ARMY UFGS-33 45 00 00 10-2008 SPEED REDUCERS FOR STORM WATER PUMPS《暴雨排水泵的减速器》.pdf
《ARMY UFGS-33 45 00 00 10-2008 SPEED REDUCERS FOR STORM WATER PUMPS《暴雨排水泵的减速器》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-33 45 00 00 10-2008 SPEED REDUCERS FOR STORM WATER PUMPS《暴雨排水泵的减速器》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 45 00.00 10 (April 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-33 45 00.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 45 00.00
2、 10SPEED REDUCERS FOR STORM WATER PUMPS04/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Speed Reducers for Storm Water Pumps1.1.2 Measurement1.1.3 Unit of Measure1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 General Product Requirements1.3.2 Design Conditions1.3.2.1 Operating Conditions1.3.2.2 Runaway1.3.2.3 Cri
3、tical Speeds1.3.3 Arrangement1.4 SUBMITTALS1.5 DELIVERY, SORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.2 BEARINGS2.2.1 Thrust Bearings2.2.2 Radial Bearings2.2.3 Hydrodynamic Fluid Film Bearings2.2.4 Antifriction Bearings2.3 GEARS2.4 SHAFTS2.5 COUPLINGS UNIVERSAL
4、JOINTS2.6 BACKSTOPS2.7 HOUSING2.7.1 General2.7.2 Seals2.7.3 Inspection Covers2.8 LUBRICATION SYSTEM2.8.1 GeneralSECTION 33 45 00.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.8.2 Oil Pumps2.8.3 Prelubrication Pump2.8.4 Oil and Breathe
5、r Filters2.8.5 Heat Exchanger2.8.6 Cooling Water Control Valve2.8.7 Piping and Tubing2.8.8 Oil Heater2.8.9 Lubricating Oil2.9 INSTRUMENTATIONPART 3 EXECUTION3.1 TESTS, INSPECTIONS, AND VERIFICATIONS3.1.1 Shop Testing3.1.2 Installation3.1.3 Field Testing- End of Section Table of Contents -SECTION 33
6、45 00.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 45 00.00 10 (April 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-33 45 00.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSRefere
7、nces are in agreement with UMRL dated March 2008*SECTION 33 45 00.00 10SPEED REDUCERS FOR STORM WATER PUMPS04/08*NOTES: This guide specification covers the requirements for speed reducers used with vertical impeller pumps.Edit this guide specification for project specific requirements by adding, del
8、eting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be direct
9、ed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This guide specification
10、, as written, is for use in construction contracts for the building of pumping stations. If it is to be used in supply contracts, it should be changed as appropriate.The pump, motor, base, electrical power, engine, and clutch (if used) are all related components but are not included in this specific
11、ation.The epicyclic reducer is reliable and especially well suited to high power applications. It should not normally be deleted as an option if the prime mover has a vertical shaft.*SECTION 33 45 00.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
12、m IHS-,-,-1.1 UNIT PRICES*NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, this paragraph title (UNIT PRICES) should be deleted from this section and the remaining appropriately edited subparagraphs below should be inserted into Section 01 22 00.00 1
13、0.*1.1.1 Speed Reducers for Storm Water PumpsPayment will be made for costs associated with furnishing furnishing and installing installing the speed reducers for storm water pumps as specified.1.1.2 MeasurementSpeed reducers for storm water pumps will be measured for payment based upon each speed r
14、educer furnished furnished and installed installed.1.1.3 Unit of MeasureUnit of measure: each.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this p
15、aragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the is
16、sue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are
17、referred to within the text by the basic designation only.AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)ABMA 11 (1990; R 1999) Load Ratings and Fatigue Life for Roller BearingsSECTION 33 45 00.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IH
18、S-,-,-ABMA 9 (1990; R 2000) Load Ratings and Fatigue Life for Ball BearingsAMERICAN GEAR MANUFACTURERS ASSOCIATION (AGMA)AGMA 6010 (1997f) Standard for Spur, Helical, Herringbone, and Bevel Enclosed DrivesAGMA 6025 (1998d; R 2004) Sound for Enclosed Helical, Herringbone and Spiral Bevel Gear DrivesA
19、GMA 6123 (2006) Design Manual for Enclosed Epicyclic Gear DrivesAMERICAN PETROLEUM INSTITUTE (API)API RP 686 (1996) Recommended Practice for Machinery Installation and Installation DesignASME INTERNATIONAL (ASME)ASME B31.1 (2007) Power PipingINTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)ISO 16
20、889 (1999) Hydraulic Fluid Power - Multi-Pass Method for Evaluating Filtration Performance of a Filter ElementNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA 250 (2003) Enclosures for Electrical Equipment (1000 Volts Maximum)NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2007) National
21、 Electrical Code - 2008 Edition1.3 SYSTEM DESCRIPTION1.3.1 General Product Requirements*NOTES: Where possible to meet the required pump speed with the given prime mover speed, and when the prime mover has a horizontal shaft, a single reduction spiral bevel gear reducer should be chosen. Reduction ra
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS33450000102008SPEEDREDUCERSFORSTORMWATERPUMPS 暴雨 水泵 减速器 PDF

链接地址:http://www.mydoc123.com/p-449757.html