1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 13 73 (April 2008)-Preparing Activity: USACE SupersedingUFGS-32 13 73 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 13 73COMPRESS
2、ION JOINT SEALS FOR CONCRETE PAVEMENTS04/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.2 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Joint Cleaning Equipment1.3.1.1 Concrete Saw1.3.1.2 Sandblasting Equipment1.3.1.3 Waterblasting Equipment1.3.2 Sealing Equipment1.3.3 Test Requirements1.4 S
3、UBMITTALS1.5 QUALITY ASSURANCE1.5.1 Safety1.5.2 Trial Joint Seal and Lubricant/Adhesive Installation1.6 DELIVERY, STORAGE, AND HANDLING1.7 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 COMPRESSION SEALS2.2 LUBRICANT/ADHESIVEPART 3 EXECUTION3.1 PREPARATION OF JOINTS3.1.1 Sawing3.1.2 Sandblast Cleaning
4、3.1.3 Waterblast Cleaning3.1.4 Rate of Progress3.2 INSTALLATION OF THE COMPRESSION SEAL3.2.1 Time of Installation3.2.2 Sequence of Installation3.3 SEALING OF JOINTSSECTION 32 13 73 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4 CLEAN-UP3.5
5、 QUALITY CONTROL PROVISIONS3.5.1 Application Equipment3.5.2 Procedures3.5.2.1 Quality Control Inspection3.5.2.2 Conformance to Stretching and Compression Limitations3.5.2.3 Pavement Temperature3.5.3 Final Inspection- End of Section Table of Contents -SECTION 32 13 73 Page 2Provided by IHSNot for Res
6、aleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 13 73 (April 2008)-Preparing Activity: USACE SupersedingUFGS-32 13 73 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 32 1
7、3 73COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS04/08*NOTE: This guide specification covers the requirements for polychloroprene compression seals used for sealing joints of rigid pavements for airfields, roads, streets, hardstands, and other areas.Edit this guide specification for project specifi
8、c requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are
9、 welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*N
10、OTE: For U.S. Air Force pavements, the engineer will specify the uncompressed width of the seals to be used, and the width of the saw cut reservoir including tolerances. The minimum sawed joint seal reservoir width will be 13 mm (1/2 inch). The specified uncompressed seal width will be twice the spe
11、cified nominal saw cut reservoir width, i.e., for a 13 mm (1/2 inch) wide joint seal reservoir saw cut, a 25 mm (1 inch) uncompressed width joint seal should be specified.Total joint opening and movement must be considered SECTION 32 13 73 Page 3Provided by IHSNot for ResaleNo reproduction or networ
12、king permitted without license from IHS-,-,-when specifying the size of the joint and seal. The engineer should carefully consider all factors affecting the proper sizing of the joint seal to assure the seal remains within the allowable compression range and that the working range of the proposed se
13、al is always greater than the total movement of the joints. The computational procedures in UFC 3-250-08FA Chapter 7, Appendix C, should be followed. Factors to be considered are saw cut reservoir width including tolerances, maximum pavement thermal expansion and contraction, pavement shrinkage duri
14、ng curing and pavement temperature limitations during joint seal reservoir sawing.Compression joint seal size, general shape and dimensional tolerances, especially uncompressed seal width, must be shown on the drawings or specified in this section. Manufacturers literature is helpful in determining
15、the seal size with the anticipated joint movement.*1.1 UNIT PRICES*NOTE: Paragraphs MEASUREMENT and PAYMENT will be deleted for lump sum bidding.*1.1.1 MeasurementThe quantity of each sealing item to be paid for will be determined by measuring the length of in-place material that has been approved.1
16、.1.2 PaymentPayment will be made at the contract unit bid prices per unit length for the sealing items scheduled, including approved trail joint installation. Include in the unit bid prices the cost of all labor, materials, the use of all equipment, and tools required to complete the work.1.2 REFERE
17、NCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature
18、 when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.SECTION 32 13 73 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted wi
19、thout license from IHS-,-,-References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The
20、publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM D 2628 (1991; R 2005) Standard Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete PavementsASTM D 2835 (1989; R 2007) Lubricant for Installation of Preformed Compres
21、sion Seals in Concrete PavementsU.S. ARMY CORPS OF ENGINEERS (USACE)COE CRD-C 548 (1988) Standard Specification for Jet-Fuel and Heat Resistant Preformed Polychloroprene Elastomeric Joint Seals for Rigid Pavements1.3 SYSTEM DESCRIPTIONProvide machines, tools, and equipment, used in the performance o
22、f the work required by this section, approved before the work is started and maintained in satisfactory condition at all times.1.3.1 Joint Cleaning Equipment1.3.1.1 Concrete SawProvide a self-propelled power saw with water-cooled diamond saw blades for cutting joints to the depths and widths specifi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3213732008COMPRESSIONJOINTSEALSFORCONCRETEPAVEMENTS 混凝土 路面 压力 接合 密封 PDF

链接地址:http://www.mydoc123.com/p-449734.html