ARMY UFGS-32 16 13-2008 CONCRETE SIDEWALKS AND CURBS AND GUTTERS《混凝土人行道 路边石和排水沟》.pdf
《ARMY UFGS-32 16 13-2008 CONCRETE SIDEWALKS AND CURBS AND GUTTERS《混凝土人行道 路边石和排水沟》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 16 13-2008 CONCRETE SIDEWALKS AND CURBS AND GUTTERS《混凝土人行道 路边石和排水沟》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 16 13 (April 2008)-Preparing Activity: USACE SupersedingUFGS-32 16 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 16 13CONCRETE
2、 SIDEWALKS AND CURBS AND GUTTERS04/08PART 1 GENERAL1.1 MEASUREMENT FOR PAYMENT1.1.1 Sidewalks1.1.2 Curbs and Gutters1.2 BASIS FOR PAYMENT1.2.1 Sidewalks1.2.2 Curbs and Gutters1.3 REFERENCES1.4 SYSTEM DESCRIPTION1.4.1 General Requirements1.4.2 Slip Form Equipment1.5 SUBMITTALS1.6 ENVIRONMENTAL REQUIR
3、EMENTS1.6.1 Placing During Cold Weather1.6.2 Placing During Warm WeatherPART 2 PRODUCTS2.1 CONCRETE2.1.1 Air Content2.1.2 Slump2.1.3 Reinforcement Steel2.2 CONCRETE CURING MATERIALS2.2.1 Impervious Sheet Materials2.2.2 Burlap2.2.3 White Pigmented Membrane-Forming Curing Compound2.3 CONCRETE PROTECTI
4、ON MATERIALS2.4 JOINT FILLER STRIPS2.4.1 Contraction Joint Filler for Curb and Gutter2.4.2 Expansion Joint Filler, Premolded2.5 JOINT SEALANTS2.6 FORM WORK2.6.1 Sidewalk Forms2.6.2 Curb and Gutter FormsSECTION 32 16 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted withou
5、t license from IHS-,-,-PART 3 EXECUTION3.1 SUBGRADE PREPARATION3.1.1 Sidewalk Subgrade3.1.2 Curb and Gutter Subgrade3.1.3 Maintenance of Subgrade3.2 FORM SETTING3.2.1 Sidewalks3.2.2 Curbs and Gutters3.3 SIDEWALK CONCRETE PLACEMENT AND FINISHING3.3.1 Formed Sidewalks3.3.2 Concrete Finishing3.3.3 Edge
6、 and Joint Finishing3.3.4 Surface and Thickness Tolerances3.4 CURB AND GUTTER CONCRETE PLACEMENT AND FINISHING3.4.1 Formed Curb and Gutter3.4.2 Curb and Gutter Finishing3.4.3 Concrete Finishing3.4.4 Joint Finishing3.4.5 Surface and Thickness Tolerances3.5 SIDEWALK JOINTS3.5.1 Sidewalk Contraction Jo
7、ints3.5.2 Sidewalk Expansion Joints3.5.3 Reinforcement Steel Placement3.6 CURB AND GUTTER JOINTS3.6.1 Contraction Joints3.6.2 Expansion Joints3.7 CURING AND PROTECTION3.7.1 General Requirements3.7.1.1 Mat Method3.7.1.2 Impervious Sheeting Method3.7.1.3 Membrane Curing Method3.7.2 Backfilling3.7.3 Pr
8、otection3.7.4 Protective Coating3.7.4.1 Application3.7.4.2 Precautions3.8 FIELD QUALITY CONTROL3.8.1 General Requirements3.8.2 Concrete Testing3.8.2.1 Strength Testing3.8.2.2 Air Content3.8.2.3 Slump Test3.8.3 Thickness Evaluation3.8.4 Surface Evaluation3.9 SURFACE DEFICIENCIES AND CORRECTIONS3.9.1
9、Thickness Deficiency3.9.2 High Areas3.9.3 Appearance- End of Section Table of Contents -SECTION 32 16 13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 16 13 (April 2008)-Preparing Activity: USACE Supers
10、edingUFGS-32 16 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 32 16 13CONCRETE SIDEWALKS AND CURBS AND GUTTERS04/08*NOTE: This guide specification covers the requirements for concrete sidewalks and curbs and gutters.Edit this gui
11、de specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggest
12、ions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Ch
13、ange Request (CCR).*PART 1 GENERAL*NOTE: This specification may be adjusted to cover separate curbs and gutters or combination curbs and gutters. This guide specification will not be used for integral or monolithic curbs of concrete pavement or for curbs and gutters for bridges.*1.1 MEASUREMENT FOR
14、PAYMENT*NOTE: The MEASUREMENT FOR PAYMENT and BASIS FOR PAYMENT paragraphs will be deleted if the work covered by this section of the specifications is included in one lump-sum contract price for the entire work covered by the invitation for bids.SECTION 32 16 13 Page 3Provided by IHSNot for ResaleN
15、o reproduction or networking permitted without license from IHS-,-,-*1.1.1 SidewalksThe quantities of sidewalks to be paid for will be the number of square meters yards of each depth of sidewalk constructed as indicated.1.1.2 Curbs and GuttersThe quantities of curbs and gutters to be paid for will b
16、e the number of linear metersfeet of each cross section constructed as indicated, measured along the face of the curb at the gutter line.1.2 BASIS FOR PAYMENT1.2.1 SidewalksPayment of the quantities of sidewalks measured as specified will be at the contract unit price per square meteryard of the thi
17、ckness specified.1.2.2 Curbs and GuttersPayment of the quantities of curbs and gutters measured as specified will be at the contract unit price per linear meter foot of each cross section.1.3 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specificatio
18、n. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in
19、the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications
20、listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)AASHTO M 182 (2005) Standard Specification for Burlap Cloth Made from Jut
21、e or Kenaf and Cotton MatsSECTION 32 16 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM INTERNATIONAL (ASTM)ASTM A 185/A 185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for ConcreteASTM A 615/A 615M (2007)
22、 Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete ReinforcementASTM C 143/C 143M (2005a) Standard Test Method for Slump of Hydraulic-Cement ConcreteASTM C 171 (2007) Standard Specification for Sheet Materials for Curing ConcreteASTM C 172 (2007) Standard Practice for Samp
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3216132008CONCRETESIDEWALKSANDCURBSANDGUTTERS 混凝土 人行道 路边 排水沟 PDF

链接地址:http://www.mydoc123.com/p-449736.html