ARMY UFGS-43 11 00-2008 FANS BLOWERS PUMPS OFF-GAS《风扇 鼓风机 气泵(废气)》.pdf
《ARMY UFGS-43 11 00-2008 FANS BLOWERS PUMPS OFF-GAS《风扇 鼓风机 气泵(废气)》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-43 11 00-2008 FANS BLOWERS PUMPS OFF-GAS《风扇 鼓风机 气泵(废气)》.pdf(42页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-43 11 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-43 11 00 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATI
2、ON, AND STORAGEEQUIPMENTSECTION 43 11 00FANS/BLOWERS/PUMPS; OFF-GAS04/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.2 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Design Requirements1.3.2 Selection Criteria1.3.3 Performance Requirements1.3.4 Service Conditions1.4 SUBMITTALS1.5 QUALITY ASSU
3、RANCE1.5.1 Contractor1.5.2 Single Source Supplier1.5.3 Manufacturers Representative1.5.4 Detailed Drawings1.5.5 Detailed Process Flow Diagrams1.5.6 Piping and Instrumentation Diagram1.6 PARTNERING/PRE-INSTALLATION MEETING1.7 DELIVERY, STORAGE, AND HANDLING1.8 SEQUENCING AND SCHEDULING1.9 EXTRA MATER
4、IALS1.10 MAINTENANCE SERVICEPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Standard Products2.1.2 Nameplates2.2 AIR MOVING EQUIPMENT2.3 FANS2.3.1 Single-Stage2.3.2 Industrial Centrifugal2.3.3 Pressure BlowerSECTION 43 11 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted
5、without license from IHS-,-,-2.3.4 Multiple Stage2.3.5 Backwards Inclined Impeller2.4 DYNAMIC BLOWERS2.4.1 Single Stage Centrifugal2.4.2 Regenerative2.4.3 Axial Flow2.5 POSITIVE DISPLACEMENT BLOWERS2.5.1 Rotary Lobe2.5.2 Helical Screw2.6 VACUUM PUMPS2.6.1 Dry Rotary Blower2.6.2 Water-Sealed Rotary B
6、lower2.6.3 Rotary Vane2.6.4 Liquid Ring2.7 CASING OR HOUSING2.7.1 Constructiion Materials2.7.2 Single Piece Casing2.7.3 Horizontally Split Casing2.7.4 Vertically Split Casing2.7.5 Connections2.7.5.1 Inlet and Discharge Connections2.7.5.2 Casing Drains2.7.5.3 Lifting Eyes2.8 BLADES OR IMPELLERS2.8.1
7、Dynamic Impellers2.8.2 Rotary Lobe Impellers2.9 SHAFT2.10 SEALS, GASKETS AND PACKING2.10.1 Shaft Seals2.10.2 Internal Seals2.10.3 Bearing Seals2.11 BEARINGS2.11.1 Shaft Bearings2.11.2 Blower Bearings2.12 DRIVE CONNECTION2.12.1 Coupling2.12.2 V-Belt Drive2.13 GEARS2.14 LUBRICATION SYSTEM2.14.1 Pressu
8、re Oil2.14.2 Splash Oil2.14.3 Grease2.15 INTAKE FILTER2.15.1 Efficiency2.15.2 Surface Area2.15.3 Media2.15.4 Weather Hood2.16 NOISE MINIMIZATION2.16.1 Silencer2.16.2 Muffler2.16.3 Acoustical Insulation2.16.4 Sound Barriers2.17 MONITORING2.17.1 Flow2.17.2 Temperature2.17.2.1 Thermometers2.17.2.2 Ther
9、mocouples2.17.3 Pressure2.17.3.1 Draft GaugeSECTION 43 11 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.17.3.2 Pressure Gauge2.17.3.3 Differential Pressure Gauge2.17.3.4 Piston Element2.17.3.5 Bellows Element2.17.4 Contaminant Monitoring
10、 and Sampling2.17.4.1 Explosimeter2.17.4.2 Hygrometer2.17.4.3 Sampler2.17.4.4 Transmitter2.17.4.5 Remote Indicator and Recorder2.18 CONTROL SYSTEM2.18.1 Sequence of Control2.18.2 Sequence of Equipment Operation2.18.3 Intake Volume Control2.18.4 Outlet Volume Control2.18.5 Panel2.18.6 Protective Devi
11、ces2.18.6.1 Bearing Temperature2.18.6.2 Surge and Overload Protection2.18.6.3 Oil Temperature and Pressure2.19 ELECTRICAL EQUIPMENT2.19.1 Electric Motors2.19.2 Control Equipment2.19.3 Variable Speed Controls2.19.3.1 Description2.19.3.2 Governing Requirements2.19.3.3 Basic Features2.19.3.4 Protective
12、 Circuits and Features2.19.3.5 Adjustments2.20 APPURTENANCES2.20.1 Dielectric Fittings2.20.2 Isolation Joints2.20.2.1 Sleeve-type Couplings2.20.2.2 Split-sleeve Type Couplings2.20.3 Valves2.20.3.1 Relief Valve2.20.3.2 Unloading Valve2.20.3.3 Combination Relief and Unloading Valve2.20.3.4 Purge Valve
13、2.20.3.5 Vacuum Breaker2.20.3.6 Check Valve2.20.3.7 Control Valve2.20.3.8 Back Pressure Valve2.20.3.9 Manual Valve2.20.4 Inlet and Discharge Elbows2.20.5 Expansion Coupling2.20.6 Heat Exchanger2.20.7 Flame Arrestor2.20.8 Drip Trap2.20.9 Liquid Receiver2.20.10 Air Receiver2.21 BASE PLATE2.22 WEATHERP
14、ROOF ENCLOSURE2.23 ATTACHMENTS2.24 COATINGS OR FINISHES2.25 FACTORY TESTS2.25.1 Integrity2.25.2 Balance2.25.3 DeflectionSECTION 43 11 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.25.4 Vibration2.25.5 Capacity2.25.6 Noise2.25.7 Variable
15、Speed Drive2.25.8 Continuity2.25.9 Receivers2.25.10 Valve TestingPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.2.1 Concrete Foundations3.2.2 Seismic Requirements3.3 FIELD PAINTING3.3.1 Touch-Up Painting3.3.2 Exposed Ferrous Surfaces3.4 MANUFACTURERS FIELD SERVICES3.5 POSTING FRAMED INSTRUCTIONS3.
16、6 FIELD TRAINING3.7 FIELD TESTING3.7.1 Deficiencies3.7.2 Correct Installation3.7.3 Field Equipment Test3.7.4 Noise Suppression- End of Section Table of Contents -SECTION 43 11 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC /
17、 AFCESA / NASA UFGS-43 11 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-43 11 00 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 43 11 00FANS/BLOWERS/PUMPS; OFF-GAS04/08*NOTE: This guide specification covers the requirem
18、ents for fans, blowers or vacuum pumps and drive units.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respecti
19、ve project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Interne
20、t.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: On many hazardous, toxic, radioactive waste (HTRW) projects, the Contractor is required to treat air or off-gas, as well as furnish the equipment. Measurement and payment and u
21、nit pricing may be necessary to cover treatment costs.When it is determined that lump sum contract is advisable this paragraph will be deleted.*Measurement and payment will be based on completed work performed in accordance with the drawings, specifications, and the contract payment SECTION 43 11 00
22、 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-schedules. No additional payment will be made for installation, calibration or commissioning of the equipment.1.1.1 MeasurementVolume of air supplied off-gas treated will be determined by initial
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS4311002008FANSBLOWERSPUMPSOFFGAS 风扇 鼓风机 气泵 废气 PDF

链接地址:http://www.mydoc123.com/p-449788.html