1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 40 00 (February 2010)-Preparing Activity: USACE SupersedingUFGS-33 40 00 (August 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 40 00STORM DRAINAGE UT
2、ILITIES02/10PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT1.1.1 Pipe Culverts and Storm Drains1.1.2 Storm Drainage Structures1.1.3 Walls and Headwalls1.1.4 Flared End Sections1.1.5 Sheeting and Bracing1.1.6 Rock Excavation1.1.7 Backfill Replacing Unstable Material1.1.8 Pipe Placed by Jacking1.2 REFERENCE
3、S1.3 SUBMITTALS1.4 DELIVERY, STORAGE, AND HANDLING1.4.1 Delivery and Storage1.4.2 HandlingPART 2 PRODUCTS2.1 PIPE FOR CULVERTS AND STORM DRAINS2.1.1 Concrete Pipe2.1.1.1 Reinforced Arch Culvert and Storm Drainpipe2.1.1.2 Reinforced Elliptical Culvert and Storm Drainpipe2.1.1.3 Nonreinforced Pipe2.1.
4、1.4 Cast-In-Place Nonreinforced Conduit2.1.2 Clay Pipe2.1.3 Corrugated Steel Pipe2.1.3.1 Fully Bituminous Coated2.1.3.2 Half Bituminous Coated, Part Paved2.1.3.3 Fully Bituminous Coated, Part Paved2.1.3.4 Fully Bituminous Coated, Fully Paved2.1.3.5 Concrete-Lined2.1.3.6 Polymer Precoated2.1.3.7 Poly
5、mer Precoated, Part Paved2.1.3.8 Polymer Precoated, Fully Paved2.1.4 Corrugated Aluminum Alloy PipeSECTION 33 40 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.4.1 Aluminum Fully Bituminous Coated2.1.4.2 Aluminum Fully Bituminous Coated
6、, Part Paved2.1.5 Structural Plate, Steel Pipe, Pipe Arches and Arches2.1.6 Structural Plate, Aluminum Pipe, Pipe Arches and Arches2.1.7 Ductile Iron Culvert Pipe2.1.8 Cast-Iron Soil Piping2.1.9 Perforated Piping2.1.9.1 Clay Pipe2.1.9.2 Concrete Pipe2.1.9.3 Corrugated Steel Pipe2.1.9.4 Corrugated Al
7、uminum Pipe2.1.9.5 PVC Pipe2.1.10 PVC Pipe2.1.10.1 Type PSM PVC Pipe2.1.10.2 Profile PVC Pipe2.1.10.3 Smooth Wall PVC Pipe2.1.10.4 Corrugated PVC Pipe2.1.11 PE Pipe2.1.11.1 Smooth Wall PE Pipe2.1.11.2 Corrugated PE Pipe2.1.11.3 Profile Wall PE Pipe2.2 DRAINAGE STRUCTURES2.2.1 Flared End Sections2.2.
8、2 Precast Reinforced Concrete Box2.3 MISCELLANEOUS MATERIALS2.3.1 Concrete2.3.2 Mortar2.3.3 Precast Concrete Segmental Blocks2.3.4 Brick2.3.5 Precast Reinforced Concrete Manholes2.3.6 Prefabricated Corrugated Metal Manholes2.3.7 Frame and Cover for Gratings2.3.8 Joints2.3.8.1 Flexible Watertight Joi
9、nts2.3.8.2 External Sealing Bands2.3.8.3 Flexible Watertight, Gasketed Joints2.3.8.4 PVC Plastic Pipes2.3.8.5 Smooth Wall PE Plastic Pipe2.3.8.6 Corrugated PE Plastic Pipe2.3.8.7 Profile Wall PE Plastic Pipe2.3.8.8 Ductile Iron Pipe2.3.9 Flap Gates2.4 STEEL LADDER2.5 DOWNSPOUT BOOTS2.6 RESILIENT CON
10、NECTORS2.7 HYDROSTATIC TEST ON WATERTIGHT JOINTS2.7.1 Concrete, Clay, PVC and PE Pipe2.7.2 Corrugated Steel and Aluminum Pipe2.8 EROSION CONTROL RIPRAPPART 3 EXECUTION3.1 EXCAVATION FOR PIPE CULVERTS, STORM DRAINS, AND DRAINAGE STRUCTURES3.1.1 Trenching3.1.2 Removal of Rock3.1.3 Removal of Unstable
11、Material3.2 BEDDING3.2.1 Concrete Pipe Requirements3.2.2 Clay Pipe RequirementsSECTION 33 40 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.3 Corrugated Metal Pipe3.2.4 Ductile Iron and Cast-Iron Pipe3.2.5 Plastic Pipe3.3 PLACING PIPE3.
12、3.1 Concrete, Clay, PVC, Ribbed PVC, Ductile Iron and Cast-Iron Pipe3.3.2 Elliptical and Elliptical Reinforced Concrete Pipe3.3.3 Corrugated PE Pipe3.3.4 Corrugated Metal Pipe and Pipe Arch3.3.5 Structural-Plate Steel3.3.6 Structural-Plate Aluminum3.3.7 Multiple Culverts3.3.8 Jacking Pipe Through Fi
13、lls3.4 JOINTING3.4.1 Concrete and Clay Pipe3.4.1.1 Cement-Mortar Bell-and-Spigot Joint3.4.1.2 Cement-Mortar Oakum Joint for Bell-and-Spigot Pipe3.4.1.3 Cement-Mortar Diaper Joint for Bell-and-Spigot Pipe3.4.1.4 Cement-Mortar Tongue-and-Groove Joint3.4.1.5 Cement-Mortar Diaper Joint for Tongue-and-Gr
14、oove Pipe3.4.1.6 Plastic Sealing Compound Joints for Tongue-and-Grooved Pipe3.4.1.7 Flexible Watertight Joints3.4.1.8 External Sealing Band Joint for Noncircular Pipe3.4.2 Corrugated Metal Pipe3.4.2.1 Field Joints3.4.2.2 Flexible Watertight, Gasketed Joints3.5 DRAINAGE STRUCTURES3.5.1 Manholes and I
15、nlets3.5.2 Walls and Headwalls3.6 STEEL LADDER INSTALLATION3.7 BACKFILLING3.7.1 Backfilling Pipe in Trenches3.7.2 Backfilling Pipe in Fill Sections3.7.3 Movement of Construction Machinery3.7.4 Compaction3.7.4.1 General Requirements3.7.4.2 Minimum Density3.7.5 Determination of Density3.8 PIPELINE TES
16、TING3.8.1 Leakage Tests3.8.2 Deflection Testing3.8.3 Post-Installation Inspection3.9 FIELD PAINTING- End of Section Table of Contents -SECTION 33 40 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 40 0
17、0 (February 2010)-Preparing Activity: USACE SupersedingUFGS-33 40 00 (August 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 33 40 00STORM DRAINAGE UTILITIES02/10*NOTE: This guide specification covers the requirements for storm drainage pipin
18、g systems using concrete, clay, steel, ductile iron, aluminum, polyvinyl chloride (PVC), and polyethylene (PE) pipe.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information
19、.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their org
20、anization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: On the project drawing, show:1. Plan and location of all new pipelines, including type of service and size of pipe.2. Location, si
21、ze, and type of service of existing connecting, intersecting, or adjacent pipelines and other utilities.3. Paved areas and railroads which pass over new pipelines.4. Profile, where necessary to show unusual SECTION 33 40 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted w
22、ithout license from IHS-,-,-conditions.5. Invert elevations at beginning and end of pipelines and at manholes or similar structures.6. Class or strength of pipe and limits for same where class or strength will be different for different sections of pipeline. Provide shape requirements if different s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3340002010STORMDRAINAGEUTILITIESPDF

链接地址:http://www.mydoc123.com/p-449756.html