1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 24 13 (April 2008)-Preparing Activity: USACE SupersedingUFGS-33 24 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 24 13GROUND-WATER MONITOR
2、ING WELLS04/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Test Holes1.1.2 Monitoring Well Drilling and Sampling1.1.3 Geophysical Logging1.1.4 Casing/Riser Pipe Selection and Installation1.1.5 Monitoring Well Screen1.1.6 Filter Pack Construction1.1.7 Bentonite Seal1.1.8 Grout Placement1.1.9 Monitoring Well De
3、velopment1.1.10 Monitoring Well Completion Aboveground1.1.11 Monitoring Well or Test Hole Decommissioning/Abandonment1.1.12 Site Cleanup1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Notification1.3.2 Performance Requirements1.3.3 Well Decommissioning/Abandonment1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Q
4、ualifications1.5.2 Installation Plan1.5.3 Test Holes1.5.4 Sampling1.5.4.1 Sampling for Chemical Analysis1.5.4.2 Sampling for Geotechnical Analysis1.5.5 Geophysical Logging1.6 DELIVERY, STORAGE, AND HANDLING1.7 SITE CONDITIONSPART 2 PRODUCTS2.1 WELL CASING2.2 CENTRALIZERSSECTION 33 24 13 Page 1Provid
5、ed by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.3 WELL SCREEN2.4 FILTER PACK2.5 BENTONITE SEAL2.6 CEMENT AND BENTONITE GROUT2.7 CONCRETE PAD OR GRAVEL BLANKET2.8 PROTECTIVE COVERS2.9 PROTECTIVE POSTS2.10 CONTAINERIZATION OF DEVELOPMENT WATER, AND DRILL C
6、UTTINGS2.11 SAMPLE CONTAINERSPART 3 EXECUTION3.1 PROTECTION OF EXISTING CONDITIONS3.2 PREPARATION3.2.1 Decontamination3.2.2 Decontamination Station3.2.3 Water Source3.3 INSTALLATION3.3.1 Drilling Method3.3.2 Borehole Diameter and Depth3.3.3 Screen, Well Casing/Riser Pipe Placement3.3.4 Filter Pack P
7、lacement3.3.5 Bentonite Seal3.3.6 Grout Placement3.3.7 Concrete or Gravel Pad Placement3.3.8 Protective Cover Placement3.3.8.1 Protective Steel Casing3.3.8.2 Flush-to-Ground Utility Vault3.3.9 Well Identification3.3.10 Well Development3.3.11 In-Situ Permeability Determination3.3.12 Drilling Waste Di
8、sposal3.4 SURVEYS3.5 WELL ACCEPTANCE3.6 SITE CLEANUP3.7 DOCUMENTATION AND QUALITY CONTROL REPORTS3.7.1 Borehole Logs3.7.2 Installation Diagrams3.7.3 Well Development Records3.7.4 Geophysical Logs3.7.5 Well Decommissioning/Abandonment Records3.7.6 Project Photographs3.7.7 Survey Maps and Notes- End o
9、f Section Table of Contents -SECTION 33 24 13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 24 13 (April 2008)-Preparing Activity: USACE SupersedingUFGS-33 24 13 (April 2006)UNIFIED FACILITIES GUIDE SPE
10、CIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 33 24 13GROUND-WATER MONITORING WELLS04/08*NOTE: This guide specification covers the requirements for ground water monitoring wells for hazardous waste sites.Edit this guide specification for project specific requirements by a
11、dding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should
12、 be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICESPaymen
13、t for each specified item will be made at the contract unit price for that item. Payment will include full compensation for equipment, materials and labor for drilling; removal and disposal of temporary casing, cuttings, and drill fluid; preparation of borehole logs; and sample handling, containers,
14、 storage, and testing. Depth, logging, installation, casing, riser pipe, and well screen shall be measured by linear distance. Payment will not be allowed for test holes or monitoring wells abandoned due to construction practices not in accordance with this specification, or for the convenience of t
15、he Contractor.1.1.1 Test HolesIf the total depth of the test hole is greater than that specified in the SECTION 33 24 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-contract for “Test Holes, and Samples,“ the additional depth will be paid f
16、or at the contract unit price for “Additional Test Hole Depth.“ If the test hole is developed into the permanent monitoring well, no separate payment will be made for the test hole.1.1.2 Monitoring Well Drilling and SamplingIf the total depth of the monitoring well is greater than that specified in
17、the contract for “Monitoring Wells and Samples,“ the additional depth will be paid for at the contract unit price for “Additional Monitoring Well Depth.“1.1.3 Geophysical LoggingThe “Geophysical Logging“ unit price will include interpretation of the logs and their delivery to the Government.1.1.4 Ca
18、sing/Riser Pipe Selection and InstallationPayment will be made for length of blank casing actually installed in the well. Payment will include compensation for decontamination and installation of the casing/riser pipe, cap, tail piece (if any), end cap and centralizers; and for the furnishing and in
19、stalling of the well identification tag with information recorded thereon, or well marking as per contract.1.1.5 Monitoring Well ScreenPayment will be made for monitoring well screen actually installed in the well.1.1.6 Filter Pack ConstructionFilter pack construction will be measured by the cubic m
20、eter foot. Payment will include compensation for furnishing, delivering, storage, decontamination, analytical testing, and installing the filter pack.1.1.7 Bentonite SealThe bentonite seal will be measured by the cubic meter foot. Payment will include full compensation for hydrating, and tremieing n
21、ecessary for the work.1.1.8 Grout PlacementThe cement and/or bentonite grout used in the annulus above the bentonite seal will be paid by the cubic meter foot used. Payment will include compensation for cement, mixing of the grout, and pumping of grout, bentonite, mixing of bentonite grout, and pump
22、ing of bentonite grout, necessary for the work.1.1.9 Monitoring Well DevelopmentPayment for monitoring well development will be made by the hour. Payment will include compensation for pumping, surging, bailing, sample photograph, discharge water containers, and disposal.SECTION 33 24 13 Page 4Provid
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3324132008GROUNDWATERMONITORINGWELLS 地下水 监测 水井 PDF

链接地址:http://www.mydoc123.com/p-449751.html