSPART 3 EXECUTION3.
12、1 EXAMINATION3.2 PREPARATION3.3 FOUNDATIONS AND SKID BASES3.4 ERECTION3.4.1 Welding3.4.2 Painting/Corrosion Prevention3.4.2.1 Factory Primed Surfaces3.4.2.2 Touch-Up Painting3.4.2.3 Field Painting3.4.2.4 Corrosion Resistant Metals3.5 INSTALLATION3.5.1 Insulation3.5.2 Utilities3.5.2.1 Electricity3.5.
13、2.2 Water3.5.2.3 Natural Gas3.5.3 Fuel System3.6 POSTING FRAMED INSTRUCTIONS3.7 FIELD QUALITY CONTROL/TESTS3.7.1 Pressure and Leakage Test3.7.2 Operational/Performance Tests3.7.2.1 Constant Flow Tests3.7.2.2 Variable Flow Tests3.7.2.3 Cyclic Flow Tests3.7.3 Sampling and Analyses3.7.4 Test Logs3.8 MA
14、NUFACTURERS FIELD SERVICE3.8.1 Representatives Services3.8.2 Field Training3.9 MAINTENANCE- End of Section Table of Contents -SECTION 44 13 52 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-44 13 52 (Februa
15、ry 2011)-Preparing Activity: USACE SupersedingUFGS-44 11 33 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 44 13 52THERMAL (CATALYTIC) OXIDATION SYSTEMS02/11*NOTE: This guide specification covers the requirements for systems to des
16、troy, by thermal oxidation, organic contaminants contained in an off-gas stream; with options to use concentration system, heat recovery and/or a catalyst to conserve fuel.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or p
17、reparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project
18、, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: Measurement and payment requirements will be specified for work subject to extr
19、eme variation in estimated quantity when unit price bidding is required. This paragraph is not used when quantities can be reasonably calculated from information included in the contract.*Measurement and payment and unit prices for quantities of off-gas treated will be determined in accordance with
20、the Bid Schedule.SECTION 44 13 52 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by
21、 basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wiza
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS4413522011THERMALCATALYTICOXIDATIONSYSTEMSPDF

链接地址:http://www.mydoc123.com/p-449789.html