1、*USACE / NAVFAC / AFCESA / NASA UFGS-41 65 10.00 10 (May 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-41 65 10.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION TABLE OF CONTENTSDIVISION 41 - MATERIAL PROCESSING AND HAND
2、LING EQUIPMENTSECTION 41 65 10.00 10DIESELNATURAL GAS FUELED ENGINE PUMP DRIVES05/09PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 General Requirements1.2.2 Performance Requirements1.2.3 Arrangement1.3 SUBMITTALS1.4 WELDER QUALIFICATIONS1.5 REGULATORY REQUIREMENTS1.5.1 General1.5.2 Layout a
3、nd Shop Drawings1.6 DELIVERY, STORAGE, AND HANDLING1.7 PROJECT/SITE CONDITIONS1.8 MAINTENANCE1.8.1 Extra Materials1.8.2 Special ToolsPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Standard Products2.1.2 Nameplates2.1.3 Personnel Safety Devices2.2 MATERIALS2.2.1 Filter Elements2.2.2 Pipe (150 psi Sy
4、stem and Under)2.2.3 Temperature Gauges for Oil or Water Service2.2.4 Pipe Hangers2.2.5 Pressure Gauges2.3 DIESELNATURAL GAS FUELED ENGINE2.3.1 Fuel Consumption2.3.2 Crankcase Pressure Relief Valve2.4 FUEL SYSTEM2.4.1 Fuel Pump2.4.2 FilterSECTION 41 65 10.00 10 Page 1Provided by IHSNot for ResaleNo
5、reproduction or networking permitted without license from IHS-,-,-2.4.3 Strainer2.4.4 Fuel Gas Compressor2.4.5 Safety Bypass Valve2.4.6 Day Tank2.4.6.1 Drain Line2.4.6.2 Local Fuel Fill2.4.6.3 Fuel Level Limit Devices2.4.6.4 Redundant Fuel Shutoff2.4.6.5 Arrangement2.4.7 Fuel Supply System2.4.8 Main
6、 Fuel Storage Tank2.5 LUBRICATION2.5.1 Pump Filters2.5.2 Lube-Oil Sensors2.5.3 Lubricating Oil Strainer2.5.4 Pre-Lubrication Oil Pump2.6 COOLING SYSTEM2.6.1 Coolant Pumps2.6.2 Radiator2.6.2.1 Shell and Tube Heat Exchanger2.6.2.2 Plate and Frame Heat Exchanger2.6.2.3 Cooling Tower2.6.2.4 Submerged Pi
7、pe2.6.3 Thermostatic Control Valve2.6.4 Ductwork2.6.5 Temperature Sensors2.6.6 Expansion Tank2.7 SPECIAL LIMITATIONS2.7.1 Sound Limitations2.7.2 Vibration Isolation and Seismic Restraints2.8 AIR INTAKE EQUIPMENT2.9 EXHAUST SYSTEM2.9.1 Flexible Sections and Expansion Joints2.9.2 Exhaust Muffler2.9.3
8、Exhaust Piping2.10 PYROMETER2.11 EMISSIONS2.12 STARTING SYSTEM2.12.1 Electrical Starting System2.12.1.1 Battery2.12.1.2 Battery Charger2.12.2 Compressed Air Starting System2.12.2.1 Air Filter2.12.2.2 Air Driven Motors or Cylinder Injection2.12.3 Starting Aids2.12.3.1 Jacket-Coolant Heaters2.12.3.2 G
9、low Plugs2.12.3.3 Lube Oil Heaters2.13 SAFETY SYSTEM2.13.1 Audible Signal2.13.2 Visual Signal2.13.3 Alarms and Action Logic2.13.3.1 Shutdown2.13.3.2 Problem2.13.4 Alarm Panel2.13.5 Time-Delay on Alarms2.13.6 Remote Alarm Panel2.14 GOVERNOR2.14.1 Speed Regulating GovernorSECTION 41 65 10.00 10 Page 2
10、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.14.2 Emergency Overspeed Governor and Load Limit2.14.3 Governor Controls Location2.15 ENGINE INSTRUMENT BOARD2.16 PANELS2.16.1 Enclosures2.16.2 Analog Electronic2.16.3 Parameter Display2.17 BASE2.18 M
11、OTORS2.19 PAINTING2.20 FACTORY INSPECTION AND TESTSPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.3 PIPING INSTALLATION3.3.1 Supports3.3.1.1 Ceiling and Roof3.3.1.2 Wall3.3.2 Flanged Joints3.3.3 Cleaning3.3.4 Pipe Sleeves3.4 ELECTRICAL INSTALLATION3.5 ONSITE INSPECTION AND TESTS3.5.1 Contractor Su
12、pplied3.5.2 Instruments3.5.3 Sequence3.5.3.1 Piping Test3.5.3.2 Initial Inspection3.5.3.3 Electric Protective Device Tests3.5.3.4 Safety Run Test3.5.3.5 Final Inspection3.6 MANUFACTURERS FIELD SERVICE3.6.1 Onsite Training3.6.2 Field Engineer3.7 FIELD PAINTING3.8 ACCEPTANCE- End of Section Table of C
13、ontents -SECTION 41 65 10.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-41 65 10.00 10 (May 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-41 65 10.00 10 (January 2008)UNIFIED FACILITIES GUIDE
14、SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION 41 65 10.00 10DIESELNATURAL GAS FUELED ENGINE PUMP DRIVES05/09*NOTE: This guide specification covers the requirement for diesel or natural gas fueled engines used as prime movers for vertical pumps at civil works flood cont
15、rol pumping stations.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not bracket
16、s are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS sh
17、ould be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This guide is intended to be used in the preparation of project specifications along with Section 22 10 00.00 10 VERTICAL PUMPS, AXIAL-FLOW AND MIXED-FLOW IMPELLER-TYPE, and Section 33 45 00.00 10 SPEED REDUCERS FOR STORM WAT
18、ER PUMPS. The Designer should edit the title of this section to reflect appropriate project requirements.The designer is responsible for making a prime mover selection from either an electric motor, a diesel engine, or a natural gas engine. The guidance for making proper selection is contained in EM
19、 1110-2-3105, “Mechanical and Electrical Design of SECTION 41 65 10.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Pumping Stations“.The specification is written for a construction contract. Under a construction contract, these component
20、s can be purchased and installed by a Construction Contractor. A single contract allows the Contractor to obtain the most optimum combination and be responsible for the total performance of the unit, including shaft alignment. This also makes it feasible for the Contractor to perform a dynamic analy
21、sis of the pump, speed reducer, and prime mover system, as described in Section 22 10 00.00 10, and makes the Contractor solely responsible for acquiring the necessary data to perform such analysis.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide s
22、pecification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the re
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS41651000102009DIESELNATURALGASFUELEDENGINEPUMPDRIVES 柴油 天然气 引擎 驱动 PDF

链接地址:http://www.mydoc123.com/p-449787.html