1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 52 43.11 (February 2010)-Preparing Activity: USACEUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 52 43.11AVIATION FUEL MECHANICAL EQUIPMENT02/10PART 1 GEN
2、ERAL1.1 REFERENCES1.2 ADMINISTRATIVE REQUIREMENTS1.3 SUBMITTALS1.4 QUALITY ASSURANCEPART 2 PRODUCTS2.1 MATERIALS2.1.1 Types of Fuel2.1.2 Composition of Materials2.1.3 Gaskets2.1.4 Bolts and Nuts2.2 EQUIPMENT AND MATERIAL2.2.1 General2.2.2 Supplier2.3 ELECTRICAL EQUIPMENT2.4 PRESSURE GAGES2.5 AUTOMAT
3、IC PUMP CONTROLS2.5.1 Pressure Indicating Transmitters2.5.2 Flow Switches2.5.3 Venturi Tubes2.5.4 Differential Pressure Transmitter2.5.5 Pressure Sensor2.6 METERS2.7 RECEIPT FLOW METER2.8 PRODUCT RECOVERY TANK AND ACCESSORIES2.8.1 Tank Construction2.8.1.1 Steel Tank With Vault2.8.1.2 Leak Detection
4、Monitor2.8.1.3 Tank Appurtenances and Fittings2.8.1.4 Tank Vents2.8.1.5 Manway2.8.1.6 Sampling and Gauging hatch2.8.1.7 Liquid-level Indicator2.8.1.8 Float Switch AssemblySECTION 33 52 43.11 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.8.1
5、.9 Fuel Transfer Pump (FTP-1)2.8.1.10 Electric Pump2.8.1.11 Lockable Cap2.8.1.12 Spill Containment Basin2.8.1.13 Overfill Valve (OV-1)2.8.1.14 Tank Calibration2.9 FUEL SYSTEM WASTE WATER TANK AND ACCESSORIES2.9.1 Tank Construction2.9.1.1 Steel Tank With Vault2.9.1.2 Leak Detection Monitor2.9.1.3 Tan
6、k Appurtenances and Fittings2.9.1.4 Tank Vents2.9.1.5 Manway2.9.1.6 Sampling and Gauging hatch2.9.1.7 Float Switch Assembly2.9.1.8 Electric Pump2.9.1.9 Overfill Valve (OV-1)2.9.1.10 Tank Calibration2.10 TRUCK OFFLOAD SYSTEM2.10.1 Offload Pump (OP)2.10.2 Air Eliminator Tank2.10.2.1 Tank Housing2.10.2
7、.2 Sight Gauge2.10.2.3 High Level Shutoff2.10.2.4 Level Sensors2.10.2.5 Vent2.10.3 Non-Surge Check/Air Block Valve2.10.4 Offload Fuel Hose2.10.5 Offload Sight Flow Indicator2.10.6 Flood Lights2.10.7 Flowmeter2.10.8 Grounding2.10.9 Grounding Verification Unit2.10.10 Other Offload Equipment2.11 HYDRAN
8、T OUTLET PITS AND ISOLATION VALVE PITS2.11.1 Pit Cover2.11.2 Pit Cover Materials, Design, and Testing2.11.3 Pipe Seal2.11.4 Hydrant Outlet Pit Equipment2.12 HIGH POINT VENT AND LOW POINT DRAIN PITS2.12.1 Pit Assembly2.12.2 Pit2.12.3 Pit Cover, General Requirements2.12.4 Pit Cover Materials, Design,
9、and Testing2.12.5 Pipe Riser Seal2.13 OPERATING TANK LEVEL INDICATOR2.14 OPERATING TANK LEVEL SWITCHES2.15 OPERATING TANK LEVEL SWITCHES2.16 OPERATING TANK LEVEL SWITCHES2.17 WATER DRAW-OFF SYSTEM2.17.1 Tank2.17.2 Sight Glass2.17.3 Return Pump2.17.4 Anchoring2.18 BOWSER PUMPOFF PUMP2.19 TIGHTNESS MO
10、NITORING SYSTEM2.20 TRUCK FILLSTAND OVERFILL PROTECTION AND GROUND VERIFICATION UNIT2.21 DAY TANK2.21.1 TankSECTION 33 52 43.11 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.21.2 Sight Glass2.21.3 Level Sensors2.21.4 Anchoring2.22 JP-8+100
11、INJECTION SYSTEM AND STORAGE TANK2.22.1 Injector Assembly2.22.2 Injector Storage Tanks2.22.3 JP-8+100 Additive Tubing and Conduit2.22.4 JP-8+100 Additive Ball Valves and Strainer2.23 OPERATING TANK VENTPART 3 EXECUTION3.1 GENERAL3.1.1 Installation3.1.2 Anchoring3.1.3 Grouting3.1.4 Leveling and Align
12、ing3.1.5 Direct Drives3.1.5.1 Rotation Direction and Speed3.1.5.2 End Play3.1.5.3 Shaft Leveling and Radial Alignment3.1.5.4 Angular Alignment and End Clearance3.1.5.5 Final Recheck3.1.6 Precautions3.2 INSTALLATION OF UNDERGROUND TANKS3.2.1 Coating Testing3.2.2 Steel Tanks3.3 INSTALLATION OF FIBERGL
13、ASS PITS3.4 POSTED OPERATING INSTRUCTIONS3.4.1 Each System3.4.2 Each Tank3.4.3 Each Item3.4.4 Diagrams3.4.5 Volume of Fuel- End of Section Table of Contents -SECTION 33 52 43.11 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC /
14、AFCESA / NASA UFGS-33 52 43.11 (February 2010)-Preparing Activity: USACEUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 33 52 43.11AVIATION FUEL MECHANICAL EQUIPMENT02/10*NOTE: This guide specification covers the requirements for geneal equipment
15、 required for aircraft refueling systems constructed to the requirements of the DoD Type III/IV/V, and Cutn Cover Hydrant Refueling System Standards. DoD Type III systems shall conform to Standard Design 078-24-28 PRESSURIZED HYDRANT FUELING SYSTEM (TYPE III). DoD Type IV/V systems shall conform to
16、Standard Design 078-24-29 AIRCRAFT DIRECT FUELING SYSTEM (TYPE IV) DESIGN.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not r
17、equired in respective project, whether or not brackets are present.Comments and suggestion on this specification are welcome and should be directed to the technical proponent of the specification. A listing of the technical proponents, including their organization designation and telephone number, i
18、s on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation o
19、nly and listed in this paragraph by organization, designation, date, and title.SECTION 33 52 43.11 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Refe
20、rence Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile refe
21、rences in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.AMERICAN PETROLEUM INSTITUTE (API)API RP 1615 (1996; R 2001) Installation of Underground Petroleum Sto
22、rage SystemsASME INTERNATIONAL (ASME)ASME B16.5 (2009) Standard for Pipe Flanges and Flanged Fittings: NPS 1/2 Through NPS 24ASME B40.100 (2005) Pressure Gauges and Gauge AttachmentsASME BPVC SEC VIII D1 (2007; Addenda 2008; Addenda 2009) Boiler and Pressure Vessel Code; Section VIII, Rules for Cons
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS335243112010AVIATIONFUELMECHANICALEQUIPMENT 航空 燃油 机械设备 PDF

链接地址:http://www.mydoc123.com/p-449762.html