ARMY UFGS-33 26 00 00 10-2008 RELIEF WELLS《减压救险井》.pdf
《ARMY UFGS-33 26 00 00 10-2008 RELIEF WELLS《减压救险井》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-33 26 00 00 10-2008 RELIEF WELLS《减压救险井》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 26 00.00 10 (April 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-33 26 00.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 26 00.00
2、 10RELIEF WELLS04/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Relief Wells1.1.1.1 Payment1.1.1.2 Measurement1.1.1.3 Unit of measure1.1.2 Pump Tests1.1.2.1 Payment1.1.2.2 Measurement1.1.2.3 Unit of measure1.1.3 Pump Installation/Removal1.1.3.1 Payment1.1.3.2 Measurement1.1.3.3 Unit of measure1.2 REFERENCES1
3、.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Shop Drawings1.4.2 Depth of Well1.4.3 Well Design1.5 PROJECT/SITE CONDITIONS1.5.1 Location1.5.2 Obstructions EncounteredPART 2 PRODUCTS2.1 WELL SCREEN2.1.1 PVC Pipe Screen2.1.1.1 Couplings2.1.1.2 Perforations2.1.2 Fiberglass Pipe Screen2.1.2.1 Couplings2.1.2.2
4、 Perforations2.1.3 Steel Pipe Screen2.1.3.1 CouplingsSECTION 33 26 00.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.3.2 Perforations2.1.4 Stainless Steel Well Screen2.1.4.1 Couplings2.1.4.2 Perforations2.1.5 Tailpipe for Well Screen
5、2.2 RISER PIPE2.3 FILTER PACK2.4 CHECK VALVES2.5 CONCRETEPART 3 EXECUTION3.1 DRILLING3.1.1 Reverse Circulation Method3.1.2 Temporary Casing3.2 INSTALLATION OF RISER PIPE AND SCREEN3.2.1 Assembly3.2.2 Joints3.2.3 Installation3.2.4 Check for Plumbness and Alignment3.2.4.1 Plumbness3.2.4.2 Alignment3.3
6、 FILTER PACK PLACEMENT3.4 DEVELOPMENT3.5 BACKFILLING3.6 PLUGGING OF ABANDONED WELLS3.7 TESTS3.7.1 Pump Test3.7.2 Sand Test3.7.3 Filter Pack Sampling and Testing3.7.4 Reports- End of Section Table of Contents -SECTION 33 26 00.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking per
7、mitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 26 00.00 10 (April 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-33 26 00.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 33 26 00.00 10RELIEF WE
8、LLS04/08*NOTE: This guide specification covers the requirements for relief wells, (except materials and equipment specified to be furnished by the Government) to be constructed near dams or levees to relieve the excess hydrostatic pressures created by the presence of pervious strata close to the sur
9、face.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Co
10、mments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitte
11、d as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Relief wells should be constructed of materials which will resist corrosion when installed and should, where practicable, be designed to have a service life equal to that of the structure they are designed to protect. Factors to be considere
12、d in determining selection of material for wells are:1. Operating conditions of wells,2. Corrosive characteristics of soil and water,3. Method of installations,4. Size and depth of wells,SECTION 33 26 00.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license
13、 from IHS-,-,-5. Type of joints, and6. External pressures on well casings.The riser pipe and screen should be designed in all cases to withstand, with a suitable factor of safety, the crushing pressures at depths to which wells extend. Design of relief wells to be constructed under structures must c
14、onsider loads that will be induced into the well pipe due to structural settlement. The wells, including screen and riser pipe, should have a diameter which will permit the maximum design flow without excessive head losses but in no instance should the inside diameter be less than 150 mm (6 inches).
15、 Based on design parameters it may require the designer to include a minimum collapse strength for the pipe and well screen and a minimum clear inside diameter through the fittings and screen to allow the installation of pumps at a later date.Because of the large variation in design and wall thickne
16、ss of the different types of well screen, no generic specifications have been included. For large contracts, specific necessary characteristics should be presented in detail. References to manufacturers should be eliminated.Information on the design of filter packs and relief wells can be found in t
17、he Engineering Manual EM 1110-2-1901, “Seepage Analysis and Control for Dams“. The filter criteria specified in EM 1110-2-1901 should be used to determine the gradation band of the filter material. To minimize segregation during installation of the filter pack, the filter should have a relatively un
18、iform grain-size distribution band. The gradation band of the filter material should be more or less parallel to the gradation curve of the material being drained. No point on the coarser filter gradation curve should be greater than 25 times the corresponding size of the material being drained.The
19、filter material should have a minimum thickness of 150 mm (6 inches) measured radially from the outer circumference of the screen section, and its gradation should depend upon the gradation of the strata being drained. Where unusual conditions are encountered, filter tests should be performed in the
20、 laboratory using the foundation sand and the selected filter. For examples of laboratory investigations refer to Technical Report GL-87-22, dated August 1987, “Laboratory Tests on Granular Filters for Embankment Dams (Includes Appendixes A-E)“; and Technical Memoranda (TM) 183-1, dated Nov 1941, Re
21、v Dec 1941, “Investigation of Filter Requirements for Underdrains“; and Technical Memoranda (TM) 195-1, dated Oct 1942, “Field and Laboratory Investigation of Design Criteria for Drainage Wells“, U. S. Waterways Experiment SECTION 33 26 00.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or
22、networking permitted without license from IHS-,-,-Station. Because of the high potential for clogging by migrating fines or chemical precipitate, filter cloth should not be used to protect relief well screens.In adapting this specification to any project the form and phraseology should be changed as
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS33260000102008RELIEFWELLS 减压 救险 PDF

链接地址:http://www.mydoc123.com/p-449752.html