ARMY UFGS-40 05 13 96-2010 WELDING PROCESS PIPING《焊接工艺管路》.pdf
《ARMY UFGS-40 05 13 96-2010 WELDING PROCESS PIPING《焊接工艺管路》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-40 05 13 96-2010 WELDING PROCESS PIPING《焊接工艺管路》.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-40 05 13.96 (May 2010)-Preparing Activity: USACE SupersedingUFGS-43 02 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 40 - PROCESS INTEGRATIONSECTION 40 05 13.96WELDIN
2、G PROCESS PIPING05/10PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS AND SYMBOLS1.3 PERFORMANCE REQUIREMENTS1.4 SUBMITTALS1.5 QUALIFICATIONS1.5.1 Welding Procedures Qualification1.5.2 Welder and Welding Operator Performance1.5.2.1 Certification1.5.2.2 Identification1.5.2.3 Renewal of Qualification1.5.3
3、Inspection and NDE Personnel1.5.3.1 Inspector Certification1.5.3.2 NDE Personnel1.6 REGULATORY REQUIREMENTS1.7 DELIVERY, STORAGE, AND HANDLING1.7.1 Material Control1.7.1.1 Damaged Containers1.7.1.2 Partial Issues1.7.2 Damaged MaterialsPART 2 PRODUCTS2.1 MATERIALSPART 3 EXECUTION3.1 WELDING OPERATION
4、S3.1.1 Base Metal Preparation3.1.2 Weld Joint Fit-Up3.1.3 Preheat and Interpass Temperatures3.1.4 Production Welding Instructions3.1.5 Postweld Heat Treatment3.2 EXAMINATIONS, INSPECTIONS, AND TESTS3.2.1 Random NDE TestingSECTION 40 05 13.96 Page 1Provided by IHSNot for ResaleNo reproduction or netw
5、orking permitted without license from IHS-,-,-3.2.2 Visual Inspection3.2.3 NDE Testing3.2.4 Inspection and Tests by the Government3.3 ACCEPTANCE STANDARDS3.3.1 Visual3.3.2 Magnetic Particle Examination3.3.3 Liquid Penetrant Examination3.3.4 Radiography3.3.5 Ultrasonic Examination3.4 CORRECTIONS AND
6、REPAIRS- End of Section Table of Contents -SECTION 40 05 13.96 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-40 05 13.96 (May 2010)-Preparing Activity: USACE SupersedingUFGS-43 02 00 (April 2006)UNIFIED FA
7、CILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 40 05 13.96WELDING PROCESS PIPING05/10*NOTE: This guide specification covers the requirements for welding of piping and piping system components used for fluids and gases under pressure, including hydraulic s
8、ystems.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.
9、Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submit
10、ted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, d
11、ate, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the SECTION 40 05 13.96 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted wit
12、hout license from IHS-,-,-Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed bel
13、ow form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)ASNT No. SNT-TC-1A (2006; R 1996-2006) Recommended Practice No. SNT-TC-1A, 2006 Edition, and ASNT Standard T
14、opical Outlines for Qualification of Nondestructive Testing Personnel (ANSI/ASNT CP-105-2006)Too many characters (1996) Supplement to Recommended Practice No. SNT-TC-1A (Q R 2001) Standard Welding Terms and DefinitionsAWS B2.1/B2.1M (2009) Specification for Welding Procedure and Performance Qualific
15、ationAWS QC1 (2007) Standard forAWS Certification of Welding InspectorsAWS Z49.1 (2005) Safety in Welding, Cutting and Allied ProcessesASME INTERNATIONAL (ASME)ASME B31.1 (2007; Addenda a-2008) Power PipingASME B31.3 (2008) Process PipingASME B31.4 (2006) Pipeline Transportation Systems for Liquid H
16、ydrocarbons and Other LiquidASME B31.5 (2006) Refrigeration Piping and Heat Transfer ComponentsASME B31.8 (2007) Gas Transmission and Distribution Piping SystemsASME BPVC SEC I (2007; Addenda 2008; Addenda 2009) Boiler and Pressure Vessel Code; Section I, Power SECTION 40 05 13.96 Page 4Provided by
17、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-BoilersASME BPVC SEC II-C (2007; Addenda 2008; Addenda 2009) Boiler and Pressure Vessel Code; Section II, Materials, Part C - Specifications for Welding Rods, Electrodes and Filler MetalsASME BPVC SEC IX (2007; Add
18、enda 2008; Addenda 2009) Boiler and Pressure Vessel Code; Section IX, Welding and Brazing QualificationsASME BPVC SEC V (2007; Addenda 2008; Addenda 2009) Boiler and Pressure Vessel Code; Section V, Nondestructive Examination1.2 DEFINITIONS AND SYMBOLSDefinitions shall be in accordance with AWS A3.0
19、. Symbols shall be in accordance with AWS A2.4.1.3 PERFORMANCE REQUIREMENTS*NOTE: If quality control is to be the responsibility of the Government, delete this paragraph.The paragraphs will be edited and bracketed portions inserted if necessary to ensure proper implementation of the CONTRACTOR QUALI
20、TY CONTROL PROGRAM. The specification writer or design engineer must indicate how much quality control of welding is needed for each project and who is to be responsible; i.e., primarily the Contractor or the Government.In many cases a project may not require 100 percent testing of welds by NDE meth
21、ods. The designer must determine the required methods and the extent of inspection and testing, and must indicate the extent in this or other sections of the project specifications or on the project drawings by notes, NDE symbols, or other means. The referenced applicable publications will be used f
22、or guidance in determining inspection and testing requirements.The specifications or drawings must clearly indicate which joints require 100 percent NDE inspection, which joints require random NDE inspection, and which NDE methods are to be employed for each joint. For random inspection, the drawing
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS400513962010WELDINGPROCESSPIPING 焊接 工艺 管路 PDF

链接地址:http://www.mydoc123.com/p-449786.html