1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 20 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-33 20 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 20 00WATER WELLS04/08PART
2、 1 GENERAL1.1 UNIT PRICES1.1.1 Test Hole1.1.2 Water Well1.1.3 Observation Well1.1.4 Geophysical Logging1.1.5 Well or Test Hole Decommissioning/Abandonment1.1.6 Site Cleanup1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Notification1.3.2 Abandonment of Wells1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Well In
3、stallation Plan1.5.2 Qualifications1.5.3 Test Holes1.5.4 Sampling1.5.4.1 Sampling for Chemical Analysis1.5.4.2 Sampling for Geotechnical Analysis1.5.5 Observation Wells1.5.6 Geophysical Logging1.6 DELIVERY, STORAGE, AND HANDLING1.7 SITE CONDITIONSPART 2 PRODUCTS2.1 CASING2.1.1 Steel Casing and Coupl
4、ings2.1.2 Plastic Casing and Couplings2.2 WELL SCREENS2.2.1 Metal Screen2.2.2 Plastic Screen2.2.2.1 Plastic Pipe2.2.2.2 Bonding MaterialsSECTION 33 20 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.2.3 Plastic Well Screen2.3 FILTER PACK
5、2.4 BENTONITE SEAL2.5 CEMENT AND BENTONITE GROUT2.5.1 Cement Grout2.5.2 Bentonite Grout2.6 PERMANENT PUMP2.7 CONTAINERIZATION OF DEVELOPMENT WATER, AND DRILL CUTTINGS2.8 SAMPLE CONTAINERSPART 3 EXECUTION3.1 PROTECTION OF EXISTING CONDITIONS3.2 PREPARATION3.2.1 Decontamination3.2.2 Decontamination St
6、ation3.2.3 Water Source3.3 WELL CONSTRUCTION3.3.1 Setting Outer Casing3.3.2 Temporary Casing3.3.3 Construction of Inner Casing and Screen3.3.4 Construction of Filter Pack3.3.5 Bentonite Seal3.3.6 Grout Placement3.4 WELL DEVELOPMENT3.4.1 Jetting3.4.2 Intermittent Pumping3.4.3 Surging3.4.4 Well Develo
7、pment Criteria3.5 TESTS3.5.1 Capacity Test3.5.2 Test for Plumbness and Alignment3.5.3 Test for Quality of Water3.5.4 Sand Test3.6 INSTALLATION OF PERMANENT PUMP3.7 DISINFECTING3.8 PUMPHOUSE AND SLAB3.9 SITE CLEAN-UP3.10 DRILLING WASTE DISPOSAL3.11 SURVEYS3.12 WELL DECOMMISSIONING/ABANDONMENT3.13 DOC
8、UMENTATION AND QUALITY CONTROL REPORTS3.13.1 Borehole Logs3.13.2 Installation Diagrams3.13.3 Well Development Records3.13.4 Geophysical Logs3.13.5 Well Decommissioning/Abandonment Records3.13.6 Project Photographs3.13.7 Survey Maps and Notes- End of Section Table of Contents -SECTION 33 20 00 Page 2
9、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 20 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-33 20 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dat
10、ed March 2008*SECTION 33 20 00WATER WELLS04/08*NOTE: This guide specification covers the requirements for drilling of water supply wells in addition to extraction, and injection wells at hazardous, toxic, and radioactive waste (HTRW) sites, and furnishing and installing the pump, and associated test
11、ing.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Com
12、ments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted
13、 as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: TO DOWNLOAD UFGS GRAPHICSGo to http:/wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.DRAWINGSDrawings should include the following and any other information necessary to indicate layout and general configuration of the well.Diameter of drilled holeSECTION
14、 33 20 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Casing sizes - outside casing, inside casingWell screen sizeMinimum depth of outer casing and minimum depth of well screenLimits of gravel envelope around inside casing and screensLimits
15、 of neat cement grout around outer casingLocation of air line and altitude gageType of cap, cover, or seal required at top of wellRequired well capacity in gallons per minute.*1.1 UNIT PRICES*NOTE: Separate pay items for test holes and water wells must be included in the contract.*Payment for each s
16、pecified item will be made at the contract unit price for that item. Payment will include full compensation for equipment, materials and labor for drilling; removal and disposal of temporary casing, cuttings, and drill fluid; preparation of borehole logs; and sample handling, containers, storage, an
17、d testing. Depth, logging, installation, casing, riser pipe, and well screen shall be measured by linear distance. Payment will not be allowed for test holes or wells abandoned due to construction practices not in accordance with this specification, faulty construction practices or for the convenien
18、ce of the Contractor.1.1.1 Test HoleCompensation for the test hole will be made at the contract unit price and will include material, equipment, and labor required to drill and perform tests on the test hole. Depth shall be measured as the total linear distance between ground surface and bottom of h
19、ole. If the total depth of hole is greater than that specified on the contract for “Test Hole,“ the additional depth will be paid for at the contract unit price for “Additional Test Hole Depth.“ If the test hole is developed into the permanent well with no increase in diameter, the Contractor will b
20、e compensated as described below, and separate payment will not be made for the test hole.1.1.2 Water WellCompensation for the water well will be made at the contract unit price and will include material, equipment, and labor required to drill, develop, perform tests, and complete the permanent well
21、. Depth shall be measured as the total linear distance between ground surface and bottom of hole. If the total depth of well is greater than that specified in the contract for “Water Well,“ the additional depth will be paid for at the contract unit SECTION 33 20 00 Page 4Provided by IHSNot for Resal
22、eNo reproduction or networking permitted without license from IHS-,-,-price for “Additional Water Well Depth.“1.1.3 Observation WellCompensation for an observation well will be made at the contract unit price and will include material, equipment and labor required to drill, install, and complete the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3320002008WATERWELLS 水井 PDF