ARMY UFGS-35 01 43-2008 WIRE ROPE FOR GATE OPERATING DEVICES《大门操控装置用钢丝绳》.pdf
《ARMY UFGS-35 01 43-2008 WIRE ROPE FOR GATE OPERATING DEVICES《大门操控装置用钢丝绳》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-35 01 43-2008 WIRE ROPE FOR GATE OPERATING DEVICES《大门操控装置用钢丝绳》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-35 01 43 (April 2008)-Preparing Activity: USACE SupersedingUFGS-35 01 43 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 35 - WATERWAY AND MARINE CONSTRUCTIONSECTION 35 01
2、 43WIRE ROPE FOR GATE OPERATING DEVICES04/08PART 1 GENERAL1.1 SUMMARY1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Work Plan1.3.2 Safety Plan1.3.3 Tools, Equipment and Expertise1.4 SUBMITTALS1.5 SUPERVISORS QUALIFICATIONS1.6 DELIVERY, STORAGE, AND HANDLING1.6.1 General1.6.2 Inspection on Delivery1.7 WAR
3、RANTYPART 2 PRODUCTS2.1 WIRE ROPE AND SOCKETS2.1.1 Quantity2.1.2 Type of Wire Rope2.1.3 Pre-Stretching2.1.4 Wire Strength and Ductility2.1.5 Pre-forming2.1.6 Stress Relief2.1.7 Weld Distribution2.1.8 Galvanizing2.1.9 Pitch Length2.1.10 Core Strand Wires2.1.11 End Terminations2.1.12 Tension Testing2.
4、1.13 Attaching and Proof Loading Terminations2.2 LUBRICATIONPART 3 EXECUTION3.1 EXAMINATIONSECTION 35 01 43 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.1 Inspections3.1.2 Verify Dimensions3.2 ATTACHING SOCKETS3.3 CLEAN DRUMS AND SHEAVES
5、3.4 LUBRICATION3.5 GENERAL REQUIREMENTS3.6 UN-REELING AND INSTALLING WIRE ROPE3.7 REMOVAL OF EXISTING (OLD) WIRE ROPE3.8 FIELD TENSIONING MULTI-LINE HOISTS3.9 BREAK-IN/TESTING3.10 ORDERLY WORK AREA/SITE CLEANUP- End of Section Table of Contents -SECTION 35 01 43 Page 2Provided by IHSNot for ResaleNo
6、 reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-35 01 43 (April 2008)-Preparing Activity: USACE SupersedingUFGS-35 01 43 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 35 01 43W
7、IRE ROPE FOR GATE OPERATING DEVICES04/08*NOTE: This guide specification covers the requirements for supplying and installing wire rope (new or replacement) needed by gate operating devices (i.e. spillway gates, tainter gates, etc.)Edit this guide specification for project specific requirements by ad
8、ding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should
9、be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This guide spec
10、ification is based on the assumption that a single Contractor will be responsible for supply and installation of the wire rope. Please refer to US Army Corps of Engineers Engineer Manual 1110-2-3200 Wire Rope Selection Criteria for Gate-Operating Devices prior to editing this section. It is recommen
11、ded that the designer talk with wire rope manufacturers to get their consensus that the proposed wire rope type can be manufactured and used successfully.If a specification is needed only for supply of wire rope, or for installation of wire rope, there are SECTION 35 01 43 Page 3Provided by IHSNot f
12、or ResaleNo reproduction or networking permitted without license from IHS-,-,-example specifications included in the appendices of US Army Corps of Engineers Engineer Manual 1110-2-3200 Wire Rope Selection Criteria for Gate-Operating Devices. It is also assumed the wire rope is for replacement for a
13、 gate operating device. Paragraphs written in regard to removal of existing wire rope, and cleaning drums and sheaves would need to be deleted if the application is for a new installation.*1.1 SUMMARYIn general, the Contractor shall perform the following work in regard to the operating devices for o
14、ne two three _ spillway tainter _ gates at the _ Project: remove the existing wire rope, furnish new wire rope, and install the new wire rope. Provide all manufacturing facilities, tools, equipment, personnel, and expertise to accomplish this work. The _ Project is located on the _ River approximate
15、ly _ km miles north east south west _ of the city of _.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation,
16、date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the te
17、xt will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basi
18、c designation only.ASTM INTERNATIONAL (ASTM)ASTM A 148/A 148M (2005) Standard Specification for Steel Castings, High Strength, for Structural PurposesASTM A 351/A 351M (2006) Standard Specification for Castings, Austenitic, Austenitic-Ferritic (Duplex), for Pressure-Containing PartsSECTION 35 01 43
19、Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-U.S. ARMY CORPS OF ENGINEERS (USACE)EM 385-1-1 (2003) Safety - Safety and Health RequirementsU.S. GENERAL SERVICES ADMINISTRATION (GSA)FS RR-W-410 (Rev E) Wire Rope and StrandWIRE ROPE TECHNICAL B
20、OARD (WRTB)WRTB (1993) Wire Rope Users Manual1.3 SYSTEM DESCRIPTION1.3.1 Work PlanThe work required per this specification is of a complicated nature, requiring technical expertise and planning. Submit a work plan, which will indicate how the existing wire rope will be removed and how the new wire r
21、ope will be installed, without damaging either existing equipment or the new wire rope. Include in the work plan a schedule indicating how the work will be accomplished within the time limit of this contract. Submit the approved work plan before any work can be performed.1.3.2 Safety PlanThe work ar
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3501432008WIREROPEFORGATEOPERATINGDEVICES 大门 操控 装置 钢丝绳 PDF

链接地址:http://www.mydoc123.com/p-449784.html