ARMY UFGS-33 52 10-2008 SERVICE PIPING FUEL SYSTEMS《燃料系统用管道(代替 NAVY UFGS-23 11 13 00 20 NAVY UFGS-23 11 16 00 20 NAVY UFGS-23 12 16 00 20)》.pdf
《ARMY UFGS-33 52 10-2008 SERVICE PIPING FUEL SYSTEMS《燃料系统用管道(代替 NAVY UFGS-23 11 13 00 20 NAVY UFGS-23 11 16 00 20 NAVY UFGS-23 12 16 00 20)》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-33 52 10-2008 SERVICE PIPING FUEL SYSTEMS《燃料系统用管道(代替 NAVY UFGS-23 11 13 00 20 NAVY UFGS-23 11 16 00 20 NAVY UFGS-23 12 16 00 20)》.pdf(45页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 52 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-23 11 16.00 20 (April 2006)UFGS-23 11 13.00 20 (April 2006)UFGS-23 12 16.00 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE
2、OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 52 10SERVICE PIPING, FUEL SYSTEMS04/08PART 1 GENERAL1.1 SUMMARY1.1.1 Related Sections1.1.1.1 Welding1.1.1.2 Earthwork1.1.1.3 Cathodic Protection1.1.1.4 Concrete Manholes1.2 REFERENCES1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Material and Equipment Qualific
3、ations1.4.2 Contractor Qualifications1.4.3 Nameplates1.4.4 Regulatory Requirements1.4.4.1 Licensed Personnel1.4.4.2 Stage II Vapor Recovery System1.5 DELIVERY, STORAGE, AND HANDLING1.6 PROJECT/SITE CONDITIONS1.6.1 Fuel SupplyPART 2 PRODUCTS2.1 MATERIALS2.1.1 Gaskets2.1.1.1 Nitrile Butadiene (Buna-N)
4、2.1.1.2 Acrylonitrile Butadiene Rubber (NBR)2.2 ELECTRICAL COMPONENTS2.2.1 General2.2.2 Motors2.2.3 Motor Controllers2.2.4 Underground Wiring2.2.5 Grounding and Bonding2.3 FLANGED END CONNECTIONSSECTION 33 52 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without licen
5、se from IHS-,-,-2.3.1 Flanges2.3.1.1 Carbon Steel2.3.1.2 Stainless Steel2.3.1.3 Aluminum2.3.2 Flange Gaskets, Non-Isolating2.3.3 Flange Gaskets, Electrically Isolating2.3.4 Flange Protectors2.3.5 Flange Bolts, Nuts, and Washers2.3.5.1 Stainless Steel Materials2.3.5.2 Carbon Steel Materials2.4 PIPE2.
6、4.1 Carbon Steel Pipe2.4.1.1 Fittings and End Connections2.4.2 Stainless Steel Pipe2.4.2.1 Fittings 65 mm (2-1/2 in) and Larger2.4.2.2 Fittings 50 mm (2 in) and Smaller2.4.2.3 Control Piping2.4.2.4 Control Piping Fittings2.4.3 Fiberglass Reinforced Plastic (FRP) Pipe2.4.3.1 Fittings and End Connecti
7、ons2.4.4 Exterior Containment Piping System2.4.4.1 Internal Supports2.4.5 Copper Piping2.4.5.1 Fittings and End Connections2.4.5.2 Solder2.4.5.3 Brazing Filler Metal2.5 PIPING COMPONENTS2.5.1 Welded Nipples2.5.2 Steel Couplings2.5.3 Threaded Unions2.5.3.1 Dielectric Type2.5.4 Joint Compound2.5.5 Fle
8、xible Pipe Connector2.5.6 Strainer2.5.7 Thermometers2.5.8 Pressure Gauge2.5.9 Pipe Hangers and Supports2.5.9.1 Pipe Protection Shields2.5.9.2 Low Friction Supports2.5.10 Escutcheon2.5.11 Flexible Ball Joint2.5.12 Bellows Expansion Joint2.5.13 Sight Flow Indicator2.5.14 Fuel Oil Meter2.5.15 Vent Cap2
9、.6 GENERAL VALVES2.6.1 Swing Type Check Valve2.6.2 Wafer Type Check Valve2.6.3 Ball Valve2.6.4 Globe Valve2.6.5 Plug Valve (PTFE Sleeved Tapered Type)2.6.6 Plug Valve (Double Block and Bleed Type)2.6.6.1 Valve Operation2.6.6.2 Pressure Relief2.6.6.3 Bleed Valve2.6.7 Pressure Relief Valve2.6.8 Pressu
10、reVacuum Relief Valve2.6.9 Foot Valve2.6.10 Tank Overfill Prevention ValveSECTION 33 52 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.7 PUMPS2.7.1 Submersible Pump2.7.2 Centrifugal Pump2.7.3 Rotary Pumps2.7.4 Pump Control Panel2.8 FRP CO
11、NTAINMENT SUMP2.9 ACCESSORIES2.9.1 Concrete Anchor Bolts2.9.2 Bolts and Studs2.9.3 Nuts2.9.4 Washers2.9.5 Polytetrafluoroethylene (PTFE) Tape2.9.6 Pipe Sleeves2.9.7 Buried Utility Tape2.10 FINISHES2.10.1 Exterior Coating, Direct Buried Piping2.10.1.1 Factory Coating2.10.1.2 Girth Welds2.10.1.3 Damag
12、ed Coatings2.10.1.4 Rock Shield2.10.2 Exterior Coating, Aboveground Piping2.10.3 New Equipment and Components2.10.3.1 Factory Coating2.10.3.2 Field PaintingPART 3 EXECUTION3.1 INSTALLATION3.1.1 Pumps3.1.2 Piping3.1.2.1 General3.1.2.2 FRP Piping3.1.2.3 Exterior Containment Piping System3.1.2.4 Welded
13、 Connections3.1.2.5 Threaded End Connections3.1.2.6 Brazed Connections3.1.2.7 Existing Piping Systems3.1.3 Bolted Connections3.1.4 Flanges and Unions3.1.5 Flange Protectors3.1.6 Valves3.1.7 Air Vents3.1.8 Sight Flow Indicator3.1.9 Drains3.1.10 Flexible Pipe Connectors3.1.11 Bellows Expansion Joints3
14、.1.12 Thermometers3.1.13 Pipe Hangers and Supports3.1.13.1 Seismic Requirements3.1.13.2 Structural Attachments3.1.14 Pipe Sleeves3.1.15 Escutcheons3.1.16 Pumps3.1.17 Access Panels3.1.18 Buried Utility Tape3.1.19 Framed Instructions3.2 FIELD QUALITY CONTROLS3.2.1 System Commissioning3.2.2 TestsSECTIO
15、N 33 52 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.2.1 Exterior Coating Holiday Test3.2.2.2 Preliminary Pneumatic Test3.2.2.3 Final Pneumatic Test3.2.2.4 Hydrostatic Test3.2.2.5 Exterior Containment Piping Tests3.3 SYSTEM PERFORMANC
16、E TESTS3.4 DEMONSTRATIONS- End of Section Table of Contents -SECTION 33 52 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 52 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-23 11 16.00 20 (A
17、pril 2006)UFGS-23 11 13.00 20 (April 2006)UFGS-23 12 16.00 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 33 52 10SERVICE PIPING, FUEL SYSTEMS04/08*NOTE: This guide specification covers the requirements of interior and exterior fu
18、el piping and accessories for small, non-aviation fueling applications (i.e., gasoline fueling, diesel fueling, fuel oil systems, etc.).Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical prop
19、onents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).Use of electronic communication is encouraged.Brackets are used in the text to indicate designer choices or locations where t
20、ext must be supplied by the designer.*NOTE: Use this UFGS in conjunction with UFC 3-460-01 “Design: Petroleum Fuel Facilities“. Include in this specification any additional equipment/devices necessary to meet state and local regulations.Stage I vapor recovery is the process of recovering vapors when
21、 a storage tank is filled. Stage I vapor recovery is mandatory on all Army Facilities. Stage II vapor recovery is the process of recovering vapors during vehicle fueling operations. Stage II vapor recovery is optional and will be included if required by state and local clean air regulations.The spec
22、ification is written around ASMEs standard Class 150 rating. For applications requiring higher SECTION 33 52 10 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-pressure ratings (e.g., Class 300, etc.), the designer will have to modify this spec
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3352102008SERVICEPIPINGFUELSYSTEMS 燃料 系统 管道 代替 NAVYUFGS2311130020NAVYUFGS2311160020NAVYUFGS2312160020PDF

链接地址:http://www.mydoc123.com/p-449761.html