1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 17 24.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-32 17 24.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 1
2、7 24.00 10PAVEMENT MARKINGS04/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Surface Preparation1.1.1.2 Pavement Striping and Markings1.1.1.3 Raised Pavement Markers1.1.1.4 Removal of Pavement Markings1.1.2 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Paint Application Equipment1.3.1.1
3、Self-Propelled or Mobile-Drawn Pneumatic Spraying Machines1.3.1.2 Hand-Operated, Push-Type Machines1.3.2 Thermoplastic Application Equipment1.3.2.1 Thermoplastic Material1.3.2.2 Application Equipment1.3.2.3 Mobile and Maneuverable1.3.3 Reflective Media Dispenser1.3.4 Preformed Tape Application Equip
4、ment1.3.5 Surface Preparation Equipment1.3.5.1 Sandblasting Equipment1.3.5.2 Waterblast Equipment1.3.6 Marking Removal Equipment1.3.6.1 Shotblasting Equipment1.3.6.2 Chemical Equipment1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Qualifications1.5.2 Traffic Controls1.5.3 Maintenance of Traffic1.5.3.1 Air
5、field1.5.3.2 Roads, Streets, and Parking Areas1.6 DELIVERY, STORAGE, AND HANDLING1.7 ENVIRONMENTAL REQUIREMENTSSECTION 32 17 24.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 2 PRODUCTS2.1 PAINT2.2 THERMOPLASTIC COMPOUNDS2.2.1 Compo
6、sition Requirements2.2.2 Physical Properties2.2.2.1 Color2.2.2.2 Drying Time2.2.2.3 Softening Point2.2.2.4 Specific Gravity2.2.3 Asphalt Concrete Primer2.2.4 Portland Cement Concrete Primer2.3 PREFORMED TAPE2.4 RAISED REFLECTIVE MARKERS2.5 REFLECTIVE MEDIA2.6 SAMPLING AND TESTINGPART 3 EXECUTION3.1
7、SURFACE PREPARATION3.1.1 Pretreatment for Early Painting3.1.2 Cleaning Existing Pavement Markings3.1.3 Cleaning Concrete Curing Compounds3.2 APPLICATION3.2.1 Paint3.2.1.1 Rate of Application3.2.1.2 Drying3.2.2 Thermoplastic Compounds3.2.2.1 Longitudinal Markings3.2.2.2 Primer3.2.2.3 Markings3.2.3 Pr
8、eformed Tape3.2.4 Raised Reflective Markers3.2.5 Reflective Media3.3 MARKING REMOVAL3.3.1 Equipment Operation3.3.2 Cleanup and Waste Disposal- End of Section Table of Contents -SECTION 32 17 24.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
9、,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 17 24.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-32 17 24.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 32 17 24.00 10PAVEMENT MARKINGS04/08*NOTE: This guide specif
10、ication covers the requirements for marking and remarking airport and heliport pavements primarily, but may also be used for marking roads, streets and parking areas; this section also includes removal of paint or tape markings from pavement surfaces.Edit this guide specification for project specifi
11、c requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are
12、 welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specif
13、ication includes tailoring options for preformed tape and thermosetting plastic compounds. Selection or deselection of a tailoring option will include or exclude that option in the section, but editing the resulting section to fit the project is still required.*PART 1 GENERAL*NOTE: Pavement markings
14、 are usually removed by water blasting; few chemical methods are effective. Sand or shotblasting may be prohibited by local air pollution regulations. Drawings will show the SECTION 32 17 24.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,
15、-extent of pavement to have markings removed.Removal of raised or recessed markers or reflectors is not covered in this section.*1.1 UNIT PRICES*NOTE: This paragraph should be deleted when pavement marking is included in a lump sum project.*1.1.1 Measurement1.1.1.1 Surface PreparationThe unit of mea
16、surement for surface preparation will be the number of squaremeters feet of pavement surface prepared for marking and accepted by the Contracting Officer.1.1.1.2 Pavement Striping and MarkingsThe unit of measurement for pavement striping and markings will be the number of square meters feet of refle
17、ctive and nonreflective striping or marking actually completed and accepted by the Contracting Officer.1.1.1.3 Raised Pavement MarkersThe unit of measurement for raised pavement markers will be the number of square meters feet of each specific color required. Payment will be for the total number act
18、ually placed and approved by the Contracting Officer.1.1.1.4 Removal of Pavement MarkingsThe unit of measurement for removal of pavement markings shall be the number of square meters feet of pavement markings actually removed and accepted by the Contracting Officer.1.1.2 PaymentThe quantities of sur
19、face preparation, pavement striping or markings, raised pavement markers, and removal of pavement markings determined as specified in paragraph Measurement, will be paid for at the contract unit price. The payment will constitute full compensation for furnishing all labor, materials, tools, equipmen
20、t, appliances, and doing all work involved in marking pavements. Any striping or markings which are placed without reflective media, when reflective media is required, shall be removed and replaced at no cost to the Government. Striping or markings which do not conform to the alignment and/or locati
21、on required shall be removed and replaced at no cost to the Government.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in SECTION 32 17 24.00 10 Page 4
22、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the ref
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS32172400102008PAVEMENTMARKINGS 路面 标线 PDF

链接地址:http://www.mydoc123.com/p-449738.html